ROADWORKS SUMMARY
Mons Way, ABINGDON, OX14 1NJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Mons Way, OX14 1NJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Mons Way, ABINGDON, OX14 1NJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mons Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Between
3 Sep 2023 and 30 Mar 2027
Details
View Map
Share
Follow
Kennington Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Kennington Roundabout, Oxford.

These works are categorised as Major.

The works will start on or after 3 September 2023 and could run through until 30 March 2027. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 25 Oct 2022 at 09:34.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Grenoble Road

Thames Water are carrying out Utility asset works on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:17 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.

Oxfordshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Unnamed--single Carriageway (41608977)

Oxfordshire County Council are carrying out Highway improvement works on Unnamed--single Carriageway (41608977), Wantage.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:20 and could run through until 25 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 25 Oct 2024 at 13:44.

Oxfordshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wantage Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Wantage Road, Frilford, Abingdon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 20:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 24 Oct 2024 at 13:56.

Oxfordshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Oxford Road, East Hanney, Wantage.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 20:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 24 Oct 2024 at 13:56.

Oxfordshire County Council logo
LONG TERM
Until
28 Jan 2025
Details
View Map
Share
Follow
The Towing Path

Oxfordshire County Council are carrying out Highway repair and maintenance works on The Towing Path, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:30 and could run through until 28 January 2025. The works will impact the footway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Sep 2024 at 09:25.

Oxfordshire County Council logo
LONG TERM
Until
28 Jan 2025
Details
View Map
Share
Follow
The Towing Path

Oxfordshire County Council are carrying out Highway repair and maintenance works on The Towing Path, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:30 and could run through until 28 January 2025. The works will impact the footway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Sep 2024 at 09:25.

Oxfordshire County Council logo
LONG TERM
Between
9 Sep 2024 and 30 May 2029
Details
View Map
Share
Follow
Section Of Southern Bypass Between Hinksey Hill Roundabout And Kennington Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of Southern Bypass Between Hinksey Hill Roundabout And Kennington Roundabout, South Hinksey, Oxford.

These works are categorised as Major.

The works will start on or after 9 September 2024 and could run through until 30 May 2029. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 6 Mar 2024 at 09:44.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Wootton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wootton Road, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2024 at 14:30.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Wootton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wootton Road, Abingdon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 08:12.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Cumnor, Oxford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 11:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:35.

Oxfordshire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Unnamed-a4130-single Carriageway (41610237)

Oxfordshire County Council are carrying out roadworks on Unnamed-a4130-single Carriageway (41610237), Milton, Abingdon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 07:30 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 15:39.

Oxfordshire County Council logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Milton Interchange Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Interchange Roundabout, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 7 Oct 2024 at 13:50.

Oxfordshire County Council logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Milton Interchange Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Interchange Roundabout, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Sep 2024 at 12:59.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Bayworth Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Bayworth Lane, Boars Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:07.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Bayworth Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Bayworth Lane, Boars Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 15:58.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Swinburne Road

Thames Water were proposing to carry out Utility repair and maintenance works on Swinburne Road, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 12:08.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Penlon Place

Thames Water are proposing to carry out Utility repair and maintenance works on Penlon Place, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 13:51.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Penlon Place

Thames Water are proposing to carry out Utility repair and maintenance works on Penlon Place, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 11:02.

Oxfordshire County Council logo
LONG TERM
Between
5 Jan and 1 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Ock Street

Thames Water were proposing to carry out Utility repair and maintenance works on Ock Street, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:28.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Hurst Rise Road

Thames Water are proposing to carry out Utility asset works on Hurst Rise Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:11.

Oxfordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Digging Lane

Oxfordshire County Council are proposing to carry out Highway improvement works on Digging Lane, Fyfield, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 1 Oct 2024 at 11:13.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Hurst Rise Road

Thames Water are proposing to carry out Utility asset works on Hurst Rise Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:40.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Marcham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Marcham Road, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 18 Sep 2024 at 12:29.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Marcham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Marcham Road, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 18 Sep 2024 at 12:25.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 10 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Section 58 on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Old Boars Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Old Boars Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 15:49.

Scottish Hydro Electric Power Dis logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Wootton Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wootton Road, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Nov 2024 at 12:00.

Thames Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Bath Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bath Street, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:12.

Thames Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Bath Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bath Street, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:42.

Oxfordshire County Council logo
LONG TERM
Between
13 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Road Running Through Nuneham Courtenay

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Road Running Through Nuneham Courtenay, Nuneham Courtenay, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 16 Oct 2024 at 10:04.

Thames Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Church Way

Thames Water are proposing to carry out Utility repair and maintenance works on Church Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:51.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Steventon Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Trenchard Avenue

Oxfordshire County Council are proposing to carry out Highway improvement works on Trenchard Avenue, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 11:21.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan and 18 Apr 2025
Details
View Map
Share
Follow
Road Running Through Nuneham Courtenay

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Road Running Through Nuneham Courtenay, Nuneham Courtenay, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 22 Oct 2024 at 14:13.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Sheepstead Road

Oxfordshire County Council are proposing to carry out Diversionary works on Sheepstead Road, Marcham, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 15 Nov 2024 at 14:49.

Oxfordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Sheepstead Road

Oxfordshire County Council are proposing to carry out roadworks on Sheepstead Road, Marcham, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Oxfordshire County Council on 14 Nov 2024 at 13:40.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Section Of A4074 - No Properties (36202411)

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Section Of A4074 - No Properties (36202411), Berinsfield, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 13:59.

Oxfordshire County Council logo
Between
2 and 28 Feb 2025
Details
View Map
Share
Follow
Didcot A4130 Perimeter Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot A4130 Perimeter Road, Didcot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 15:58.

Thames Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Netherton Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Netherton Road, Appleton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 12:50.

Oxfordshire County Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Blackbird Leys Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Blackbird Leys Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 13:35.

Oxfordshire County Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Blackbird Leys Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Blackbird Leys Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 13:37.

Thames Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
North Hinksey Lane

Thames Water are proposing to carry out Utility repair and maintenance works on North Hinksey Lane, North Hinksey, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:13.

Oxfordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (41608803)

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Unnamed--single Carriageway (41608803), Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 10 Oct 2024 at 15:24.

Oxfordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lane Running Through Netherton

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Lane Running Through Netherton, Netherton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 30 Sep 2024 at 15:13.

Oxfordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Lane Running Through Netherton

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Lane Running Through Netherton, Netherton, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 10 Oct 2024 at 11:16.

Oxfordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lane Running Through Netherton

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Lane Running Through Netherton, Netherton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 12:04.

Oxfordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Lane Running Through Netherton

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Lane Running Through Netherton, Netherton, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 10 Oct 2024 at 11:17.


Roadworks Map near to Mons Way, ABINGDON, OX14 1NJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 20:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Mons Way, ABINGDON, OX14 1NJ (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
INKERMAN CLOSE 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.1
Details
Share
Follow
2
BT logo
HARDING ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.2
Details
Share
Follow
3
Scottish Hydro Electric Power Dis logo
WOOTTON ROAD 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 15 Nov 2024 - 28 Nov 2024)
0.4
Details
Share
4
Southern Gas Networks logo
MAJOR
  
WOOTTON ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 30 Sep 2024 08:00
(Scheduled: 30 Sep 2024 - 20 Dec 2024)
0.5
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
WOOTTON ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 30 Sep 2024 - 20 Dec 2024
0.5
Details
Share
Follow
6
Southern Gas Networks logo
EMERGENCY
  
WOOTTON ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 11 Nov 2024 11:00
(Scheduled: 11 Nov 2024 - 29 Nov 2024)
0.5
Details
Share
Follow
7
Oxfordshire County Council logo
WOOTTON ROAD 
(0.6 miles)
Oxfordshire County Council
Highway improvement works - Footway, Verge - No carriageway incursion
Complete
21 Nov 2024 09:00 - 15:20
0.6
Details
Share
8
Scottish Hydro Electric Power Dis logo
CONDUIT ROAD 
(0.6 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Give and take
Complete
13 Nov 2024 08:15 - 21 Nov 2024 15:30
0.6
Details
Share
9
Thames Water logo
OCK STREET 
(0.6 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 20 Nov 2024 - 21 Nov 2024
0.6
Details
Share
Follow
10
Southern Gas Networks logo
MAJOR
  
FRANCIS LITTLE DRIVE 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 7 Oct 2024 - 16 Dec 2024
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.