ROADWORKS SUMMARY
Spring Terrace, ABINGDON, OX14 1AP
Introduction
View current and future planned roadworks and road closures for Spring Terrace, OX14 1AP and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Spring Terrace, ABINGDON, OX14 1AP
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Spring Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
3 Sep 2023 and 30 Mar 2027
Oxfordshire County Council are proposing to carry out Highway improvement works on Kennington Roundabout, Oxford.
These works are categorised as Major.
The works will start on or after 3 September 2023 and could run through until 30 March 2027. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 25 Oct 2022 at 09:34.
31 Jan 2025
Thames Water are carrying out Utility asset works on Grenoble Road, Sandford-on-thames, Oxford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 08:17 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.
13 Dec 2024
Oxfordshire County Council are carrying out Highway improvement works on Unnamed--single Carriageway (41608977), Wantage.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 July 2024 at 08:20 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 22 Nov 2024 at 10:08.
9 Dec 2024
Oxfordshire County Council are carrying out Highway repair and maintenance works on Wantage Road, Frilford, Abingdon.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 August 2024 at 20:00 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 22 Nov 2024 at 10:12.
9 Dec 2024
Oxfordshire County Council are carrying out Highway repair and maintenance works on Oxford Road, East Hanney, Wantage.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 August 2024 at 20:00 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 22 Nov 2024 at 10:14.
9 Sep 2024 and 30 May 2029
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of Southern Bypass Between Hinksey Hill Roundabout And Kennington Roundabout, South Hinksey, Oxford.
These works are categorised as Major.
The works will start on or after 9 September 2024 and could run through until 30 May 2029. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 6 Mar 2024 at 09:44.
30 Sep and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wootton Road, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2024 at 14:30.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Wootton Road, Abingdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 08:12.
Friday
Oxfordshire County Council are proposing to carry out Section 50 on Abingdon Road, Didcot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 22 Oct 2024 at 09:50.
Friday
Oxfordshire County Council are carrying out Section 50 on Abingdon Road, Didcot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 14:43.
Friday
Oxfordshire County Council are proposing to carry out Section 50 on Lady Grove, Didcot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 14:01.
Friday
Oxfordshire County Council are carrying out Section 50 on Lady Grove, Didcot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 15:05.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Cumnor, Oxford.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 11:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 08:51.
Today
Oxfordshire County Council are carrying out roadworks on Unnamed-a4130-single Carriageway (41610237), Milton, Abingdon.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 07:30 and could run through until 24 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 15:39.
2 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Cumnor Road, Boars Hill, Oxford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 16:05 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 16:06.
Thursday
Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Interchange Roundabout, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 12 Sep 2024 at 12:59.
Thursday
Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Interchange Roundabout, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 7 Oct 2024 at 13:50.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Bayworth Lane, Boars Hill, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 15:58.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Bayworth Lane, Boars Hill, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:07.
9 and 11 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Swinburne Road, Abingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 12:08.
16 and 18 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Penlon Place, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 11:02.
16 and 18 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Penlon Place, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 13:51.
5 Jan and 1 Nov 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.
6 Jan and 17 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Marcham Road, Abingdon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 18 Sep 2024 at 12:29.
6 and 10 Jan 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Digging Lane, Fyfield, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 1 Oct 2024 at 11:13.
6 and 8 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Ock Street, Abingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:28.
6 Jan and 17 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Marcham Road, Abingdon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 18 Sep 2024 at 12:25.
6 Jan and 10 Nov 2025
Oxfordshire County Council are proposing to carry out Section 58 on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Old Boars Hill, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 15:49.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bath Street, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:12.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bath Street, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:42.
8 and 24 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wootton Road, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Nov 2024 at 12:00.
13 Jan and 4 Apr 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Road Running Through Nuneham Courtenay, Nuneham Courtenay, Oxford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 16 Oct 2024 at 10:04.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Way, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:51.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Trenchard Avenue, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Steventon, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 11:21.
27 Jan and 18 Apr 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Road Running Through Nuneham Courtenay, Nuneham Courtenay, Oxford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 22 Oct 2024 at 14:13.
29 and 31 Jan 2025
Oxfordshire County Council are proposing to carry out Diversionary works on Sheepstead Road, Marcham, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 15 Nov 2024 at 14:49.
29 and 31 Jan 2025
Oxfordshire County Council are proposing to carry out roadworks on Sheepstead Road, Marcham, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Oxfordshire County Council on 14 Nov 2024 at 13:40.
2 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot A4130 Perimeter Road, Didcot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 15:58.
2 Feb and 18 Apr 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Section Of A4074 - No Properties (36202411), Berinsfield, Wallingford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 13:59.
3 and 5 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Netherton Road, Appleton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 12:50.
5 and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Grove Road, Harwell, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:54.
17 and 21 Feb 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Unnamed--single Carriageway (41608803), Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 10 Oct 2024 at 15:24.
17 and 21 Feb 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Lane Running Through Netherton, Netherton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 30 Sep 2024 at 15:13.
17 and 21 Feb 2025
Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Lane Running Through Netherton, Netherton, Abingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 10 Oct 2024 at 11:16.
17 and 21 Feb 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Lane Running Through Netherton, Netherton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 12:04.
17 and 21 Feb 2025
Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Lane Running Through Netherton, Netherton, Abingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 10 Oct 2024 at 11:17.
Roadworks Map near to Spring Terrace, ABINGDON, OX14 1AP
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Spring Terrace, ABINGDON, OX14 1AP (19 Events)
(Scheduled Dates)
(miles)
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
(Scheduled: 8 May 2024 - 19 Feb 2025)
Contains public sector information licensed under the Open Government Licence v3.0.