ROADWORKS SUMMARY
South Parks Road, OXFORD, OX1 3RB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for South Parks Road, OX1 3RB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to South Parks Road, OXFORD, OX1 3RB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for South Parks Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Cripley Road

Network Rail are carrying out Works for Rail Purposes on Cripley Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2023 at 07:30 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Sep 2024 at 12:04.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Roger Dudman Way

Network Rail are carrying out Works for Rail Purposes on Roger Dudman Way, Oxford.

These works are categorised as Major.

The works started on 25 January 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 13:05.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Roger Dudman Way

Network Rail are carrying out Works for Rail Purposes on Roger Dudman Way, Oxford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 March 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 13:06.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Becket Street

Network Rail are carrying out Works for Rail Purposes on Becket Street, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2023 at 00:01 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Sep 2024 at 16:13.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Botley Road

Network Rail are carrying out Works for Rail Purposes on Botley Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2023 at 00:01 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Sep 2024 at 16:12.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Ferry Hinksey Road

Network Rail are carrying out Works for Rail Purposes on Ferry Hinksey Road, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Sep 2024 at 11:40.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Botley Road

Network Rail are carrying out Works for Rail Purposes on Botley Road, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Sep 2024 at 11:39.

Oxfordshire County Council logo
LONG TERM
Between
3 Sep 2023 and 30 Mar 2027
Details
View Map
Share
Follow
Kennington Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Kennington Roundabout, Oxford.

These works are categorised as Major.

The works will start on or after 3 September 2023 and could run through until 30 March 2027. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 25 Oct 2022 at 09:34.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Grenoble Road

Thames Water are carrying out Utility asset works on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:17 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.

Thames Water logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Botley Road

Thames Water are carrying out Utility asset works on Botley Road, Oxford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 10:50 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 10:57.

Oxfordshire County Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Kings Head Lane

Oxfordshire County Council are carrying out Remedial works on Kings Head Lane, Islip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 19:44 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Dec 2024 at 14:33.

Southern Gas Networks logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
Five Mile Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Five Mile Drive, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 12:40 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 10:38.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Little Clarendon Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Little Clarendon Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 09:57.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Little Clarendon Street

Oxfordshire County Council are carrying out Highway improvement works on Little Clarendon Street, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:37.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Observatory Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Observatory Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:13.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Observatory Street

Oxfordshire County Council are carrying out Highway improvement works on Observatory Street, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:37.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
St Bernard's Road

Oxfordshire County Council are proposing to carry out Highway improvement works on St Bernard's Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:13.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
St Bernard's Road

Oxfordshire County Council are carrying out Highway improvement works on St Bernard's Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:36.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Bevington Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Bevington Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:14.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Bevington Road

Oxfordshire County Council are carrying out Highway improvement works on Bevington Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:36.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Plantation Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Plantation Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:14.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Plantation Road

Oxfordshire County Council are carrying out Highway improvement works on Plantation Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:35.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Leckford Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Leckford Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 09:30.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Leckford Road

Oxfordshire County Council are carrying out Highway improvement works on Leckford Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:33.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Canterbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Canterbury Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 09:30.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Canterbury Road

Oxfordshire County Council are carrying out Highway improvement works on Canterbury Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:33.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Farndon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Farndon Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:56.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Farndon Road

Oxfordshire County Council are carrying out Highway improvement works on Farndon Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:31.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
St Margaret's Road

Oxfordshire County Council are proposing to carry out Highway improvement works on St Margaret's Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:41.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
St Margaret's Road

Oxfordshire County Council are carrying out Highway improvement works on St Margaret's Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:28.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
South Parade

Oxfordshire County Council are proposing to carry out Highway improvement works on South Parade, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:32.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
South Parade

Oxfordshire County Council are carrying out Highway improvement works on South Parade, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:26.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Field House Drive

Oxfordshire County Council are proposing to carry out Highway improvement works on Field House Drive, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:31.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Field House Drive

Oxfordshire County Council are carrying out Highway improvement works on Field House Drive, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:25.

Oxfordshire County Council logo
LONG TERM
Between
9 Sep 2024 and 30 May 2029
Details
View Map
Share
Follow
Section Of Southern Bypass Between Hinksey Hill Roundabout And Kennington Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of Southern Bypass Between Hinksey Hill Roundabout And Kennington Roundabout, South Hinksey, Oxford.

These works are categorised as Major.

The works will start on or after 9 September 2024 and could run through until 30 May 2029. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 6 Mar 2024 at 09:44.

Oxfordshire County Council logo
LONG TERM
Until
28 Jan 2025
Details
View Map
Share
Follow
The Towing Path

Oxfordshire County Council are carrying out Highway repair and maintenance works on The Towing Path, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:30 and could run through until 28 January 2025. The works will impact the footway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Sep 2024 at 09:25.

Oxfordshire County Council logo
LONG TERM
Until
28 Jan 2025
Details
View Map
Share
Follow
The Towing Path

Oxfordshire County Council are carrying out Highway repair and maintenance works on The Towing Path, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:30 and could run through until 28 January 2025. The works will impact the footway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Sep 2024 at 09:25.

Oxfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Phipps Road

Oxfordshire County Council are carrying out Highway improvement works on Phipps Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 12:45 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Dec 2024 at 11:41.

Oxfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Napier Road

Oxfordshire County Council are carrying out Highway improvement works on Napier Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 12:45 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Dec 2024 at 11:41.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Watlington Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Watlington Road, Garsington, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 14:09.

Oxfordshire County Council logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Blackbird Leys Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Blackbird Leys Road, Oxford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:30 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 14:29.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Botley Road

Thames Water are proposing to carry out Section 58 on Botley Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:08.

Thames Water logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Botley Road

Thames Water are carrying out Section 58 on Botley Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:00 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:15.

Network Rail logo
LONG TERM
Between
2 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Botley Road

Network Rail are proposing to carry out Works for Rail Purposes on Botley Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Nov 2024 at 10:09.

Network Rail logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Botley Road

Network Rail are carrying out Works for Rail Purposes on Botley Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 01:00 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 2 Dec 2024 at 09:04.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 9 Mar 2025
Details
View Map
Share
Follow
Wheatley Road

Thames Water are proposing to carry out Utility asset works on Wheatley Road, Islip.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 13:42.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 9 Mar 2025
Details
View Map
Share
Follow
Wheatley Road

Thames Water are proposing to carry out Utility asset works on Wheatley Road, Islip.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 12:58.

Thames Water logo
LONG TERM
Until
9 Mar 2025
Details
View Map
Share
Follow
Wheatley Road

Thames Water are carrying out Utility asset works on Wheatley Road, Islip.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 13:30 and could run through until 9 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 13:50.

Southern Gas Networks logo
LONG TERM
Between
13 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Eynsham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Eynsham Road, Farmoor, Oxford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:29.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Warneford Road

Thames Water are carrying out Utility repair and maintenance works on Warneford Road, Oxford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 December 2024 at 08:42 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:23.

Thames Water logo
Finishing
Today
Details
View Map
Share
Merton Street

Thames Water were proposing to carry out Utility repair and maintenance works on Merton Street, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:35.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 16 May 2025
Details
View Map
Share
Follow
Lower Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lower Road, Garsington, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 14:15.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Ock Street

Thames Water were proposing to carry out Utility repair and maintenance works on Ock Street, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:28.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Hurst Rise Road

Thames Water are proposing to carry out Utility asset works on Hurst Rise Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:11.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Hurst Rise Road

Thames Water are proposing to carry out Utility asset works on Hurst Rise Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:40.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Cowley Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Cowley Road, Oxford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 3 Dec 2024 at 11:34.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Cowley Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Cowley Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 4 Dec 2024 at 07:49.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Cowley Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Cowley Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 4 Dec 2024 at 10:37.

Scottish Hydro Electric Power Dis logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
St Thomas Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on St Thomas Street, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 11:30.

Scottish Hydro Electric Power Dis logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Hollybush Row

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Hollybush Row, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Dec 2024 at 11:55.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 6 Dec 2025
Details
View Map
Share
Follow
North Street

Oxfordshire County Council are proposing to carry out Utility asset works on North Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Dec 2024 at 13:59.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 6 Dec 2025
Details
View Map
Share
Follow
North Street

Oxfordshire County Council are proposing to carry out Utility asset works on North Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 16 Dec 2024 at 15:11.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
St Michael's Street

Oxfordshire County Council are proposing to carry out Highway improvement works on St Michael's Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 19 Jun 2024 at 08:56.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
St Michael's Street

Oxfordshire County Council are proposing to carry out Highway improvement works on St Michael's Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 20 Aug 2024 at 08:17.

Thames Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Pusey Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Pusey Lane, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 08:18.

Thames Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Pusey Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Pusey Lane, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:13.

Thames Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Stowford Road

Thames Water are proposing to carry out Utility asset works on Stowford Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 08:26.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Old Boars Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Old Boars Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 15:49.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Old Boars Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Old Boars Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 13:53.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Merton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Merton Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 10:00.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Merton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Merton Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 13:59.

Thames Water logo
Between
8 and 13 Jan 2025
Details
View Map
Share
Woodstock Road

Thames Water were proposing to carry out Utility repair and maintenance works on Woodstock Road, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 13 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:44.

Thames Water logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Green Road

Thames Water are proposing to carry out Utility repair and maintenance works on Green Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:26.

Thames Water logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Green Road

Thames Water are proposing to carry out Utility repair and maintenance works on Green Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 10:35.

Oxfordshire County Council logo
LONG TERM
Between
13 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Grenoble Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 13:55.

Oxfordshire County Council logo
LONG TERM
Between
13 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Grenoble Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 13:58.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
York Road

Thames Water are proposing to carry out Utility repair and maintenance works on York Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:53.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
York Road

Thames Water are proposing to carry out Utility repair and maintenance works on York Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:30.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Gardiner Street

Thames Water are proposing to carry out New service connection on Gardiner Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 11:24.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Gardiner Street

Thames Water are proposing to carry out New service connection on Gardiner Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 08:09.

Thames Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Church Way

Thames Water are proposing to carry out Utility repair and maintenance works on Church Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:51.

Thames Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Sawpit Road

Thames Water are proposing to carry out New service connection on Sawpit Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:05.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Charles Street

Thames Water are proposing to carry out Utility repair and maintenance works on Charles Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 11:42.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Saxon Way

Thames Water are proposing to carry out Utility repair and maintenance works on Saxon Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 16:22.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Saxon Way

Thames Water are proposing to carry out Utility repair and maintenance works on Saxon Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 11:18.

Oxfordshire County Council logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Broadfields

Oxfordshire County Council are proposing to carry out Highway improvement works on Broadfields, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 12 Dec 2024 at 15:05.

Oxfordshire County Council logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Sandy Lane West

Oxfordshire County Council are proposing to carry out Highway improvement works on Sandy Lane West, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 12 Dec 2024 at 15:06.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
St Thomas Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on St Thomas Street, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jul 2024 at 10:00.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hollybush Row

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Hollybush Row, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jul 2024 at 10:00.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Old Road

Thames Water are proposing to carry out New service connection on Old Road, Shotover Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:29.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Old Road

Thames Water are proposing to carry out New service connection on Old Road, Shotover Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:35.

Thames Water logo
Between
30 Jan and 2 Feb 2025
Details
View Map
Share
Hollow Way

Thames Water were proposing to carry out New service connection on Hollow Way, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:25.

Oxfordshire County Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Blackbird Leys Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Blackbird Leys Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 13:35.

Oxfordshire County Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Blackbird Leys Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Blackbird Leys Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 13:37.

Oxfordshire County Council logo
LONG TERM
Between
3 Feb and 31 Jul 2025
Details
View Map
Share
Follow
Pusey Street

Oxfordshire County Council are proposing to carry out Works for road purposes on Pusey Street, Oxford.

These works are categorised as Major.

The works will start on or after 3 February 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:54.

Oxfordshire County Council logo
LONG TERM
Between
3 Feb and 31 Jul 2025
Details
View Map
Share
Follow
Pusey Street

Oxfordshire County Council are proposing to carry out Works for road purposes on Pusey Street, Oxford.

These works are categorised as Major.

The works will start on or after 3 February 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:56.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Eynsham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eynsham Road, Farmoor, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:33.

Thames Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
North Hinksey Lane

Thames Water are proposing to carry out Utility repair and maintenance works on North Hinksey Lane, North Hinksey, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 14:07.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 12:56.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 12:57.

Oxfordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Sandy Lane West

Oxfordshire County Council were proposing to carry out Highway improvement works on Sandy Lane West, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 13 Dec 2024 at 10:18.

Oxfordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Sandy Lane West

Oxfordshire County Council are proposing to carry out Highway improvement works on Sandy Lane West, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 13 Dec 2024 at 10:20.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Catherine Street

Thames Water are proposing to carry out New service connection on Catherine Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 13:22.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Catherine Street

Thames Water are proposing to carry out New service connection on Catherine Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:48.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Sunderland Avenue

BT are proposing to carry out Utility asset works on Sunderland Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 09:01.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Sunderland Avenue

BT are proposing to carry out Utility asset works on Sunderland Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 21 Nov 2024 at 11:06.

Scottish Hydro Electric Power Dis logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
West Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on West Way, Oxford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 15:13.

Scottish Hydro Electric Power Dis logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Aristotle Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Aristotle Lane, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Dec 2024 at 15:49.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Ock Street

Thames Water were proposing to carry out Utility repair and maintenance works on Ock Street, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 15:10.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Ock Street

Thames Water were proposing to carry out Utility repair and maintenance works on Ock Street, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 15:21.

Oxfordshire County Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Wheatley Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Wheatley Road, Garsington, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 12:30.

Thames Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Annesley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Annesley Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 15:26.

Oxfordshire County Council logo
LONG TERM
Between
3 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Blue Boar Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Blue Boar Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2024 at 13:44.

Oxfordshire County Council logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
St Aldate's

Oxfordshire County Council are proposing to carry out roadworks on St Aldate's, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2024 at 15:24.

Oxfordshire County Council logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
High Street

Oxfordshire County Council are proposing to carry out roadworks on High Street, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2024 at 15:23.

National Grid Electricity Transmission logo
Between
8 and 10 Mar 2025
Details
View Map
Share
Follow
Unnamed-a40-dual Carriageway (36209273)

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Unnamed-a40-dual Carriageway (36209273), Wheatley, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 10 Dec 2024 at 15:45.

National Grid Electricity Transmission logo
Between
8 and 10 Mar 2025
Details
View Map
Share
Follow
Unnamed-a40-dual Carriageway (36209272)

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Unnamed-a40-dual Carriageway (36209272), Wheatley, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 10 Dec 2024 at 15:55.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Eynsham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Eynsham Road, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:40.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
The Green

Oxfordshire County Council are proposing to carry out Highway improvement works on The Green, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:39.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Yarnton Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Yarnton Road, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:38.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Cassington Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Cassington Road, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 09:39.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Cassington Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Cassington Road, Yarnton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 2 Dec 2024 at 14:28.

Thames Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Finmore Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finmore Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:42.


Roadworks Map near to South Parks Road, OXFORD, OX1 3RB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 04:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to South Parks Road, OXFORD, OX1 3RB (43 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Oxfordshire County Council logo
ST GILES' 
(0.4 miles)
Oxfordshire County Council
Utility asset works - Carriageway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024
0.4
Details
Share
Follow
2
Oxfordshire County Council logo
MAJOR
  
ST GILES' 
(0.4 miles)
Oxfordshire County Council
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 12 Aug 2024 08:00
(Scheduled: 12 Aug 2024 - 28 Feb 2025)
0.4
Details
Share
Follow
3
Oxfordshire County Council logo
MAJOR
  
ST GILES' 
(0.4 miles)
Oxfordshire County Council
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 12 Aug 2024 - 28 Feb 2025
0.4
Details
Share
Follow
4
Oxfordshire County Council logo
MAJOR
  
LITTLE CLARENDON STREET 
(0.4 miles)
Oxfordshire County Council
Highway improvement works - Footway, Carriageway - Road closure
In Progress
Since: 12 Aug 2024 08:00
(Scheduled: 12 Aug 2024 - 28 Feb 2025)
0.4
Details
Share
Follow
5
Oxfordshire County Council logo
MAJOR
  
LITTLE CLARENDON STREET 
(0.4 miles)
Oxfordshire County Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 12 Aug 2024 - 28 Feb 2025
0.4
Details
Share
Follow
6
Oxfordshire County Council logo
URGENT
  
MERTON STREET 
(0.5 miles)
Oxfordshire County Council
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 3 Dec 2024 12:00
(Scheduled: 3 Dec 2024 - 20 Dec 2024)
0.5
Details
Share
Follow
7
Thames Water logo
MAJOR
  
MERTON STREET 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
0.5
Details
Share
8
Virgin Media logo
GEORGE STREET 
(0.5 miles)
Virgin Media
Permanent reinstatement - Carriageway - Give and take
Cancelled
(Scheduled: 17 Dec 2024 - 18 Dec 2024)
0.5
Details
Share
9
Oxfordshire County Council logo
MAJOR
  
OBSERVATORY STREET 
(0.6 miles)
Oxfordshire County Council
Highway improvement works - Footway, Carriageway - Road closure
In Progress
Since: 12 Aug 2024 08:00
(Scheduled: 12 Aug 2024 - 28 Feb 2025)
0.6
Details
Share
Follow
10
Oxfordshire County Council logo
MAJOR
  
OBSERVATORY STREET 
(0.6 miles)
Oxfordshire County Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 12 Aug 2024 - 28 Feb 2025
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.