ROADWORKS SUMMARY
St. Marys Road, WANTAGE, OX12 8LF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. Marys Road, OX12 8LF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. Marys Road, WANTAGE, OX12 8LF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Marys Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Unnamed--single Carriageway (41608977)

Oxfordshire County Council are carrying out Highway improvement works on Unnamed--single Carriageway (41608977), Wantage.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:20 and could run through until 25 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 25 Oct 2024 at 13:44.

Oxfordshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wantage Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Wantage Road, Frilford, Abingdon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 20:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 24 Oct 2024 at 13:56.

Oxfordshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Oxford Road, East Hanney, Wantage.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 20:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 24 Oct 2024 at 13:56.

Oxfordshire County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are carrying out Highway improvement works on Oxford Road, East Hanney, Wantage.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 5 Nov 2024 at 16:06.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 29 Nov 2024
Details
View Map
Share
Blewbury Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Blewbury Road, East Hagbourne, Didcot.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 15:11.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Blewbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blewbury Road, East Hagbourne, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 15:00.

Southern Gas Networks logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 11:39.

Southern Gas Networks logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are carrying out roadworks on Main Road, East Hagbourne, Didcot.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 11:40.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ickleton Road

BT are carrying out Utility asset works on Ickleton Road, Wantage.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Nov 2024 at 15:51.

Oxfordshire County Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Abingdon Road

Oxfordshire County Council are carrying out Section 50 on Abingdon Road, Didcot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 14:43.

Oxfordshire County Council logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Abingdon Road

Oxfordshire County Council are proposing to carry out Section 50 on Abingdon Road, Didcot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 22 Oct 2024 at 09:50.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Portway

BT are carrying out Utility asset works on Portway, Wantage.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Nov 2024 at 15:51.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ickleton Road

BT are carrying out Utility asset works on Ickleton Road, East Challow, Wantage.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:50 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Nov 2024 at 15:52.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Abingdon Road

Oxfordshire County Council are carrying out Section 50 on Abingdon Road, Didcot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 09:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 6 Nov 2024 at 16:03.

Oxfordshire County Council logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Harwell Link Road

Oxfordshire County Council are carrying out roadworks on Harwell Link Road, Harwell.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 November 2024 at 07:00 and could run through until 30 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 08:41.

Oxfordshire County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Newbury Road

Oxfordshire County Council are carrying out Highway improvement works on Newbury Road, Rowstock.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 19 Nov 2024 at 05:05.

Oxfordshire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Unnamed-a4130-single Carriageway (41610237)

Oxfordshire County Council are carrying out roadworks on Unnamed-a4130-single Carriageway (41610237), Milton, Abingdon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 07:30 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 09:23.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Main Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 10 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:47.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 16:08.

Oxfordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Newbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Newbury Road, Rowstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 30 Sep 2024 at 14:35.

Oxfordshire County Council logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Milton Interchange Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Interchange Roundabout, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 7 Oct 2024 at 13:50.

Oxfordshire County Council logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Milton Interchange Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Interchange Roundabout, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Sep 2024 at 12:59.

Oxfordshire County Council logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Reading Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Reading Road, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Sep 2024 at 15:02.

Thames Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Main Road

Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 10:29.

Oxfordshire County Council logo
LONG TERM
Between
5 Jan and 1 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 10 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Section 58 on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Thames Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Main Road

Thames Water are proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 10:40.

Thames Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Main Road

Thames Water are proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 15:32.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Steventon Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Trenchard Avenue

Oxfordshire County Council are proposing to carry out Highway improvement works on Trenchard Avenue, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 11:21.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
Between
2 and 28 Feb 2025
Details
View Map
Share
Follow
Didcot A4130 Perimeter Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot A4130 Perimeter Road, Didcot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 15:58.

Thames Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grove Road, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:54.

Thames Water logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Church Street

Thames Water are proposing to carry out New service connection on Church Street, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 10:33.


Roadworks Map near to St. Marys Road, WANTAGE, OX12 8LF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. Marys Road, WANTAGE, OX12 8LF (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Airband Community Internet logo
NEWBURY ROAD, EAST HENDRED 
(0.1 miles)
Airband Community Internet
Utility asset works - Carriageway, Verge -
Complete
20 Nov 2024 09:30 - 14:30
0.1
Details
Share
2
Scottish Hydro Electric Power Dis logo
WHITE ROAD, EAST HENDRED 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 19 Nov 2024 - 26 Nov 2024
0.4
Details
Share
Follow
3
Virgin Media logo
UNNAMED--SINGLE CARRIAGEWAY (41609519) 
(1.0 miles)
Virgin Media
Permanent reinstatement - Carriageway, Verge - Give and take
Planned
Scheduled: 20 Nov 2024 - 21 Nov 2024
1.0
Details
Share
Follow