ROADWORKS SUMMARY
The Green, WANTAGE, OX12 0AW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Green, OX12 0AW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Green, WANTAGE, OX12 0AW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Green are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Between
5 Jan and 1 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 10 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Section 58 on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Trenchard Avenue

Oxfordshire County Council are proposing to carry out Highway improvement works on Trenchard Avenue, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 11:21.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Steventon Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
LONG TERM
Between
10 Feb and 17 Oct 2025
Details
View Map
Share
Follow
Faringdon Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Faringdon Road, Stanford In The Vale, Faringdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 7 Feb 2025 at 10:51.

Oxfordshire County Council logo
LONG TERM
Between
3 Mar and 17 Oct 2025
Details
View Map
Share
Follow
Faringdon Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Faringdon Road, Stanford In The Vale, Faringdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 12 Feb 2025 at 13:52.

Oxfordshire County Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
The Causeway

Oxfordshire County Council are carrying out Diversionary works on The Causeway, Steventon, Abingdon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 09:00 and could run through until 15 August 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Oxfordshire County Council on 20 May 2025 at 15:30.

Oxfordshire County Council logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Faringdon Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Faringdon Road, Stanford In The Vale, Faringdon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Mar 2025 at 10:08.

Southern Gas Networks logo
LONG TERM
Between
5 May and 4 Jul 2025
Details
View Map
Share
Follow
Challow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Challow Road, Wantage.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jan 2025 at 15:22.

Southern Gas Networks logo
LONG TERM
Between
5 May and 4 Jul 2025
Details
View Map
Share
Challow Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Challow Road, Wantage.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 14:04.

Thames Water logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Steventon Road

Thames Water were proposing to carry out New service connection on Steventon Road, East Hanney, Wantage.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 08:45.

Southern Gas Networks logo
LONG TERM
Between
19 May and 18 Jul 2025
Details
View Map
Share
Challow Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Challow Road, Wantage.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 08:43.

Southern Gas Networks logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Challow Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Challow Road, Wantage.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:10 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 10:25.

BT logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Main Street

BT were proposing to carry out Utility asset works on Main Street, East Hanney, Wantage.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 19 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 7 May 2025 at 09:33.

BT logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Main Street

BT are proposing to carry out Utility asset works on Main Street, East Hanney, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Apr 2025 at 10:15.

BT logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Main Street

BT are proposing to carry out Utility asset works on Main Street, East Hanney, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Mar 2025 at 16:23.

Oxfordshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Faringdon Road

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Faringdon Road, East Challow, Wantage.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 7 May 2025 at 11:17.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Ashfields Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Ashfields Lane, East Hanney, Wantage.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 21 May 2025 at 08:41.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Ashfields Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Ashfields Lane, East Hanney, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 21 May 2025 at 08:48.

Oxfordshire County Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Digging Lane

Oxfordshire County Council are proposing to carry out Highway improvement works on Digging Lane, Fyfield, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 2 Apr 2025 at 10:16.

Oxfordshire County Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Digging Lane

Oxfordshire County Council are proposing to carry out Highway improvement works on Digging Lane, Fyfield, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2025 at 15:33.

Gigaclear logo
Between
4 and 12 Aug 2025
Details
View Map
Share
Follow
Mill Lane

Gigaclear are proposing to carry out Utility asset works on Mill Lane, West Hendred, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 7 May 2025 at 15:21.

BT logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Main Street

BT are proposing to carry out Utility asset works on Main Street, East Hanney, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 12:14.

BT logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Main Street

BT are proposing to carry out Utility asset works on Main Street, East Hanney, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 May 2025 at 12:19.

Gigaclear logo
Between
11 and 22 Aug 2025
Details
View Map
Share
Follow
Ginge Road

Gigaclear are proposing to carry out Utility asset works on Ginge Road, West Hendred, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 7 May 2025 at 15:22.

Oxfordshire County Council logo
Between
20 and 28 Aug 2025
Details
View Map
Share
Follow
Pinewoods Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Pinewoods Road, Longworth, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 22 May 2025 at 11:09.

Thames Water logo
Between
28 and 31 Aug 2025
Details
View Map
Share
Follow
Letcombe Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Letcombe Hill, East Challow, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 12:28.

Thames Water logo
Between
28 and 31 Aug 2025
Details
View Map
Share
Follow
Letcombe Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Letcombe Hill, East Challow, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 11:47.


Roadworks Map near to The Green, WANTAGE, OX12 0AW (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 08:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Green, WANTAGE, OX12 0AW (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
SYCAMORE WALK, GROVE 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 6 May 2025 - 13 Jun 2025
0.2
Details
Share
Follow
2
Southern Gas Networks logo
MAJOR
  
SYCAMORE WALK, GROVE 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 6 May 2025 - 13 Jun 2025
0.2
Details
Share
Follow
3
Southern Gas Networks logo
MAJOR
  
BRERETON DRIVE, GROVE 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 27 May 2025 13:07
(Scheduled: 26 May 2025 - 25 Jul 2025)
0.3
Details
Share
Follow
4
Southern Gas Networks logo
MAJOR
  
HARDWELL CLOSE, GROVE 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 6 May 2025 - 13 Jun 2025
0.3
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
HARDWELL CLOSE, GROVE 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 6 May 2025 08:30
(Scheduled: 6 May 2025 - 13 Jun 2025)
0.3
Details
Share
Follow
6
Southern Gas Networks logo
LIME TREE CLOSE, GROVE 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 2 Jun 2025 - 13 Jun 2025
0.3
Details
Share
Follow
7
Scottish Hydro Electric Power Dis logo
URGENT
  
WINDRUSH CLOSE, GROVE 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 28 May 2025 10:44
(Scheduled: 28 May 2025 - 3 Jun 2025)
0.4
Details
Share
Follow
8
Fibre & Wireless Networks logo
MAYFIELD AVENUE, GROVE 
(0.4 miles)
Fibre & Wireless Networks
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.4
Details
Share
Follow
9
Scottish Hydro Electric Power Dis logo
URGENT
  
GROVE BRIDGE, GROVE 
(0.7 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 15:23
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.