ROADWORKS SUMMARY
Blenheim Close, DIDCOT, OX11 7JL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Blenheim Close, OX11 7JL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Blenheim Close, DIDCOT, OX11 7JL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Blenheim Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Harwell Link Road

Oxfordshire County Council are carrying out roadworks on Harwell Link Road, Harwell.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 November 2024 at 07:00 and could run through until 23 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 20 Dec 2024 at 09:00.

Oxfordshire County Council logo
LONG TERM
Between
5 Jan and 1 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 10 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Section 58 on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Steventon Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 11:21.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Trenchard Avenue

Oxfordshire County Council are proposing to carry out Highway improvement works on Trenchard Avenue, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 2 Oct 2025
Details
View Map
Share
Landseer Walk

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Landseer Walk, Abingdon.

These works were categorised as Major.

There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 2 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Mar 2025 at 09:31.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 2 Oct 2025
Details
View Map
Share
Follow
Landseer Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Landseer Walk, Abingdon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 3 March 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 11:14.

Oxfordshire County Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
The Causeway

Oxfordshire County Council are carrying out Diversionary works on The Causeway, Steventon, Abingdon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 09:00 and could run through until 15 August 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Oxfordshire County Council on 20 May 2025 at 15:30.

Thames Water logo
LONG TERM
Between
17 Apr and 29 Jun 2025
Details
View Map
Share
Hithercroft Road

Thames Water were proposing to carry out New service connection on Hithercroft Road, Wallingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 29 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 09:15.

Thames Water logo
LONG TERM
Between
17 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Hithercroft Road

Thames Water are proposing to carry out New service connection on Hithercroft Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 09:44.

Thames Water logo
LONG TERM
Between
17 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Hithercroft Road

Thames Water are proposing to carry out New service connection on Hithercroft Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 15:45.

Thames Water logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Hithercroft Road

Thames Water are carrying out New service connection on Hithercroft Road, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:30 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 11:23.

Thames Water logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are carrying out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:30 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 11:24.

Thames Water logo
LONG TERM
Between
17 Apr and 23 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 09:42.

Thames Water logo
LONG TERM
Between
17 Apr and 23 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
21 Apr and 7 Jul 2025
Details
View Map
Share
Follow
Footpath Front Of 45-59 Gainsborough Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Front Of 45-59 Gainsborough Green, Abingdon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 21 April 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 11:36.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 20 Jun 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Jan 2025 at 15:14.

Southern Gas Networks logo
LONG TERM
Between
5 May and 25 Jul 2025
Details
View Map
Share
Follow
Footpath Between Preston Road And Gainsborough Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Between Preston Road And Gainsborough Green, Abingdon.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 5 May 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 11:39.

Southern Gas Networks logo
LONG TERM
Between
19 May and 25 Jul 2025
Details
View Map
Share
Follow
Footpath Between Preston Road And Hogarth Place

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Between Preston Road And Hogarth Place, Abingdon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 19 May 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 08:55.

Southern Gas Networks logo
LONG TERM
Between
19 May and 25 Jul 2025
Details
View Map
Share
Footpath Between Preston Road And Hogarth Place

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Footpath Between Preston Road And Hogarth Place, Abingdon.

These works were categorised as Major.

There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 25 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 14:14.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
24 Jun 2025
Details
View Map
Share
Follow
Burcot Lane

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Burcot Lane, Berinsfield, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 May 2025 at 08:12.

Southern Gas Networks logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Lely Court

Southern Gas Networks are carrying out Utility repair and maintenance works on Lely Court, Abingdon.

These works are categorised as Major.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 23 May 2025 at 16:20 and could run through until 31 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 08:06.

Southern Gas Networks logo
LONG TERM
Between
19 May and 25 Jul 2025
Details
View Map
Share
Lely Court

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lely Court, Abingdon.

These works were categorised as Major.

There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 25 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 14:18.

Southern Gas Networks logo
LONG TERM
Between
19 May and 25 Jul 2025
Details
View Map
Share
Follow
Lely Court

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lely Court, Abingdon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 19 May 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 11:41.

Southern Gas Networks logo
LONG TERM
Until
29 Jul 2025
Details
View Map
Share
Follow
Footpath Between Preston Road And Hogarth Place

Southern Gas Networks are carrying out Utility repair and maintenance works on Footpath Between Preston Road And Hogarth Place, Abingdon.

These works are categorised as Major.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 23 May 2025 at 16:20 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 08:09.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
All Saints Lane

Thames Water are carrying out Utility repair and maintenance works on All Saints Lane, Sutton Courtenay, Abingdon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 05:05 and could run through until 4 June 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:59.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 14:22.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
St Johns Road

Thames Water were proposing to carry out New service connection on St Johns Road, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 10:14.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 11:09.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
St Johns Road

Thames Water were proposing to carry out New service connection on St Johns Road, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 08:20.

Gigaclear logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Reading Road

Gigaclear are proposing to carry out Utility asset works on Reading Road, Harwell, Didcot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 29 May 2025 at 14:34.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 12 Dec 2025
Details
View Map
Share
Follow
Landseer Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Landseer Walk, Abingdon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 16 June 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 08:47.

Gigaclear logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Reading Road

Gigaclear are proposing to carry out Utility asset works on Reading Road, Harwell, Didcot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 12 May 2025 at 16:30.

Thames Water logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Bath Street

Thames Water were proposing to carry out Utility repair and maintenance works on Bath Street, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 10 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 15:30.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Drayton Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Drayton Road, Abingdon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 22 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 15:21.

Southern Gas Networks logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Drayton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Drayton Road, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 15:23.

Gigaclear logo
Between
4 and 12 Aug 2025
Details
View Map
Share
Follow
Mill Lane

Gigaclear are proposing to carry out Utility asset works on Mill Lane, West Hendred, Wantage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 7 May 2025 at 15:21.

Southern Gas Networks logo
Between
18 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Wimblestraw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wimblestraw Road, Berinsfield, Wallingford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 08:40.

Oxfordshire County Council logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Station Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Jun 2025 at 10:57.

Oxfordshire County Council logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Wantage Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Wantage Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Jun 2025 at 10:01.


Roadworks Map near to Blenheim Close, DIDCOT, OX11 7JL (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 08:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Blenheim Close, DIDCOT, OX11 7JL (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
MERELAND ROAD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 27 May 2025 - 20 Jun 2025
0.4
Details
Share
Follow
2
Thames Water logo
GLEBE ROAD 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 30 May 2025 - 3 Jun 2025
0.5
Details
Share
Follow
3
BT logo
QUEENSWAY 
(0.6 miles)
BT
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 30 May 2025 11:30
(Scheduled: 30 May 2025 - 3 Jun 2025)
0.6
Details
Share
Follow
4
BT logo
PARK ROAD 
(0.6 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
In Progress
Since: 30 May 2025 11:30
(Scheduled: 30 May 2025 - 3 Jun 2025)
0.6
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
NEWLANDS AVENUE 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Multi-way signals
In Progress
Since: 19 Feb 2025 10:23
(Scheduled: 17 Feb 2025 - 4 Jun 2025)
0.6
Details
Share
Follow
6
Southern Gas Networks logo
MAJOR
  
QUEENSWAY 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 2 Jun 2025 10:39
(Scheduled: 2 Jun 2025 - 17 Jun 2025)
0.6
Details
Share
Follow
7
Oxfordshire County Council logo
RIDGEWAY ROAD 
(0.6 miles)
Oxfordshire County Council
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 4 Jun 2025
0.6
Details
Share
Follow
8
BT logo
ICKNIELD CLOSE 
(0.7 miles)
BT
Utility asset works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.7
Details
Share
Follow
9
Thames Water logo
HAMBLE ROAD 
(0.7 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 10:51
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.7
Details
Share
Follow
10
BT logo
SOUTH PARK AVENUE 
(0.7 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
In Progress
Since: 2 Jun 2025 08:00
(Scheduled: 30 May 2025 - 4 Jun 2025)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.