ROADWORKS SUMMARY
Calamint Court, DIDCOT, OX11 6GZ
Introduction
View current and future planned roadworks and road closures for Calamint Court, OX11 6GZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Calamint Court, DIDCOT, OX11 6GZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Calamint Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
28 Feb 2025
Oxfordshire County Council are carrying out Section 50 on Abingdon Road, Didcot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 09:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 6 Nov 2024 at 16:03.
30 Jun 2025
Oxfordshire County Council are carrying out roadworks on Harwell Link Road, Harwell.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 November 2024 at 07:00 and could run through until 30 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 08:41.
18 Nov 2024 and 10 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 09:23.
18 Nov 2024 and 10 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 10 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 13:47.
18 Nov 2024 and 10 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 16:08.
28 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Main Street, West Hagbourne, Didcot.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 14:00 and could run through until 28 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 15:32.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Penlon Place, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 13:51.
5 Jan and 1 Nov 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.
6 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sint Niklaas Close, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 14:51.
6 Jan and 10 Nov 2025
Oxfordshire County Council are proposing to carry out Section 58 on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.
6 and 10 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on West End, Brightwell-cum-sotwell, Wallingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 15:42.
8 and 10 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:49.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bath Street, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:12.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 10:40.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bath Street, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:42.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Trenchard Avenue, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 11:21.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Steventon, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.
2 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot A4130 Perimeter Road, Didcot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 15:58.
5 and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Grove Road, Harwell, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:37.
12 and 15 Feb 2025
Thames Water are proposing to carry out New service connection on Church Street, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:52.
12 and 15 Feb 2025
Thames Water are proposing to carry out New service connection on Church Street, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 15:25.
2 and 28 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot A4130 Perimeter Road, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 14:32.
10 and 12 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Reading Road, Harwell, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 16:18.
11 and 13 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Penlon Place, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:18.
11 and 13 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Main Street, Chilton, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 14:27.
12 and 14 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Baker Street, Aston Tirrold, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 08:42.
Roadworks Map near to Calamint Court, DIDCOT, OX11 6GZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Calamint Court, DIDCOT, OX11 6GZ (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
(Scheduled: 17 Nov 2024 - 30 Jun 2025)
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
(Scheduled: 16 Nov 2023 - 15 May 2025)
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
(Scheduled: 16 Oct 2024 - 16 Jan 2025)
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.