ROADWORKS SUMMARY
Harwell Oxford, DIDCOT, OX11 0FA
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for OX11 0FA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Harwell Oxford, DIDCOT, OX11 0FA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
28 Feb 2025
Oxfordshire County Council are carrying out Section 50 on Abingdon Road, Didcot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 09:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 6 Nov 2024 at 16:03.
23 Nov 2025
Oxfordshire County Council are carrying out roadworks on Harwell Link Road, Harwell.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 November 2024 at 07:00 and could run through until 23 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 20 Dec 2024 at 09:00.
5 Jan and 1 Nov 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.
6 Jan and 10 Nov 2025
Oxfordshire County Council are proposing to carry out Section 58 on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.
20 Jan and 20 Feb 2025
Oxfordshire County Council are proposing to carry out Section 50 on Grove Road, Wantage.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Oxfordshire County Council on 10 Jan 2025 at 10:13.
27 Mar 2026
Oxfordshire County Council are carrying out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 07:30 and could run through until 27 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 27 Jan 2025 at 09:29.
27 Mar 2026
Oxfordshire County Council are carrying out Highway improvement works on Milton Hill, Abingdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 07:30 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 27 Jan 2025 at 09:30.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 11:21.
27 Mar 2026
Oxfordshire County Council are carrying out Highway improvement works on Milton Hill, Steventon, Abingdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 07:30 and could run through until 27 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 27 Jan 2025 at 09:29.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Steventon, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.
27 Mar 2026
Oxfordshire County Council are carrying out Highway improvement works on Steventon Hill, Steventon, Abingdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 07:30 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 27 Jan 2025 at 09:30.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.
27 Jan 2025 and 27 Mar 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Trenchard Avenue, Milton, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.
27 Mar 2026
Oxfordshire County Council are carrying out Highway improvement works on Trenchard Avenue, Milton, Abingdon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 07:30 and could run through until 27 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 27 Jan 2025 at 09:29.
2 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot A4130 Perimeter Road, Didcot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 15:58.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on Didcot A4130 Perimeter Road, Didcot.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 February 2025 at 20:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 5 Feb 2025 at 09:47.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Steventon Hill, Steventon, Abingdon.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 February 2025 at 10:52 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 6 Feb 2025 at 11:10.
Tomorrow
Oxfordshire County Council are carrying out Highway repair and maintenance works on Hadden Hill, North Moreton, Didcot.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 February 2025 at 13:30 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 7 Feb 2025 at 14:20.
Saturday
Thames Water are proposing to carry out New service connection on Church Street, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 15:25.
Saturday
Thames Water are carrying out New service connection on Church Street, Didcot.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2025 at 10:20 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Feb 2025 at 10:22.
24 and 28 Feb 2025
West Berkshire Council were proposing to carry out Highway improvement works on Copperage Road, Farnborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by West Berkshire Council on 20 Jan 2025 at 09:12.
24 and 28 Feb 2025
West Berkshire Council are proposing to carry out Highway improvement works on Copperage Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Berkshire Council on 8 Jan 2025 at 12:03.
24 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Abingdon Road, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 11:39.
25 and 28 Feb 2025
West Berkshire Council are proposing to carry out Highway improvement works on Copperage Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Berkshire Council on 20 Jan 2025 at 12:40.
2 and 28 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot A4130 Perimeter Road, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 28 Jan 2025 at 09:45.
2 and 28 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot A4130 Perimeter Road, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 14:32.
10 Mar and 10 Apr 2025
Oxfordshire County Council are proposing to carry out Section 50 on Grove Road, Wantage.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 10 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Oxfordshire County Council on 27 Jan 2025 at 10:20.
10 and 12 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Compton Road, East Ilsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 16 Jan 2025 at 14:51.
10 and 12 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Reading Road, Harwell, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:15.
10 and 12 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Reading Road, Harwell, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 16:18.
11 and 13 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Main Street, Chilton, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jan 2025 at 15:20.
11 and 14 Mar 2025
West Berkshire Council are proposing to carry out Highway improvement works on Copperage Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Berkshire Council on 13 Jan 2025 at 15:54.
12 and 14 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Baker Street, Aston Tirrold, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 08:42.
19 and 21 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Thorpe Street, Aston Upthorpe, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Jan 2025 at 13:51.
19 and 21 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 21 March 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:14.
19 and 21 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 21 March 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 08:45.
19 and 21 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 21 March 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:35.
2 and 4 Apr 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Thorpe Street, Aston Upthorpe, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 April 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 10:54.
7 and 9 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Compton Road, East Ilsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 31 Jan 2025 at 16:18.
7 and 9 Apr 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 9 April 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 10 Feb 2025 at 09:18.
7 and 9 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 12 Feb 2025 at 08:57.
7 and 9 Apr 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 9 April 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 09:56.
7 and 9 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Thorpe Street, Aston Upthorpe, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Feb 2025 at 11:59.
7 and 9 Apr 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 9 April 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 6 Feb 2025 at 09:16.
7 and 9 Apr 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Main Road, East Hagbourne, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 9 April 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 11 Feb 2025 at 08:46.
7 and 9 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Thorpe Street, Aston Upthorpe, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Feb 2025 at 09:41.
15 and 17 Apr 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Compton Road, East Ilsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 11:05.
21 Apr and 25 Jul 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Compton Road, East Ilsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 25 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Jan 2025 at 15:31.
21 Apr and 25 Jul 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Compton Road, East Ilsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 25 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 21 Jan 2025 at 10:20.
23 and 25 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Unnamed Road From B4494 To Copperage Road, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 29 Jan 2025 at 09:06.
27 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Road Between Main Street And Reading Road, Upton, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 7 Feb 2025 at 08:51.
27 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Hitchcock Way, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 6 Feb 2025 at 16:43.
27 Apr and 1 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Road Running North East From Manor Court, Chilton, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 11 Feb 2025 at 08:08.
27 Apr and 1 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Chilton Road, West Hagbourne, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 11 Feb 2025 at 08:34.
27 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Main Street, West Hagbourne, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 6 Feb 2025 at 16:39.
27 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Brook Lane, West Hagbourne, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 6 Feb 2025 at 16:39.
27 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Road, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 31 Jan 2025 at 15:37.
28 Apr and 1 May 2025
Oxfordshire County Council were proposing to carry out Highway improvement works on Townsend, Chilton, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 14:52.
28 Apr and 1 May 2025
Oxfordshire County Council were proposing to carry out Highway improvement works on Main Street, Chilton, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 14:53.
28 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Main Street, Chilton, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 14:57.
28 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Lower Road, Chilton, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 14:58.
28 Apr and 1 May 2025
Oxfordshire County Council were proposing to carry out Highway improvement works on Unnamed Road Between Lower Road And A34 Junction, Chilton, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 14:53.
28 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed Road Between Lower Road And A34 Junction, Chilton, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 14:59.
28 Apr and 1 May 2025
Oxfordshire County Council were proposing to carry out Highway improvement works on Church Hill, Chilton, Didcot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 14:52.
28 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Church Hill, Chilton, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 14:56.
28 Apr and 2 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Harwell Link Road, West Hagbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Feb 2025 at 12:23.
28 and 30 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Townsend, Chilton, Didcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 14:55.
28 Apr and 2 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Harwell Link Road, Harwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Feb 2025 at 13:01.
28 Apr and 1 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Featherbed Lane, East Hendred, Wantage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 3 Feb 2025 at 12:22.
29 Apr and 2 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 3 Feb 2025 at 12:45.
29 Apr and 2 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Station Road, Grove, Wantage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 3 Feb 2025 at 13:03.
29 Apr and 2 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on High Street, Steventon, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 3 Feb 2025 at 12:44.
Roadworks Map near to Harwell Oxford, DIDCOT, OX11 0FA (Loading...)
![](https://a.tile.openstreetmap.org/13/4065/2721.png)
![](https://b.tile.openstreetmap.org/13/4066/2721.png)
![](https://c.tile.openstreetmap.org/13/4064/2721.png)
![](https://c.tile.openstreetmap.org/13/4067/2721.png)
![](https://b.tile.openstreetmap.org/13/4063/2721.png)
![](https://a.tile.openstreetmap.org/13/4068/2721.png)
![](marker-shadow.png)
![Marker](marker-icon.png)
![Marker](https://streetguide.co.uk/includes/images/purple-32.png)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Harwell Oxford, DIDCOT, OX11 0FA (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.