ROADWORKS SUMMARY
Amwell Place, WALLINGFORD, OX10 9NZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Amwell Place, OX10 9NZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Amwell Place, WALLINGFORD, OX10 9NZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Amwell Place are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 8 Oct 2025
Details
View Map
Share
St Georges Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St Georges Road, Wallingford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 12:23.

Thames Water logo
LONG TERM
Between
6 Aug and 2 Dec 2025
Details
View Map
Share
Follow
Crown Lane

Thames Water are proposing to carry out Utility asset works on Crown Lane, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Jun 2025 at 10:20.

Gigaclear logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (36211662)

Gigaclear are carrying out Utility asset works on Unnamed--single Carriageway (36211662), South Oxfordshire.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 25 Aug 2025 at 11:15.

Gigaclear logo
LONG TERM
Between
25 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (36211662)

Gigaclear are proposing to carry out Utility asset works on Unnamed--single Carriageway (36211662), South Oxfordshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Jul 2025 at 11:38.

Gigaclear logo
LONG TERM
Between
25 Aug and 24 Oct 2025
Details
View Map
Share
Unnamed--single Carriageway (36211662)

Gigaclear were proposing to carry out Utility asset works on Unnamed--single Carriageway (36211662), South Oxfordshire.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 24 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 28 Jul 2025 at 15:19.

Gigaclear logo
LONG TERM
Between
25 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (36211662)

Gigaclear are proposing to carry out Utility asset works on Unnamed--single Carriageway (36211662), South Oxfordshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 Jun 2025 at 11:46.

Gigaclear logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (36210209)

Gigaclear are carrying out Utility asset works on Unnamed--single Carriageway (36210209), South Oxfordshire.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 25 Aug 2025 at 11:15.

Gigaclear logo
LONG TERM
Between
25 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (36210209)

Gigaclear are proposing to carry out Utility asset works on Unnamed--single Carriageway (36210209), South Oxfordshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Jul 2025 at 11:36.

Gigaclear logo
LONG TERM
Between
25 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (36210209)

Gigaclear are proposing to carry out Utility asset works on Unnamed--single Carriageway (36210209), South Oxfordshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 Jun 2025 at 11:48.

Gigaclear logo
LONG TERM
Between
25 Aug and 24 Oct 2025
Details
View Map
Share
Unnamed--single Carriageway (36210209)

Gigaclear were proposing to carry out Utility asset works on Unnamed--single Carriageway (36210209), South Oxfordshire.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 24 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 28 Jul 2025 at 15:21.

Oxfordshire County Council logo
LONG TERM
Until
15 Oct 2025
Details
View Map
Share
Follow
Station Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Station Road, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 09:07.

Oxfordshire County Council logo
LONG TERM
Until
15 Oct 2025
Details
View Map
Share
Follow
Wantage Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Wantage Road, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 09:07.

Southern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Wallingford Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wallingford Road, Goring, Reading.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 12:05.

Thames Water logo
LONG TERM
Between
2 Sep and 18 Dec 2025
Details
View Map
Share
Follow
Crown Lane

Thames Water are proposing to carry out Utility asset works on Crown Lane, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:26.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 14:26.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 14:11.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Brook Street

Thames Water are proposing to carry out Utility asset works on Brook Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 14:11.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Brook Street

Thames Water are proposing to carry out Utility asset works on Brook Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 14:26.

Oxfordshire County Council logo
Between
15 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Wantage Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Wantage Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 24 Jun 2025 at 13:25.

Oxfordshire County Council logo
Between
15 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Station Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 24 Jun 2025 at 13:28.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Bohams Road

BT are proposing to carry out Utility asset works on Bohams Road, Blewbury, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 29 September 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 30 Jun 2025 at 13:15.

Gigaclear logo
Finishing
Today
Details
View Map
Share
Follow
The Street

Gigaclear are proposing to carry out Utility asset works on The Street, Ipsden, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 6 Jun 2025 at 11:30.

Gigaclear logo
Finishing
Today
Details
View Map
Share
Follow
The Street

Gigaclear are carrying out Utility asset works on The Street, Ipsden, Wallingford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 10:45 and could run through until 23 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 17 Sep 2025 at 12:31.

Oxfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Clapcot Way

Oxfordshire County Council are proposing to carry out Highway improvement works on Clapcot Way, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Sep 2025 at 12:36.

Oxfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Barncroft

Oxfordshire County Council are proposing to carry out Highway improvement works on Barncroft, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Sep 2025 at 12:03.

Oxfordshire County Council logo
Between
22 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Wantage Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Wantage Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 7 Aug 2025 at 11:39.

Oxfordshire County Council logo
Between
22 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Station Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 7 Aug 2025 at 11:25.

Oxfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Norries Drive

Oxfordshire County Council are proposing to carry out Highway improvement works on Norries Drive, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2025 at 11:15.

Oxfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Glyn Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Glyn Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Sep 2025 at 12:38.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Church Lane

Southern Gas Networks are proposing to carry out New service connection on Church Lane, Brightwell-cum-sotwell, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 14:34.

Oxfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Barncroft

Oxfordshire County Council are proposing to carry out Highway improvement works on Barncroft, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Sep 2025 at 14:07.

Oxfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Clapcot Way

Oxfordshire County Council are proposing to carry out Highway improvement works on Clapcot Way, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 15 Sep 2025 at 12:04.

Oxfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Fitzcount Way

Oxfordshire County Council are proposing to carry out Highway improvement works on Fitzcount Way, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Sep 2025 at 12:37.

Oxfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Blackstone Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Blackstone Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Sep 2025 at 11:25.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Church Lane

Southern Gas Networks are carrying out New service connection on Church Lane, Brightwell-cum-sotwell, Wallingford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 10:50 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Sep 2025 at 11:01.

Oxfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
St Peters Road

Oxfordshire County Council are proposing to carry out Highway improvement works on St Peters Road, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Sep 2025 at 12:05.

Gigaclear logo
Finishing
Monday
Details
View Map
Share
Follow
Road Running Through Preston Crowmarsh

Gigaclear are proposing to carry out Utility asset works on Road Running Through Preston Crowmarsh, Preston Crowmarsh, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 28 Aug 2025 at 08:27.

Oxfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
St Andrews Road

Oxfordshire County Council are proposing to carry out Highway improvement works on St Andrews Road, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Sep 2025 at 09:57.

Gigaclear logo
Finishing
Monday
Details
View Map
Share
Follow
Road Running Through Preston Crowmarsh

Gigaclear are proposing to carry out Utility asset works on Road Running Through Preston Crowmarsh, Preston Crowmarsh, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 9 Jul 2025 at 15:12.

Oxfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
St Andrews Road

Oxfordshire County Council are proposing to carry out Highway improvement works on St Andrews Road, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Sep 2025 at 12:36.

Oxfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
St Peters Road

Oxfordshire County Council are proposing to carry out Highway improvement works on St Peters Road, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Sep 2025 at 09:53.

Oxfordshire County Council logo
Between
24 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Spring Lane

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Spring Lane, Aston Upthorpe, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 27 Aug 2025 at 11:47.

Virgin Media logo
Between
25 Sep and 8 Oct 2025
Details
View Map
Share
Ilges Lane

Virgin Media were proposing to carry out Utility asset works on Ilges Lane, Cholsey, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 27 Jun 2025 at 15:24.

Thames Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Sires Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sires Hill, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 09:58.

Thames Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Sires Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Sires Hill, Didcot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 11:27.

Thames Water logo
Between
6 and 29 Oct 2025
Details
View Map
Share
Follow
Brook Street

Thames Water are proposing to carry out Utility asset works on Brook Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 10:34.

Thames Water logo
Between
6 and 29 Oct 2025
Details
View Map
Share
Follow
Brook Street

Thames Water are proposing to carry out Utility asset works on Brook Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 14:55.

Thames Water logo
LONG TERM
Between
6 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Crown Lane

Thames Water are proposing to carry out Utility asset works on Crown Lane, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 12:06.

Thames Water logo
Between
6 and 29 Oct 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 10:35.

Thames Water logo
Between
6 and 29 Oct 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 14:55.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Lane Between Mill Road And Bridle Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lane Between Mill Road And Bridle Way, Goring, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 14:45.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Mill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Road, Goring, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Jul 2025 at 14:13.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Mill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Road, Goring, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 10:52.

Southern Gas Networks logo
Between
13 and 28 Oct 2025
Details
View Map
Share
Follow
Broadway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Broadway, Didcot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 12:01.

Thames Water logo
LONG TERM
Between
13 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Hale Road

Thames Water are proposing to carry out Utility asset works on Hale Road, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 11:25.

Thames Water logo
Between
13 and 21 Oct 2025
Details
View Map
Share
Follow
Sunnyside

Thames Water are proposing to carry out Utility asset works on Sunnyside, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 11:26.

Thames Water logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Roke Marsh

Thames Water were proposing to carry out Utility repair and maintenance works on Roke Marsh, Roke, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 10 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 10:41.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Church Street

Thames Water are proposing to carry out Utility repair and maintenance works on Church Street, Upton, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 16:14.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Church Street

Thames Water are proposing to carry out Utility repair and maintenance works on Church Street, Upton, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 09:51.

Airband Community Internet logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Icknield Road

Airband Community Internet are proposing to carry out Utility repair and maintenance works on Icknield Road, Goring, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Airband Community Internet on 31 Jul 2025 at 12:55.

Airband Community Internet logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Elvendon Road

Airband Community Internet are proposing to carry out Utility repair and maintenance works on Elvendon Road, Goring, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 30 Jul 2025 at 13:52.

Thames Water logo
Between
20 and 27 Oct 2025
Details
View Map
Share
Follow
Park Wall Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Wall Lane, Lower Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 14:41.

Thames Water logo
Between
21 and 30 Oct 2025
Details
View Map
Share
Follow
Sands Way

Thames Water are proposing to carry out Utility asset works on Sands Way, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 11:39.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Wallingford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wallingford Road, North Moreton, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 12:46.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Wallingford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wallingford Road, North Moreton, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 10:01.

Oxfordshire County Council logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Berins Hill

Oxfordshire County Council are proposing to carry out roadworks on Berins Hill, Ipsden, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by Oxfordshire County Council on 1 Aug 2025 at 11:30.

Thames Water logo
Between
28 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Park Wall Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Wall Lane, Lower Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 12:23.

Thames Water logo
Between
28 Oct and 2 Nov 2025
Details
View Map
Share
Park Wall Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Park Wall Lane, Lower Basildon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 11:15.

Southern Gas Networks logo
LONG TERM
Between
3 Nov 2025 and 16 May 2026
Details
View Map
Share
Follow
Hithercroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hithercroft, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 May 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Sep 2025 at 14:40.

Southern Gas Networks logo
LONG TERM
Between
3 Nov 2025 and 16 May 2026
Details
View Map
Share
Follow
Hithercroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hithercroft, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 May 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Sep 2025 at 11:17.

Oxfordshire County Council logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
Spring Lane

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Spring Lane, Aston Upthorpe, Didcot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 10:38.

Thames Water logo
LONG TERM
Between
10 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Road Running Through Roke From Chapel Lane To The Home Sweet Home

Thames Water are proposing to carry out Utility repair and maintenance works on Road Running Through Roke From Chapel Lane To The Home Sweet Home, Roke, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 14:19.

Thames Water logo
LONG TERM
Between
10 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Road Running Through Roke From Chapel Lane To The Home Sweet Home

Thames Water are proposing to carry out Utility repair and maintenance works on Road Running Through Roke From Chapel Lane To The Home Sweet Home, Roke, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2025 at 10:34.

Thames Water logo
LONG TERM
Between
10 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Road Passing The Home Sweet Home

Thames Water are proposing to carry out Utility repair and maintenance works on Road Passing The Home Sweet Home, Roke, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 14:17.

Thames Water logo
LONG TERM
Between
10 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Road Passing The Home Sweet Home

Thames Water are proposing to carry out Utility repair and maintenance works on Road Passing The Home Sweet Home, Roke, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2025 at 10:35.

Thames Water logo
LONG TERM
Between
10 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Roke Marsh

Thames Water are proposing to carry out Utility repair and maintenance works on Roke Marsh, Roke, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 09:50.

Thames Water logo
LONG TERM
Between
10 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Roke Marsh

Thames Water are proposing to carry out Utility repair and maintenance works on Roke Marsh, Roke, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 12:38.

Thames Water logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Ambury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ambury Road, Aldworth, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:06.

Thames Water logo
Between
11 and 14 Nov 2025
Details
View Map
Share
Follow
Ambury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ambury Road, Aldworth, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 10:23.

Thames Water logo
LONG TERM
Between
17 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Roke Marsh

Thames Water are proposing to carry out Utility repair and maintenance works on Roke Marsh, Roke, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 10:14.

Thames Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Westbrook Street

Thames Water were proposing to carry out Utility repair and maintenance works on Westbrook Street, Blewbury, Didcot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 15:06.

Thames Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Westbrook Street

Thames Water are proposing to carry out Utility repair and maintenance works on Westbrook Street, Blewbury, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 15:10.

Thames Water logo
Between
18 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Roke Marsh

Thames Water are proposing to carry out Utility repair and maintenance works on Roke Marsh, Roke, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 11:18.

Thames Water logo
Between
9 and 11 Dec 2025
Details
View Map
Share
Follow
Lovegrove's Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lovegrove's Lane, Checkendon, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 11 December 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 09:54.

Thames Water logo
Between
9 and 11 Dec 2025
Details
View Map
Share
Follow
Lovegrove's Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lovegrove's Lane, Checkendon, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 11 December 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 22 Sep 2025 at 08:53.

Thames Water logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manor Road, Goring, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 11:25.

Thames Water logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Bradley's Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bradley's Street, Checkendon, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 19 Sep 2025 at 14:43.

Oxfordshire County Council logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Spring Lane

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Spring Lane, Aston Upthorpe, Didcot.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 17 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 17 Sep 2025 at 13:41.


Roadworks Map near to Amwell Place, WALLINGFORD, OX10 9NZ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 23 Sep 2025 03:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Amwell Place, WALLINGFORD, OX10 9NZ (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
URGENT
  
SANDY LANE, CHOLSEY 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 22 Sep 2025 12:27
(Scheduled: 22 Sep 2025 - 24 Sep 2025)
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.