ROADWORKS SUMMARY
Coopers Piece, WALLINGFORD, OX10 8LD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Coopers Piece, OX10 8LD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Coopers Piece, WALLINGFORD, OX10 8LD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Coopers Piece are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
17 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Hithercroft Road

Thames Water are proposing to carry out New service connection on Hithercroft Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 15:45.

Thames Water logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are carrying out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:30 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 11:24.

Thames Water logo
LONG TERM
Between
17 Apr and 23 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 09:42.

Thames Water logo
LONG TERM
Between
17 Apr and 23 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 15:39.

Thames Water logo
LONG TERM
Between
17 Apr and 29 Jun 2025
Details
View Map
Share
Hithercroft Road

Thames Water were proposing to carry out New service connection on Hithercroft Road, Wallingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 29 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 09:15.

Thames Water logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Hithercroft Road

Thames Water are carrying out New service connection on Hithercroft Road, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:30 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 11:23.

Thames Water logo
LONG TERM
Between
17 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Hithercroft Road

Thames Water are proposing to carry out New service connection on Hithercroft Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 09:44.

Oxfordshire County Council logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Hale Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Hale Road, Benson, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 08:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 09:31.

Oxfordshire County Council logo
LONG TERM
Between
5 May and 29 Jun 2025
Details
View Map
Share
Follow
Hale Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Hale Road, Benson, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Apr 2025 at 09:42.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
24 Jun 2025
Details
View Map
Share
Follow
Burcot Lane

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Burcot Lane, Berinsfield, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 May 2025 at 08:12.

Gigaclear logo
Between
29 May and 18 Jun 2025
Details
View Map
Share
Follow
Road Between Swyncombe Church And Swyncombe Woods

Gigaclear are proposing to carry out Utility asset works on Road Between Swyncombe Church And Swyncombe Woods, Swyncombe, Henley-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 18 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 1 Apr 2025 at 11:45.

Gigaclear logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ferry Road

Gigaclear are proposing to carry out Utility asset works on Ferry Road, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 11 Mar 2025 at 16:38.

Gigaclear logo
Until
19 Jun 2025
Details
View Map
Share
Follow
Road Between Swyncombe Church And Swyncombe Woods

Gigaclear are carrying out Utility asset works on Road Between Swyncombe Church And Swyncombe Woods, Swyncombe, Henley-on-thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 14:30 and could run through until 19 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 May 2025 at 14:32.

Gigaclear logo
Between
5 and 13 Jun 2025
Details
View Map
Share
Follow
South Bank Cottages

Gigaclear are proposing to carry out Remedial works on South Bank Cottages, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 11 Mar 2025 at 16:35.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 11:09.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
St Johns Road

Thames Water were proposing to carry out New service connection on St Johns Road, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 08:20.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
St Johns Road

Thames Water were proposing to carry out New service connection on St Johns Road, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 10:14.

Thames Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Thames Water are proposing to carry out New service connection on St Johns Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 14:22.

Gigaclear logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Townsend Cottages

Gigaclear are proposing to carry out Utility asset works on Townsend Cottages, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 11 Mar 2025 at 16:25.

Gigaclear logo
Between
18 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Road Between Cookley Green And Swyncombe House

Gigaclear are proposing to carry out Utility asset works on Road Between Cookley Green And Swyncombe House, Swyncombe, Henley-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 8 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 1 Apr 2025 at 11:51.

Gigaclear logo
Between
18 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Road Between Cookley Green And Swyncombe House

Gigaclear are proposing to carry out Utility asset works on Road Between Cookley Green And Swyncombe House, Swyncombe, Henley-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 8 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 23 May 2025 at 11:09.

Gigaclear logo
Between
20 and 30 Jun 2025
Details
View Map
Share
The Street

Gigaclear were proposing to carry out Utility asset works on The Street, South Stoke, Reading.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 June 2025 and run through until 30 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 2 Apr 2025 at 09:17.

Gigaclear logo
Between
20 and 30 Jun 2025
Details
View Map
Share
Follow
The Street

Gigaclear are proposing to carry out Utility asset works on The Street, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 11 Mar 2025 at 16:32.

Gigaclear logo
Between
1 and 10 Jul 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (36203484)

Gigaclear are proposing to carry out Utility asset works on Unnamed--single Carriageway (36203484), Ipsden, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 10 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 9 Apr 2025 at 10:40.

Gigaclear logo
Between
1 and 10 Jul 2025
Details
View Map
Share
Cross Keys Road

Gigaclear were proposing to carry out Utility asset works on Cross Keys Road, South Stoke, Reading.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 10 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 24 Mar 2025 at 11:50.

Gigaclear logo
LONG TERM
Between
7 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Port Hill

Gigaclear are proposing to carry out Utility asset works on Port Hill, Nettlebed, Henley-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 2 May 2025 at 08:45.

Thames Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Cross Keys Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cross Keys Road, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 13:42.

Gigaclear logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Constitution Hill

Gigaclear are proposing to carry out Utility asset works on Constitution Hill, Mongewell, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 20 May 2025 at 09:47.

Gigaclear logo
Between
22 and 28 Jul 2025
Details
View Map
Share
Follow
Ferry Road

Gigaclear are proposing to carry out Utility asset works on Ferry Road, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 20 Apr 2025 at 01:13.

Gigaclear logo
Between
23 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (36203484)

Gigaclear are proposing to carry out Utility asset works on Unnamed--single Carriageway (36203484), Ipsden, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 11 Apr 2025 at 08:04.

Gigaclear logo
Between
29 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Cross Keys Road

Gigaclear are proposing to carry out Utility asset works on Cross Keys Road, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 7 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 9 Apr 2025 at 10:51.

Oxfordshire County Council logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
St Georges Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on St Georges Road, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Jun 2025 at 12:10.

Gigaclear logo
Between
5 and 13 Aug 2025
Details
View Map
Share
Follow
Road Passing Ipsden House

Gigaclear are proposing to carry out Utility asset works on Road Passing Ipsden House, Ipsden, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 13 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 11 Apr 2025 at 08:05.

Thames Water logo
LONG TERM
Between
6 Aug and 2 Dec 2025
Details
View Map
Share
Follow
Crown Lane

Thames Water are proposing to carry out Utility asset works on Crown Lane, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 May 2025 at 16:13.

Thames Water logo
Between
6 and 28 Aug 2025
Details
View Map
Share
Follow
Brook Street

Thames Water are proposing to carry out Utility asset works on Brook Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 10:36.

Thames Water logo
Between
6 and 28 Aug 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility asset works on High Street, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 10:34.

Gigaclear logo
Between
7 and 13 Aug 2025
Details
View Map
Share
Follow
The Street

Gigaclear are proposing to carry out Utility asset works on The Street, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 13 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 12 May 2025 at 13:48.

Gigaclear logo
Between
7 and 13 Aug 2025
Details
View Map
Share
Follow
The Street

Gigaclear are proposing to carry out Utility asset works on The Street, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 13 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 4 Apr 2025 at 11:38.

Gigaclear logo
Between
13 and 22 Aug 2025
Details
View Map
Share
Unnamed--single Carriageway (36203535)

Gigaclear were proposing to carry out Utility asset works on Unnamed--single Carriageway (36203535), Ipsden, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 22 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 29 Apr 2025 at 09:17.

Gigaclear logo
Between
14 and 19 Aug 2025
Details
View Map
Share
Follow
Townsend Cottages

Gigaclear are proposing to carry out Utility asset works on Townsend Cottages, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 20 Apr 2025 at 01:08.

Southern Gas Networks logo
Between
18 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Wimblestraw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wimblestraw Road, Berinsfield, Wallingford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 08:40.

Gigaclear logo
Between
19 and 28 Aug 2025
Details
View Map
Share
Follow
South Bank Cottages

Gigaclear are proposing to carry out Utility asset works on South Bank Cottages, South Stoke, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 20 Apr 2025 at 01:06.

Oxfordshire County Council logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Wantage Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Wantage Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Jun 2025 at 10:01.

Oxfordshire County Council logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Station Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Jun 2025 at 10:57.

Gigaclear logo
Between
26 Aug and 8 Sep 2025
Details
View Map
Share
Road Running Through Hailey

Gigaclear were proposing to carry out Utility asset works on Road Running Through Hailey, Ipsden, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 29 Apr 2025 at 09:18.

Gigaclear logo
Between
26 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (36203535)

Gigaclear are proposing to carry out Utility asset works on Unnamed--single Carriageway (36203535), Ipsden, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 7 May 2025 at 10:07.


Roadworks Map near to Coopers Piece, WALLINGFORD, OX10 8LD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 11:48
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Coopers Piece, WALLINGFORD, OX10 8LD (17 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
KINECROFT 
(0.4 miles)
BT
Utility asset works - Footway, Carriageway - Some carriageway incursion
Complete
28 May 2025 20:00 - 2 Jun 2025 05:00
0.4
Details
Share
2
BT logo
KINECROFT 
(0.4 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Complete
28 May 2025 20:00 - 2 Jun 2025 05:00
0.4
Details
Share
3
BT logo
ST MARYS STREET 
(0.4 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Complete
28 May 2025 20:00 - 2 Jun 2025 05:00
0.4
Details
Share
4
Thames Water logo
WANTAGE ROAD 
(0.4 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.4
Details
Share
5
Virgin Media logo
ST MARTINS STREET 
(0.4 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 5 Jun 2025
0.4
Details
Share
Follow
6
BT logo
CHURCH LANE 
(0.4 miles)
BT
Utility asset works - Footway, Carriageway - Some carriageway incursion
Complete
28 May 2025 20:00 - 2 Jun 2025 05:00
0.4
Details
Share
7
Thames Water logo
MAJOR
  
HITHERCROFT ROAD 
(0.5 miles)
Thames Water
New service connection - Carriageway - Multi-way signals
Cancelled
(Scheduled: 17 Apr 2025 - 29 Jun 2025)
0.5
Details
Share
8
Thames Water logo
MAJOR
  
HITHERCROFT ROAD 
(0.5 miles)
Thames Water
New service connection - Carriageway - Multi-way signals
In Progress
Since: 22 Apr 2025 10:30
(Scheduled: 17 Apr 2025 - 30 Jun 2025)
0.5
Details
Share
Follow
9
Thames Water logo
MAJOR
  
ST JOHNS ROAD 
(0.5 miles)
Thames Water
New service connection - Carriageway - Multi-way signals
Planned
Scheduled: 17 Apr 2025 - 23 Jun 2025
0.5
Details
Share
Follow
10
Thames Water logo
MAJOR
  
ST JOHNS ROAD 
(0.5 miles)
Thames Water
New service connection - Carriageway - Multi-way signals
In Progress
Since: 22 Apr 2025 10:30
(Scheduled: 17 Apr 2025 - 29 Jun 2025)
0.5
Details
Share