ROADWORKS SUMMARY
Thames Street, WALLINGFORD, OX10 0HD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Thames Street, OX10 0HD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Thames Street, WALLINGFORD, OX10 0HD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Thames Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
St Peters Street

Oxfordshire County Council are carrying out Highway repair and maintenance works on St Peters Street, Wallingford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 08:00 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 17 Oct 2024 at 11:38.

Thames Water logo
LONG TERM
Between
2 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Calvin Thomas Way

Thames Water are proposing to carry out New service connection on Calvin Thomas Way, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:29.

Thames Water logo
LONG TERM
Between
2 Oct and 6 Dec 2024
Details
View Map
Share
Calvin Thomas Way

Thames Water were proposing to carry out New service connection on Calvin Thomas Way, Wallingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 12:06.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Blewbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blewbury Road, East Hagbourne, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 15:00.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Blewbury Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Blewbury Road, East Hagbourne, Didcot.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 15:11.

Thames Water logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Calvin Thomas Way

Thames Water are carrying out New service connection on Calvin Thomas Way, Wallingford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 13:45 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 15:38.

Thames Water logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Calvin Thomas Way

Thames Water are proposing to carry out New service connection on Calvin Thomas Way, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 11:59.

Southern Gas Networks logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are carrying out roadworks on Main Road, East Hagbourne, Didcot.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 11:40.

Oxfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Abingdon Road

Oxfordshire County Council are carrying out Section 50 on Abingdon Road, Didcot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 14:43.

Oxfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Abingdon Road

Oxfordshire County Council are proposing to carry out Section 50 on Abingdon Road, Didcot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 22 Oct 2024 at 09:50.

Oxfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lady Grove

Oxfordshire County Council are proposing to carry out Section 50 on Lady Grove, Didcot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Oct 2024 at 14:01.

Oxfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lady Grove

Oxfordshire County Council are carrying out Section 50 on Lady Grove, Didcot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 15:05.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Abingdon Road

Oxfordshire County Council are carrying out Section 50 on Abingdon Road, Didcot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 09:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 6 Nov 2024 at 16:03.

Thames Water logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Calvin Thomas Way

Thames Water are proposing to carry out New service connection on Calvin Thomas Way, Wallingford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 15:50.

Airband Community Internet logo
Finishing
Thursday
Details
View Map
Share
Follow
Wallingford Road

Airband Community Internet are carrying out Highway repair and maintenance works on Wallingford Road, Streatley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 08:00 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 18 Nov 2024 at 11:31.

Oxfordshire County Council logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Cottesmore Lane

Oxfordshire County Council are carrying out Highway repair and maintenance works on Cottesmore Lane, Ewelme, Wallingford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 08:28.

Oxfordshire County Council logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Cottesmore Lane

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Cottesmore Lane, Ewelme, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 9 Sep 2024 at 15:11.

Between
27 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Hale Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Hale Road, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 10 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Sep 2024 at 13:47.

Between
27 Nov and 10 Dec 2024
Details
View Map
Share
Hale Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Hale Road, Benson, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 10 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Oct 2024 at 11:55.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
High Street

Thames Water were proposing to carry out Utility repair and maintenance works on High Street, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 12:32.

Thames Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
High Street

Thames Water were proposing to carry out Utility repair and maintenance works on High Street, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 08:44.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
West End

Southern Gas Networks are proposing to carry out New service connection on West End, Brightwell-cum-sotwell, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 15:42.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Brookmead Drive

Oxfordshire County Council are proposing to carry out Section 50 on Brookmead Drive, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 22 Nov 2024 at 14:57.

Between
8 and 14 Jan 2025
Details
View Map
Share
Hale Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Hale Road, Benson, Wallingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Oct 2024 at 11:59.

Thames Water logo
LONG TERM
Between
13 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Hithercroft Road

Thames Water are proposing to carry out New service connection on Hithercroft Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 11:14.

Thames Water logo
LONG TERM
Between
13 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Hithercroft Road

Thames Water are proposing to carry out New service connection on Hithercroft Road, Wallingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 15:58.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Battle Road

Thames Water are proposing to carry out Utility repair and maintenance works on Battle Road, Goring, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 14:09.

Thames Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Goldsmiths Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Goldsmiths Lane, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:39.

Thames Water logo
Between
5 and 8 Feb 2025
Details
View Map
Share
Follow
Beech Lane

Thames Water are proposing to carry out New service connection on Beech Lane, Woodcote, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 8 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 14:45.

Thames Water logo
Between
5 and 8 Feb 2025
Details
View Map
Share
Beech Lane

Thames Water were proposing to carry out New service connection on Beech Lane, Woodcote, Reading.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 14:41.

Thames Water logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Church Road, Benson, Wallingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 07:29.

Thames Water logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Church Street

Thames Water are proposing to carry out New service connection on Church Street, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 10:33.


Roadworks Map near to Thames Street, WALLINGFORD, OX10 0HD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 05:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Thames Street, WALLINGFORD, OX10 0HD (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Oxfordshire County Council logo
MAJOR
  
ST PETERS STREET 
(0.2 miles)
Oxfordshire County Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 15 Aug 2024 08:00
(Scheduled: 15 Aug 2024 - 15 Dec 2024)
0.2
Details
Share
Follow
2
Oxfordshire County Council logo
MAJOR
  
ST JOHNS ROAD 
(0.4 miles)
Oxfordshire County Council
Section 50 - Footway - Multi-way signals
Planned
Scheduled: 18 Nov 2024 - 8 Dec 2024
0.4
Details
Share
Follow
3
Oxfordshire County Council logo
MAJOR
  
ST JOHNS ROAD 
(0.4 miles)
Oxfordshire County Council
Section 50 - Footway - Multi-way signals
In Progress
Since: 18 Nov 2024 09:30
(Scheduled: 18 Nov 2024 - 8 Dec 2024)
0.4
Details
Share
Follow
4
Thames Water logo
FIR TREE AVENUE, BRIGHTWELL-CUM-SOTWELL 
(0.7 miles)
Thames Water
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.7
Details
Share
Follow
5
Thames Water logo
URGENT
  
CHILTERN CRESCENT 
(0.8 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 22 Nov 2024 09:46
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.