ROADWORKS SUMMARY
Featherstall Road North, OLDHAM, OL9 6BW
Introduction
View current and future planned roadworks and road closures for Featherstall Road North, OL9 6BW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Featherstall Road North, OLDHAM, OL9 6BW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Featherstall Road North are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Apr 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on London Road, Oldham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2020 at 14:30 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 7 May 2024 at 07:37.
31 Jan 2025
Oldham Metropolitan Borough Council are carrying out Section 50 on Southgate Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 January 2022 at 09:31 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 8 Aug 2023 at 10:14.
4 Jun 2023 and 29 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Gipsy Lane, Castleton North, Rochdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2023 and could run through until 29 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Apr 2023 at 14:30.
4 Jun 2023 and 29 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Manchester Road, Sparthbottoms & College Bank, Rochdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2023 and could run through until 29 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Apr 2023 at 06:59.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Bank Bridge Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Briscoe Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Ten Acres Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:21.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Grimshaw Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Oldham Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Lathbury Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Monsall Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.
30 Apr 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Priest Hill, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:44.
30 Apr 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Fountain Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:42.
30 Apr 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on New Radcliffe Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:43.
15 Nov 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Place, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:30 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:44.
12 Aug 2024 and 11 Aug 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Boothroyden Road, Rhodes, Middleton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 11 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Aug 2024 at 13:39.
1 Sep 2024 and 1 Apr 2026
Tameside Metropolitan Borough Council are proposing to carry out Section 50 on Fleet Street, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 April 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 20 May 2024 at 12:10.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on High Street, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Yorkshire Street, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:42.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Church Terrace, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Church Street, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:42.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Curzon Street, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.
7 Oct 2024 and 25 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Jul 2024 at 07:22.
24 Oct 2024 and 2 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Springs Lane, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 13:28.
11 Nov 2024 and 1 Sep 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Sheepfoot Lane, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Aug 2024 at 14:42.
28 Nov 2024 and 9 Jan 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vale Drive, Oldham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 25 Nov 2024 at 13:42.
9 Jan 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Vale Drive, Oldham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 09:30 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 2 Dec 2024 at 13:41.
5 Dec 2024 and 9 Apr 2025
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Tuns Road, Oldham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Nov 2024 at 14:09.
9 Dec 2024 and 19 Jan 2025
Electricity North West (NorWeb) were proposing to carry out Utility asset works on Woodbine Street East, Turf Hill & Lower Place & Buersil, Rochdale.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 19 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 10:10.
10 Dec 2024 and 3 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Grafton Street, Newbold, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:07.
10 Dec 2024 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Channing Street, Newbold, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:05.
19 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colindale Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 12:28.
19 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colindale Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:11.
19 Dec 2024 and 9 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Levedale Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 12:28.
19 Dec 2024 and 7 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Amesbury Road, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 12:28.
30 Dec 2024 and 10 Jan 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Castlemere Street, Milkstone, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 18 Oct 2024 at 10:21.
30 Dec 2024 and 10 Jan 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Mere Street, Milkstone, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 2 Oct 2024 at 15:12.
1 and 8 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Guildford Drive, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Nov 2024 at 09:18.
1 and 15 Jan 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Ashfield Road, Deeplish, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 1 Oct 2024 at 15:10.
1 and 15 Jan 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Kensington Street, Deeplish, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 1 Oct 2024 at 15:13.
1 and 15 Jan 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Ashfield Road, Deeplish, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 1 Oct 2024 at 15:11.
1 and 15 Jan 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Osborne Street, Deeplish, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 1 Oct 2024 at 15:18.
1 and 15 Jan 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Osborne Street, Deeplish, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 29 Oct 2024 at 08:25.
1 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Silver Hill, Milnrow North & Firgrove, Milnrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 09:58.
2 Jan and 6 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Moston Lane East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.
2 Jan and 6 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Broadway, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.
2 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Oaklands Road, Grasscroft.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 14:50.
2 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Grasscroft.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 14:51.
2 and 6 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Lovers Lane, Grasscroft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 28 Nov 2024 at 12:49.
2 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:13.
2 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:26.
2 Jan and 22 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on George Street, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 16:03.
3 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Culcheth Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 09:22.
6 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Pottinger Street, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:18.
6 Jan and 4 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Pottinger Street, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 13:18.
6 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Crowthorn Road, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:18.
6 and 26 Jan 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Union Street, Ashton-under-lyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 26 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:02.
6 Jan and 25 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Turner Lane, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Aug 2024 at 13:13.
6 and 23 Jan 2025
Electricity North West (NorWeb) are proposing to carry out Remedial works on Gaskell Street, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 14:29.
6 and 9 Jan 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Droylsden Road, Manchester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Nov 2024 at 16:25.
6 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Nuthurst Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 09:17.
6 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Moston Lane, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 10:00.
6 Jan and 9 Apr 2025
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Bankfield Drive, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Nov 2024 at 13:36.
6 Jan and 9 Mar 2025
Manchester City Council are proposing to carry out Highway improvement works on Victoria Avenue East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 14 Nov 2024 at 09:44.
6 Jan and 9 Mar 2025
Manchester City Council are proposing to carry out Highway improvement works on Hinchley Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 14 Nov 2024 at 09:44.
6 Jan and 14 Feb 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Oldham Way, Oldham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 29 Oct 2024 at 08:29.
6 and 20 Jan 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Delph Lane, Delph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 18 Nov 2024 at 10:01.
6 and 20 Jan 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Delph Lane, Delph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 18 Nov 2024 at 10:13.
6 and 31 Jan 2025
Electricity North West (NorWeb) were proposing to carry out Utility asset works on Gipsy Lane, Castleton North, Rochdale.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 12:47.
6 and 19 Jan 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Kensington Street, Deeplish, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 11 Dec 2024 at 08:59.
6 and 19 Jan 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Osborne Street, Deeplish, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 11 Dec 2024 at 09:00.
6 Jan and 11 Apr 2025
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Kingsway, Newbold, Rochdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 24 Sep 2024 at 15:07.
6 Jan and 11 Apr 2025
Electricity North West (NorWeb) were proposing to carry out Utility asset works on Albert Royds Street, Belfield & Howarth Cross, Rochdale.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Oct 2024 at 08:12.
8 and 21 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Remedial works on Chapel Gate, Milnrow North & Firgrove, Milnrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Oct 2024 at 11:39.
13 and 17 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Beal Lane, Shaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 15:00.
13 and 17 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Beal Lane, Shaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 08:37.
14 and 16 Jan 2025
United Utilities Water (formerly North West Water) were proposing to carry out New service connection on Hillcrest Road, Castleton South, Rochdale.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Nov 2024 at 14:16.
15 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Ashton Road, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:24.
15 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on The Meadows, Alkrington East, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 11:26.
15 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on The Meadows, Alkrington East, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:01.
15 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kingsway, Alkrington West, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:00.
16 Jan and 4 Feb 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dingle Avenue, Shaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 18 Nov 2024 at 10:01.
16 Jan and 4 Feb 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dingle Avenue, Shaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 18 Nov 2024 at 10:13.
16 Jan and 4 Feb 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Shore Avenue, Shaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 18 Nov 2024 at 10:00.
16 Jan and 4 Feb 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Shore Avenue, Shaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 18 Nov 2024 at 10:16.
18 Jan and 7 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Kingsway, Newbold, Rochdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 29 Nov 2024 at 10:42.
18 Jan and 7 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Kingsway, Newbold, Rochdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Dec 2024 at 14:46.
18 Jan and 7 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Kingsway, Newbold, Rochdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Dec 2024 at 08:44.
20 Jan and 7 Feb 2025
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on Oldham Road, Manchester.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 29 Oct 2024 at 11:43.
20 and 31 Jan 2025
Manchester City Council are proposing to carry out Highway improvement works on Bush Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:51.
20 and 31 Jan 2025
Manchester City Council are proposing to carry out Highway improvement works on Sanderson Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:55.
20 and 31 Jan 2025
Manchester City Council are proposing to carry out Highway improvement works on Aldworth Drive, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:50.
20 and 31 Jan 2025
Manchester City Council are proposing to carry out Highway improvement works on Factory Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 27 Sep 2024 at 12:18.
20 and 31 Jan 2025
Manchester City Council are proposing to carry out Highway improvement works on Dalbeattie Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:52.
20 and 31 Jan 2025
Manchester City Council are proposing to carry out Highway improvement works on Lewis Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:54.
20 Jan and 11 May 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Oldham Road, Middleton East, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Rochdale Borough Council on 22 Nov 2024 at 09:32.
20 Jan and 2 Feb 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Ashfield Road, Deeplish, Rochdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 3 Dec 2024 at 13:12.
20 Jan and 2 Feb 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Ashfield Road, Deeplish, Rochdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Rochdale Borough Council on 3 Dec 2024 at 13:12.
20 Jan and 7 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Albert Royds Street, Belfield & Howarth Cross, Rochdale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2024 at 08:47.
22 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tweedle Hill Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 12:54.
22 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Chapel Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 12:53.
22 Jan and 6 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oaklands Road, Grasscroft.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:42.
22 Jan and 6 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Grasscroft.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:28.
23 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Huddersfield Road, Mossley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:55.
23 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Moorlands Drive, Mossley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:56.
23 Jan and 11 May 2025
Rochdale Borough Council are proposing to carry out roadworks on Taylor Street, Middleton East, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rochdale Borough Council on 17 Dec 2024 at 15:33.
24 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roaches Way, Mossley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 12:00.
24 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on George Street, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:31.
27 Jan and 27 Oct 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:00.
27 and 31 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Spring Bank Lane, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:58.
27 and 31 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Mill Lane, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Dec 2024 at 15:29.
27 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tweedle Hill Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 16:37.
27 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Chapel Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 14:07.
27 Jan and 16 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Railway Street, Hopwood West, Heywood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Dec 2024 at 08:40.
27 Jan and 16 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Railway Street, Hopwood West, Heywood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 13 Dec 2024 at 09:15.
27 Jan and 11 Feb 2025
Telefonica UK are proposing to carry out Utility asset works on Ruskin Road, Kirkholt, Rochdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telefonica UK on 26 Nov 2024 at 14:39.
27 Jan and 11 Feb 2025
Telefonica UK were proposing to carry out Utility asset works on Ruskin Road, Kirkholt, Rochdale.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 11 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Telefonica UK on 4 Dec 2024 at 15:14.
28 and 30 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Hanover Street, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 14:10.
29 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Crowthorn Road, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:37.
29 Jan and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Nuthurst Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:30.
29 Jan and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Moston Lane, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:30.
29 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Huddersfield Road, Mossley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:06.
29 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on The Meadows, Alkrington East, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 11:51.
29 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Kingsway, Alkrington West, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 13:16.
29 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Flake Lane, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 16:22.
29 Jan and 20 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Marlfield Road, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:19.
29 Jan and 20 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:18.
3 Feb and 21 Mar 2025
Tameside Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tame Street, Stalybridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 25 Oct 2024 at 11:05.
3 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Whitebank Road, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 14:14.
3 Feb and 6 Apr 2025
Manchester City Council are proposing to carry out Highway improvement works on Victoria Avenue East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 5 Nov 2024 at 10:53.
3 Feb and 6 Apr 2025
Manchester City Council are proposing to carry out Highway improvement works on Hinchley Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 5 Nov 2024 at 10:53.
3 and 28 Feb 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Den Lane, Uppermill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 10:12.
5 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Plant Hill Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 12:54.
5 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Castlemere Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 12:53.
5 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Calf Hey Road, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:27.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on John Heywood Street, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:27.
10 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wellington Road, Ashton-under-lyne.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:10.
10 Feb and 12 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Ashton-under-lyne.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:10.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ashton Road, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 15:04.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Castlemere Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 14:07.
12 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ridge Hill Lane, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:40.
12 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Arlies Lane, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:37.
12 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Buckstones Road, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:26.
13 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 15:40.
15 and 23 Feb 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Clarence Street, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 21 Nov 2024 at 08:55.
17 Feb and 25 Mar 2025
Manchester City Council are proposing to carry out Highway improvement works on Westbury Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 9 Dec 2024 at 09:07.
17 and 25 Feb 2025
Manchester City Council are proposing to carry out Highway improvement works on Birch Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 9 Dec 2024 at 09:01.
17 Feb and 4 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Road, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 13:30.
17 Feb and 25 Mar 2025
Manchester City Council are proposing to carry out Highway improvement works on Parkhill Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 9 Dec 2024 at 09:11.
17 and 19 Feb 2025
Tameside Metropolitan Borough Council are proposing to carry out Utility asset works on Mill Lane, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 10 Dec 2024 at 11:28.
17 Feb and 28 Mar 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Broadway, Royton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 16 Dec 2024 at 09:53.
17 Feb and 28 Mar 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Broadway, Royton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 16 Dec 2024 at 10:22.
19 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Springs Lane, Stalybridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:44.
19 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Shaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:48.
19 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Shaw.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:10.
19 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Buckstones Road, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:21.
20 and 23 Feb 2025
Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Lovers Lane, Grasscroft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 17 Dec 2024 at 12:45.
20 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Shaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 16:08.
24 Feb and 20 Apr 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Manchester Road, Hopwood East & Birch, Heywood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Dec 2024 at 08:40.
24 Feb and 20 Apr 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Manchester Road, Hopwood East & Birch, Heywood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 13 Dec 2024 at 09:15.
24 and 26 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Princess Road, Milnrow North & Firgrove, Milnrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Dec 2024 at 15:23.
25 Feb and 10 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Fairclough Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Dec 2024 at 11:16.
26 Feb and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Clough Road, Droylsden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 11:31.
26 Feb and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Stamford Grove, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 16:30.
26 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Astley Road, Stalybridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:36.
26 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Windermere Road, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 12:04.
26 Feb and 13 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Road, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 16:10.
26 Feb and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Whitebank Road, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:54.
26 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Marlfield Road, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 15:03.
26 Feb and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:57.
26 Feb and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:50.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Tweedle Hill Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 07:18.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chapel Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 14:44.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Crab Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 14:44.
5 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:20.
10 and 21 Mar 2025
Manchester City Council are proposing to carry out Highway improvement works on Rochdale Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 17 Dec 2024 at 11:21.
12 Mar and 2 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Plant Hill Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 12:27.
12 Mar and 2 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Castlemere Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 14:41.
12 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Rochdale Lane, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:32.
12 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Flake Lane, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:32.
12 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Fir Bank Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:26.
12 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Fir Lane, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:46.
12 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Cedar Grove, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:46.
15 and 19 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Berry Brow, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 14:29.
Roadworks Map near to Featherstall Road North, OLDHAM, OL9 6BW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Featherstall Road North, OLDHAM, OL9 6BW (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 28 Nov 2024 - 9 Jan 2025)
(Scheduled: 15 Apr 2024 - 30 Apr 2025)
(Scheduled: 15 Apr 2024 - 30 Apr 2025)
(Scheduled: 15 Apr 2024 - 30 Aug 2025)
(Scheduled: 15 Apr 2024 - 30 Apr 2025)
(Scheduled: 15 Apr 2024 - 30 Aug 2025)
(Scheduled: 13 May 2024 - 15 Nov 2025)
Contains public sector information licensed under the Open Government Licence v3.0.