ROADWORKS SUMMARY
Tenby Road, OLDHAM, OL8 4ST
Introduction

View current and future planned roadworks and road closures for Tenby Road, OL8 4ST and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Tenby Road, OLDHAM, OL8 4ST
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tenby Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
31 Oct 2025
Oldham Metropolitan Borough Council are carrying out Section 50 on Southgate Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 January 2022 at 09:31 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 31 Mar 2025 at 11:36.
15 Nov 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Place, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:30 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:44.
1 Sep 2024 and 1 Apr 2026
Tameside Metropolitan Borough Council are proposing to carry out Section 50 on Fleet Street, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 April 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 20 May 2024 at 12:10.
2 Jan and 6 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Moston Lane East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.
2 Jan and 6 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Broadway, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.
6 Jan 2025 and 5 Jan 2026
Manchester City Council are proposing to carry out Highway improvement works on Mason Street, Manchester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 5 January 2026. The works will impact the footway, carriageway, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 13 Feb 2025 at 13:44.
28 Sep 2025
Manchester City Council are carrying out Highway improvement works on Victoria Avenue East, Manchester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 09:30 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 28 Aug 2025 at 16:30.
27 Jan and 27 Oct 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:00.
1 Apr and 1 Oct 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Turner Lane, Ashton-under-lyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:01.
25 Apr 2025 and 5 Jan 2026
Manchester City Council are proposing to carry out Highway improvement works on Cross Keys Street, Manchester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 5 January 2026. The works will impact the footway, carriageway, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 22 Apr 2025 at 13:13.
6 May and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Middleton Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 4 Feb 2025 at 15:36.
6 May and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Oldham Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 4 Feb 2025 at 15:36.
6 May and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High Barn Street, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 4 Feb 2025 at 15:31.
6 May and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rochdale Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 4 Feb 2025 at 15:14.
27 May 2025 and 6 Jan 2026
Manchester City Council are proposing to carry out Highway improvement works on Bendix Street, Manchester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 6 January 2026. The works will impact the footway, carriageway, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 22 Apr 2025 at 13:07.
27 May 2025 and 5 Jan 2026
Manchester City Council are proposing to carry out Highway improvement works on Ludgate Hill, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 5 January 2026. The works will impact the footway, carriageway, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 22 Apr 2025 at 13:31.
27 May 2025 and 5 Jan 2026
Manchester City Council are proposing to carry out Highway improvement works on Gould Street, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 5 January 2026. The works will impact the footway, carriageway, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 22 Apr 2025 at 13:17.
2 Oct 2025
Manchester City Council are carrying out Highway improvement works on Sawley Road, Manchester.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 June 2025 at 11:00 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 13 Jun 2025 at 11:56.
9 Jan 2026
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Bendix Street, Manchester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 June 2025 at 09:41 and could run through until 9 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Jun 2025 at 13:21.
30 Jun and 25 Sep 2025
United Utilities Water (formerly North West Water) are proposing to carry out Highway improvement works on Broadway, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Jun 2025 at 09:29.
31 Oct 2025
United Utilities Water (formerly North West Water) are carrying out Highway improvement works on Broadway, Manchester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 June 2025 at 10:20 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 16:30.
30 Jun and 26 Sep 2025
United Utilities Water (formerly North West Water) are proposing to carry out Highway improvement works on Moston Lane East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Jun 2025 at 09:28.
31 Oct 2025
United Utilities Water (formerly North West Water) are carrying out Highway improvement works on Moston Lane East, Manchester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 June 2025 at 10:20 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 16:30.
30 Jun and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Moston Lane East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 19 May 2025 at 15:39.
30 Jun and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Broadway, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 19 May 2025 at 15:38.
Tomorrow
Manchester City Council are carrying out Highway repair and maintenance works on Charlestown Road, Manchester.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 July 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 11 Sep 2025 at 16:30.
20 Jul and 17 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 6 Jun 2025 at 10:42.
21 Jul and 17 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 10:47.
28 Jul and 16 Nov 2025
Manchester City Council are proposing to carry out Highway improvement works on Sawley Road, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 29 Apr 2025 at 09:06.
28 Sep 2025
Electricity North West (NorWeb) are carrying out New service connection on Long Lane, Chadderton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 August 2025 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Sep 2025 at 14:42.
5 Jan 2026
Electricity North West (NorWeb) are carrying out New service connection on Chamber Road, Oldham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 09:40 and could run through until 5 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 09:07.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Kirkmanshulme Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 15:01.
19 Oct 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Bennett Street, Manchester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2025 at 14:47 and could run through until 19 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2025 at 16:19.
Tomorrow
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Lydia Becker Way, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 24 Jun 2025 at 08:41.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Middleton East, Middleton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 11:55.
Monday
Cadent Gas are proposing to carry out Utility asset works on Mills Hill Road, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 14:35.
Monday
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 14:34.
Tomorrow
Manchester City Council are proposing to carry out Highway improvement works on Grey Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:30.
Tomorrow
Manchester City Council are proposing to carry out Highway improvement works on Coverdale Crescent, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:33.
Tomorrow
Manchester City Council are proposing to carry out Highway improvement works on Higher Ardwick, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:32.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Stock Lane, Chadderton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 August 2025 at 10:42 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 13:25.
27 Aug and 25 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Market Street, Droylsden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 20:30.
28 Aug and 29 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Lees Road, Ashton-under-lyne.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 August 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 09:08.
Today
Cadent Gas are proposing to carry out Utility asset works on Bromley Street, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:04.
Wednesday
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Railway Road, Chadderton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 16 Sep 2025 at 10:57.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Rayleigh Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 24 Apr 2025 at 13:31.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Newhaven Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 24 Apr 2025 at 13:32.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on South Street, Bradford, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 24 Apr 2025 at 13:35.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Parkhouse Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 24 Apr 2025 at 13:31.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Louisa Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 24 Apr 2025 at 13:33.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Clayton Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 24 Apr 2025 at 13:42.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Hart Street, Droylsden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 21:00.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Stanton Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 24 Apr 2025 at 13:30.
28 Nov 2025
Cadent Gas are carrying out Utility asset works on Market Street, Droylsden.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 09:21 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 09:21.
3 Oct 2025
Cadent Gas are carrying out Utility asset works on Moorside Street, Droylsden.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 14:20 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 08:23.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Cheetham Hill Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:33.
1 and 28 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Cheetham Hill Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 27 Aug 2025 at 13:46.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Gould Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:32.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Bury New Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:33.
28 Sep 2025
Manchester City Council are carrying out Highway improvement works on Bury New Road, Manchester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 13:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 17 Sep 2025 at 10:37.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Queens Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:31.
1 and 28 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Queens Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 27 Aug 2025 at 13:56.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Cheetham Hill Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:33.
1 and 28 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Cheetham Hill Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 27 Aug 2025 at 13:57.
1 and 28 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Bury Old Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 27 Aug 2025 at 13:58.
1 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Lightbowne Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:32.
Tomorrow
Oldham Metropolitan Borough Council are carrying out Section 50 on Cromford Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Sep 2025 at 15:33.
2 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Hyde Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 26 Aug 2025 at 10:23.
2 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Kirkmanshulme Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 28 Aug 2025 at 13:26.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Oldham Road, Manchester.
The works started on 2 September 2025 at 14:35 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 08:54.
2 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Lightbowne Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 26 Aug 2025 at 09:16.
2 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Lightbowne Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 26 Aug 2025 at 09:28.
3 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Mount Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 26 Aug 2025 at 13:26.
3 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Stanley Grove, Longsight, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 26 Aug 2025 at 13:12.
4 Sep 2025 and 30 Jan 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Chamber Road, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Jun 2025 at 15:09.
29 Sep 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Pottery Lane, Manchester.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 September 2025 at 19:00 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Sep 2025 at 07:22.
29 Sep 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Pottery Lane, Manchester.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 September 2025 at 19:00 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Sep 2025 at 07:22.
5 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Higher Ardwick, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 1 Sep 2025 at 10:52.
Sunday
Electricity North West (NorWeb) were proposing to carry out Utility asset works on Leicester Road, Salford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 September 2025 and run through until 21 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Sep 2025 at 08:13.
6 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Coverdale Crescent, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 1 Sep 2025 at 13:08.
6 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Parkhouse Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 1 Sep 2025 at 13:32.
6 Oct 2025
Electricity North West (NorWeb) are carrying out New service connection on Woodstock Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 08:00 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2025 at 08:12.
7 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Louisa Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 08:31.
7 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Clayton Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 1 Sep 2025 at 13:42.
7 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Stanton Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 08:40.
8 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Fairfield Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 08:52.
8 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Sheffield Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 15:04.
8 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Boad Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 09:12.
5 Jan 2026
Manchester City Council are carrying out Highway improvement works on Old Mill Street, Manchester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 07:00 and could run through until 5 January 2026. The works will impact the footway, carriageway, cycleway and footpath.
This roadwork event was last updated by Manchester City Council on 10 Sep 2025 at 16:30.
Monday
Cadent Gas are proposing to carry out Utility asset works on Greenhurst Road, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Jun 2025 at 10:56.
Monday
Cadent Gas are proposing to carry out Utility asset works on Greenhurst Road, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 09:31.
26 Sep 2025
Manchester City Council are carrying out Highway improvement works on Hemsley Street South, Manchester.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 09:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 18 Sep 2025 at 15:32.
Tomorrow
Transport For Greater Manchester are proposing to carry out Highway improvement works on Sheepfoot Lane, Prestwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport For Greater Manchester on 1 Sep 2025 at 10:17.
Tomorrow
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Grimshaw Lane, Chadderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 5 Aug 2025 at 15:37.
8 Sep and 3 Oct 2025
Rochdale Borough Council are proposing to carry out Highway repair and maintenance works on Boarshaw Road, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rochdale Borough Council on 19 Feb 2025 at 10:49.
9 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Grey Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 1 Sep 2025 at 13:18.
29 Sep 2025
Cadent Gas are carrying out Utility repair and maintenance works on Ardwick Green North, Manchester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2025 at 10:16 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 14:29.
9 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on South Street, Bradford, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 1 Sep 2025 at 13:52.
9 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Store Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 09:22.
9 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Ludgate Hill, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 10:09.
9 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Gould Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 10:20.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Great Ancoats Street, Manchester.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2025 at 14:46 and could run through until 23 September 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 13:43.
10 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Simeon Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 15:04.
10 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Rochdale Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Sep 2025 at 10:44.
13 Sep and 5 Oct 2025
Electricity North West (NorWeb) were proposing to carry out New service connection on Manchester Road, Denton.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 September 2025 and run through until 5 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 10:51.
14 Sep and 17 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Bury Old Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:00.
15 Sep and 17 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Debdale Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:00.
15 Sep and 17 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Hyde Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:02.
15 and 28 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Gorton Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 08:54.
28 Sep 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Gorton Road, Manchester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 09:30 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2025 at 11:16.
17 Oct 2025
Cadent Gas are carrying out Utility asset works on Thornhill Road, Droylsden.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 10:45 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 10:58.
15 Sep and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Deal Walk, Chadderton.
These works are categorised as Major.
The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 11:00.
5 Oct 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Ripponden Road, Oldham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 12:52 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 14:51.
16 Sep and 5 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Debdale Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 15 Sep 2025 at 10:17.
16 and 30 Sep 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Ardwick Green North, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Sep 2025 at 12:15.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on West Avenue, Moston, Manchester.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 13:54 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 08:54.
Monday
Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Mellalieu Street, Langley South East & Towncroft, Middleton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 11:00 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2025 at 15:08.
17 Sep and 3 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Gorton Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jul 2025 at 12:12.
Monday
Tameside Metropolitan Borough Council are carrying out Highway repair and maintenance works on Hoppet Lane, Droylsden.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 08:30 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 17 Sep 2025 at 09:01.
Tuesday
Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Poland Street, Manchester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 12:30 and could run through until 23 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Sep 2025 at 09:07.
Tuesday
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Lord Street, Ashton-under-lyne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 06:13 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2025 at 10:51.
17 Sep and 10 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Grimshaw Lane, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Aug 2025 at 13:28.
10 Oct 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Grimshaw Lane, Manchester.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 11:03 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 11:40.
Tuesday
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Bristol Street, Salford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 16:14 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Sep 2025 at 16:00.
19 and 25 Sep 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Binns Street, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jul 2025 at 09:39.
20 Sep and 3 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Ardwick Green North, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Sep 2025 at 09:52.
20 Sep and 24 Oct 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Long Lane, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Jun 2025 at 12:36.
22 and 25 Sep 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Williams Road, Gorton, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 2 Sep 2025 at 15:05.
22 and 25 Sep 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Williams Road, Gorton, Manchester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 8 Sep 2025 at 14:27.
22 Sep and 3 Oct 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Whitworth Street East, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 12:28.
22 and 26 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Bennett Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 12:50.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Enville Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:29.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Enville Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 16 Sep 2025 at 10:24.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Ringcroft Gardens, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:23.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Ringcroft Gardens, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 16 Sep 2025 at 10:20.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Pentland Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:24.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Pentland Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 16 Sep 2025 at 10:16.
22 Sep and 9 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Turf Lane, Chadderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 9 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Sep 2025 at 10:35.
22 Sep and 3 Oct 2025
Transport For Greater Manchester are proposing to carry out Highway improvement works on Sheepfoot Lane, Prestwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 1 Sep 2025 at 11:50.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Kirkway, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:24.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Kirkway, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 15 Sep 2025 at 17:33.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Daneswood Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:29.
22 and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Daneswood Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 16 Sep 2025 at 10:18.
22 Sep and 17 Oct 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Foxdenton Lane, Chadderton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 16 Sep 2025 at 11:44.
22 Sep and 17 Oct 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Foxdenton Lane, Chadderton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 16 Sep 2025 at 11:46.
22 Sep and 24 Oct 2025
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Lydia Becker Way, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 19 Aug 2025 at 08:18.
22 Sep and 19 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Ripponden Road, Oldham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 27 Aug 2025 at 11:37.
23 and 29 Sep 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Greenways, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jul 2025 at 12:11.
24 Sep and 12 Oct 2025
Electricity North West (NorWeb) were proposing to carry out New service connection on Great Ancoats Street, Manchester.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 September 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 10:52.
26 Sep and 7 Oct 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Dalbeattie Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Jul 2025 at 11:13.
26 Sep and 23 Oct 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Moston Lane, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 4 Jul 2025 at 09:51.
29 Sep and 12 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Mill Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 14:11.
29 Sep and 3 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Permanent reinstatement on Henry Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2025 at 13:17.
29 Sep and 3 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Permanent reinstatement on Henry Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 12:28.
29 Sep and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Thornhill Road, Droylsden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 21:30.
29 Sep and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Moorside Street, Droylsden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 21:30.
29 Sep 2025 and 28 Feb 2027
Salford City Council are proposing to carry out Works for road purposes on Tully Street South, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 15 Sep 2025 at 13:15.
29 Sep and 3 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Bennett Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Jul 2025 at 11:14.
29 Sep and 12 Oct 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Manchester Road, Mossley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Sep 2025 at 14:26.
29 Sep 2025 and 20 Sep 2026
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Dunbar Street, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 20 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 15 Aug 2025 at 10:38.
29 Sep and 30 Oct 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sholver Lane, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 19 Aug 2025 at 10:55.
29 Sep 2025 and 30 Jun 2026
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Middleton Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 30 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 15 Jul 2025 at 13:12.
29 Sep 2025 and 30 Jun 2026
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Oldham Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 30 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 15 Jul 2025 at 13:12.
29 Sep 2025 and 30 Jun 2026
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High Barn Street, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 30 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 15 Jul 2025 at 13:10.
29 Sep 2025 and 30 Jun 2026
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rochdale Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 30 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 15 Jul 2025 at 13:12.
30 Sep and 31 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Queens Road, Manchester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Jul 2025 at 11:16.
1 and 3 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Cleveland Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Jul 2025 at 09:50.
1 and 29 Oct 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Marlborough Street, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2025 at 13:26.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Mount Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:03.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Stanley Grove, Longsight, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:11.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Kirkmanshulme Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:02.
6 and 8 Oct 2025
Telefonica UK were proposing to carry out Utility asset works on Egerton Street, Denton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 20 Aug 2025 at 14:04.
6 and 12 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Fastnet Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 14:10.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Fairfield Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:09.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Sheffield Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:10.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Boad Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:04.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Store Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:11.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Kelvin Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:10.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Back Turner Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:09.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Ludgate Hill, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:10.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Simeon Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:10.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Rochdale Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:10.
6 and 24 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Grimshaw Lane, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 Jul 2025 at 11:34.
6 and 31 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Lightbowne Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 6 May 2025 at 09:10.
6 and 10 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Joshua Lane, Middleton Junction & Moorclose, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 13 May 2025 at 12:25.
6 and 10 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Joshua Lane, Middleton Junction & Moorclose, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 May 2025 at 12:44.
8 and 21 Oct 2025
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Cromford Street, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 16 Jul 2025 at 16:19.
8 and 24 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Royton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 09:55.
9 Oct and 6 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Park Road, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2025 at 09:02.
9 Oct and 6 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Park Road, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 10:41.
9 Oct and 6 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Tame Street, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2025 at 09:01.
9 Oct and 6 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Tame Street, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 10:41.
9 Oct and 6 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Clarence Street, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2025 at 09:02.
9 Oct and 6 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Clarence Street, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 10:41.
10 and 17 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Queens Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 14:12.
13 and 19 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Mayton Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 14:10.
13 and 19 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Herne Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 14:10.
13 and 24 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Quickedge Road, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 07:30.
13 and 24 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Quickedge Road, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 14:46.
15 and 29 Oct 2025
Rochdale Borough Council are proposing to carry out Section 50 on Manchester Old Road, Rhodes, Middleton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Rochdale Borough Council on 2 Sep 2025 at 15:10.
15 and 29 Oct 2025
Rochdale Borough Council are proposing to carry out Section 50 on Manchester Old Road, Rhodes, Middleton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Rochdale Borough Council on 2 Sep 2025 at 15:11.
17 Oct and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Remedial works on Queens Road, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Sep 2025 at 16:19.
18 Oct and 3 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Kirkmanshulme Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 11:29.
20 and 22 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Gorse Hall Road, Dukinfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Jul 2025 at 11:58.
20 and 26 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Herne Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 14:10.
20 and 26 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Thames Close, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 14:11.
20 and 24 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Kearsley Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:25.
20 and 24 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Birwood Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:26.
20 Oct and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Burnley Street, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 11:30.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Hilton Fold Lane, Middleton East, Middleton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 12:15.
20 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Shaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 13:45.
24 Oct and 9 Dec 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Turf Lane, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 9 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Jun 2025 at 12:42.
27 and 29 Oct 2025
Telefonica UK are proposing to carry out Utility asset works on Egerton Street, Denton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 26 Aug 2025 at 10:06.
27 and 29 Oct 2025
Telefonica UK are proposing to carry out Utility asset works on Egerton Street, Denton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 4 Sep 2025 at 15:30.
27 and 29 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Guide Lane, Audenshaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Jul 2025 at 14:13.
27 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Lumb Lane, Audenshaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 11:57.
27 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Lumb Lane, Audenshaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 11:15.
27 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Newcliffe Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 11:33.
27 Oct and 14 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Pevensey Walk, Chadderton.
These works are categorised as Major.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 11:09.
27 Oct and 14 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Ferring Walk, Chadderton.
These works are categorised as Major.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 11:02.
27 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Hanson Street, Middleton East, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 11:20.
27 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Hanson Street, Middleton East, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Aug 2025 at 12:23.
27 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Hanson Street, Middleton East, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 08:47.
29 Oct and 19 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Ryder Brow Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 09:06.
30 Oct and 5 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Remedial works on Rock Street, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2025 at 11:54.
31 Oct and 13 Nov 2025
Electricity North West (NorWeb) were proposing to carry out New service connection on Whitworth Street East, Manchester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 October 2025 and run through until 13 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Aug 2025 at 15:48.
31 Oct and 13 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Whitworth Street East, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2025 at 13:19.
1 and 29 Nov 2025
Tameside Metropolitan Borough Council are proposing to carry out Highway improvement works on Darnton Road, Stalybridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 15 Sep 2025 at 16:06.
3 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Goredale Avenue, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 15:16.
3 Nov 2025 and 31 May 2026
Manchester City Council are proposing to carry out Highway improvement works on Echo Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 31 May 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 28 May 2025 at 13:18.
3 Nov 2025 and 31 May 2026
Manchester City Council are proposing to carry out Highway improvement works on Granby Row, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 31 May 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 28 May 2025 at 13:27.
3 and 5 Nov 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Lower Wharf Street, Ashton-under-lyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Sep 2025 at 09:46.
3 and 7 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Bullcote Lane, Royton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 7 Aug 2025 at 15:38.
5 and 26 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Ryder Brow Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 15:16.
5 and 26 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Hart Street, Droylsden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 11:34.
8 and 10 Nov 2025
Telefonica UK are proposing to carry out Utility asset works on Egerton Street, Denton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 4 Sep 2025 at 12:07.
10 Nov and 5 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Chadderton Way, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 14:50.
10 and 24 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Ferney Field Road, Chadderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 11:29.
10 Nov 2025 and 9 Nov 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Sheepfoot Lane, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 9 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 May 2025 at 10:48.
14 and 20 Nov 2025
Electricity North West (NorWeb) were proposing to carry out New service connection on Prescot Road, Manchester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 November 2025 and run through until 20 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 22 Aug 2025 at 10:06.
14 and 20 Nov 2025
Electricity North West (NorWeb) were proposing to carry out New service connection on Prescot Road, Manchester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 November 2025 and run through until 20 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2025 at 11:45.
17 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Hunt Lane, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 09:43.
19 Nov 2025 and 19 Jan 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Arlies Lane, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 19 January 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 14:23.
19 Nov 2025 and 19 Jan 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Luzley Road, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 19 January 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 14:23.
19 Nov 2025 and 19 Jan 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Luzley Road, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 19 January 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 14:24.
24 Nov and 5 Dec 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Seymour Road South, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 13:25.
24 Nov and 10 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Canberra Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 13:35.
24 and 26 Nov 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Egerton Street, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Sep 2025 at 12:06.
24 and 28 Nov 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Breeze Hill Road, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 1 Sep 2025 at 09:27.
24 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Deal Walk, Chadderton.
These works are categorised as Major.
The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 09:49.
2 and 8 Dec 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Greenwood Avenue, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 09:41.
3 and 10 Dec 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Prescot Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2025 at 14:17.
3 Dec 2025 and 19 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Hillside Avenue, Shaw.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 10:56.
8 and 24 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Schofield Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 13:31.
8 and 23 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Eastern By Pass, Beswick, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 13:39.
10 and 19 Dec 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bradford Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Sep 2025 at 13:50.
Roadworks Map near to Tenby Road, OLDHAM, OL8 4ST (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Tenby Road, OLDHAM, OL8 4ST (25 Events)
(Scheduled Dates)
(miles)
(Scheduled: 29 Aug 2025 - 24 Sep 2025)
(Scheduled: 10 Aug 2025 - 5 Jan 2026)
(Scheduled: 18 Sep 2025 - 24 Sep 2025)
(Scheduled: 16 Sep 2025 - 18 Sep 2025)
(Scheduled: 17 Sep 2025 - 19 Sep 2025)
(Scheduled: 16 Sep 2025 - 18 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.