ROADWORKS SUMMARY
Oaken Clough Terrace, ASHTON-UNDER-LYNE, OL7 9NY
Introduction

View current and future planned roadworks and road closures for Oaken Clough Terrace, OL7 9NY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Oaken Clough Terrace, ASHTON-UNDER-LYNE, OL7 9NY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Oaken Clough Terrace are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
31 Oct 2025
Oldham Metropolitan Borough Council are carrying out Section 50 on Southgate Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 January 2022 at 09:31 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 31 Mar 2025 at 11:36.
30 Jun 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Fountain Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 2 Jun 2025 at 14:00.
30 Jun 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on New Radcliffe Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 2 Jun 2025 at 14:01.
15 Nov 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Place, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:30 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:44.
2 Aug 2024 and 2 Aug 2025
Manchester City Council are proposing to carry out Highway improvement works on Mount Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2024 and could run through until 2 August 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 20 May 2024 at 09:08.
1 Sep 2024 and 1 Apr 2026
Tameside Metropolitan Borough Council are proposing to carry out Section 50 on Fleet Street, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 April 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 20 May 2024 at 12:10.
7 Oct 2024 and 25 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Jul 2024 at 07:22.
4 Nov 2024 and 1 Dec 2025
National Highways are proposing to carry out Highway improvement works on Roe Cross Road, Mottram.
These works are categorised as Major.
The works will start on or after 4 November 2024 and could run through until 1 December 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 7 Apr 2025 at 08:03.
11 Nov 2024 and 1 Sep 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Sheepfoot Lane, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Aug 2024 at 14:42.
2 Jan and 6 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Moston Lane East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.
2 Jan and 6 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Broadway, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.
6 Jan 2025 and 5 Jan 2026
Manchester City Council are proposing to carry out Highway improvement works on Old Mill Street, Manchester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 5 January 2026. The works will impact the footway, carriageway, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Manchester City Council on 9 May 2024 at 17:18.
6 Jan and 25 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Turner Lane, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Aug 2024 at 13:13.
Sunday
Manchester City Council are carrying out Highway improvement works on Victoria Avenue East, Manchester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 09:30 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 31 Mar 2025 at 10:05.
Sunday
Manchester City Council are carrying out Highway improvement works on Hinchley Road, Manchester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 09:30 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 31 Mar 2025 at 10:08.
27 Jan and 27 Oct 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:00.
24 Jul 2025
Oldham Metropolitan Borough Council are carrying out Section 50 on Bankfield Drive, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 09:00 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 7 Apr 2025 at 14:26.
25 Jul 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Curzon Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 09:00 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Mar 2025 at 11:48.
8 Aug 2025
Manchester City Council are carrying out Section 58 on Jersey Street, Manchester.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 08:00 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 19 May 2025 at 15:39.
1 Apr and 1 Oct 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Turner Lane, Ashton-under-lyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:01.
25 Jun 2025
Cadent Gas are carrying out Utility asset works on Broadoak Road, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 08:55 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 09:26.
14 Jul 2025
Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Monsall Road, Manchester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2025 at 07:00 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 Apr 2025 at 08:15.
Tomorrow
Tameside Metropolitan Borough Council are proposing to carry out Remedial works on Talbot Road, Hyde.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 9 Apr 2025 at 08:45.
5 May and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Lumb Lane, Audenshaw.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 11:09.
6 May and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Middleton Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 4 Feb 2025 at 15:36.
6 May and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Oldham Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 4 Feb 2025 at 15:36.
6 May and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High Barn Street, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 4 Feb 2025 at 15:31.
6 May and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rochdale Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 4 Feb 2025 at 15:14.
12 May and 23 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Highway repair and maintenance works on A57 J M67/a57 Roundabout, Tameside.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Apr 2025 at 10:15.
Friday
Cadent Gas are carrying out Utility asset works on Woodlands Road, Stalybridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 May 2025 at 10:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 08:46.
7 Jul 2025
Cadent Gas are carrying out Utility asset works on Mottram Road, Stalybridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 May 2025 at 10:00 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 10:40.
16 Jun 2025
Tameside Metropolitan Borough Council are carrying out Remedial works on Talbot Road, Hyde.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 May 2025 at 08:30 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 13 May 2025 at 09:35.
Friday
Cadent Gas are carrying out Utility asset works on Broadbent Avenue, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 May 2025 at 10:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 08:44.
11 Jun 2025
Cadent Gas are carrying out Utility repair and maintenance works on Holden Fold Lane, Royton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 09:05 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:17.
19 May and 13 Jun 2025
Tameside Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Road, Mottram.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 9 May 2025 at 14:44.
23 May and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Broadoak Road, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 11:51.
26 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Smallshaw Lane, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 10:11.
26 May and 13 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Connery Crescent, Ashton-under-lyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:23.
26 May and 13 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Oakfold Avenue, Ashton-under-lyne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:24.
27 May and 15 Jun 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Gorton Lane, Manchester.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 15 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 May 2025 at 09:20.
27 May and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Connery Crescent, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 10:09.
27 May and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Oakfold Avenue, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 10:10.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Stock Lane, Chadderton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:20 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 12:37.
19 Jun 2025
Cadent Gas are carrying out Utility asset works on Burnside, Stalybridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 12:30 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 13:57.
Monday
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Prout Street, Manchester.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 11:02 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 May 2025 at 16:10.
Tomorrow
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Foxwood Drive, Mossley.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 May 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 May 2025 at 13:57.
29 May and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on White Moss Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 14:32.
Friday
Manchester City Council are proposing to carry out Highway repair and maintenance works on Whitworth Street East, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 30 May 2025 at 09:07.
30 May and 20 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Ripponden Road, Oldham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 May 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 09:46.
30 May and 20 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Watersheddings Street, Oldham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 May 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 09:33.
30 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath From Birchinlee Avenue To Front Of 18 - 28 Birchinlee Avenue, Royton.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 30 May 2025 and could run through until 20 June 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 14:47.
2 and 18 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mottram Old Road, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 08:45.
Friday
Tameside Metropolitan Borough Council are carrying out roadworks on Bayley Street, Stalybridge.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 29 May 2025 at 13:11.
2 and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Addison Avenue, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:13.
2 and 17 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Newcliffe Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 14:30.
2 and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Avenue East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 14:31.
Monday
Electricity North West (NorWeb) are proposing to carry out New service connection on Pendle Road, Denton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Mar 2025 at 15:16.
Monday
Electricity North West (NorWeb) are proposing to carry out New service connection on Pendle Road, Denton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 21 May 2025 at 15:59.
3 Jun and 15 Aug 2025
Manchester City Council are proposing to carry out Section 58 on Jersey Street, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 6 Mar 2025 at 19:55.
3 and 20 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Laurel Avenue, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jun 2025 at 10:51.
Monday
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Mill Street, Manchester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 May 2025 at 13:22.
5 Jun and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Mottram Road, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 13:44.
8 and 15 Jun 2025
Manchester City Council are proposing to carry out Highway repair and maintenance works on West Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 30 May 2025 at 09:03.
9 and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Burnside, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 13:44.
9 Jun and 28 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Sawley Road, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 28 May 2025 at 11:14.
9 and 13 Jun 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Elmsdale Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 6 Mar 2025 at 19:55.
9 and 13 Jun 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Elmsdale Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 30 May 2025 at 14:25.
9 Jun and 15 Aug 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Saint Marys Way, Oldham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 30 May 2025 at 09:19.
9 Jun and 15 Aug 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Saint Marys Way, Oldham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 30 May 2025 at 12:12.
9 and 24 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath From Birchinlee Avenue To Front Of 18 - 28 Birchinlee Avenue, Royton.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:45.
11 Jun and 11 Jul 2025
Tameside Metropolitan Borough Council are proposing to carry out Highway improvement works on Underwood Road, Hyde.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 28 May 2025 at 14:08.
11 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Droylsden Road, Audenshaw.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:08.
16 Jun and 6 Jul 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Gardner Street, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jun 2025 at 11:50.
16 Jun and 2 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Mottram Old Road, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 13:44.
16 Jun and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Medlock Street, Droylsden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 10:18.
16 Jun and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Medlock Street, Droylsden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:27.
20 and 26 Jun 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Molyneux Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Jun 2025 at 09:06.
23 Jun and 8 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Newcliffe Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 09:05.
23 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Avenue East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 09:20.
23 Jun and 17 Jul 2025
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Greengate Street, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 21 Mar 2025 at 13:01.
25 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Jubilee Terrace, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 12:13.
30 Jun and 20 Jul 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Textile Street, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 20 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jun 2025 at 11:56.
30 Jun and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Moston Lane East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Manchester City Council on 19 May 2025 at 15:39.
30 Jun and 26 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Broadway, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Manchester City Council on 19 May 2025 at 15:38.
30 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Ladhill Lane, Greenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 12:19.
30 Jun and 21 Jul 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Boarshaw Road, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rochdale Borough Council on 28 May 2025 at 08:40.
30 Jun and 21 Jul 2025
Rochdale Borough Council are proposing to carry out Highway improvement works on Boarshaw Road, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rochdale Borough Council on 28 May 2025 at 13:57.
2 and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Royton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 09:46.
7 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Mount Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 14:32.
7 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Kirkmanshulme Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 15:00.
7 Jul and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Redgate Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 15:01.
9 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Dale Road, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 11:47.
9 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Dale Road, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 10:32.
9 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Jubilee Road, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 11:48.
9 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Jubilee Road, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 10:34.
12 and 14 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Berry Brow, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 28 Mar 2025 at 10:09.
14 Jul and 3 Aug 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Abbey Hey Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 31 Mar 2025 at 14:50.
14 Jul and 22 Aug 2025
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Waterloo Street, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 21 Mar 2025 at 15:01.
15 and 17 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Preston Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Apr 2025 at 14:44.
15 and 21 Jul 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Chelford Close, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 1 Apr 2025 at 10:53.
19 and 21 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Berry Brow, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 28 Mar 2025 at 09:52.
21 and 27 Jul 2025
Stockport Metropolitan Borough Council are proposing to carry out Highway improvement works on Windmill Lane, North Reddish, Stockport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Stockport Metropolitan Borough Council on 12 May 2025 at 13:52.
21 and 29 Jul 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Matley Lane, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Mar 2025 at 14:29.
21 and 29 Jul 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Matley Lane, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 May 2025 at 08:05.
21 Jul and 15 Aug 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Hendham Vale, Manchester.
These works are categorised as Major.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 24 Apr 2025 at 13:34.
21 Jul and 15 Aug 2025
Nexfibre Networks Limited were proposing to carry out Utility asset works on Hendham Vale, Manchester.
These works were categorised as Major.
The works were originally planned to start 21 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 9 May 2025 at 14:51.
21 Jul and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Nuthurst Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 15:26.
21 Jul and 15 Aug 2025
Rochdale Borough Council are proposing to carry out Highway repair and maintenance works on Mount Road, Alkrington East, Middleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Rochdale Borough Council on 19 Feb 2025 at 10:49.
21 Jul and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Mills Hill Road, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 13:40.
21 Jul and 17 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 10:47.
21 Jul and 17 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 12:40.
21 Jul and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Middleton Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 9 May 2025 at 15:34.
21 Jul and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Oldham Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 9 May 2025 at 15:27.
21 Jul and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High Barn Street, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 9 May 2025 at 15:26.
21 Jul and 7 Dec 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rochdale Road, Royton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 6 May 2025 at 09:20.
25 and 31 Jul 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Yew Tree Road, Denton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Apr 2025 at 12:53.
28 Jul and 16 Nov 2025
Manchester City Council are proposing to carry out Highway improvement works on Sawley Road, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 29 Apr 2025 at 09:06.
28 Jul and 5 Aug 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Arthurs Lane, Greenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Apr 2025 at 15:10.
30 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Royton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 10:51.
1 and 22 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Hilton Fold Lane, Middleton East, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 May 2025 at 09:13.
1 and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Green Lane, Slattocks & Boarshaw, Middleton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 May 2025 at 09:00.
2 Aug and 14 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Hollinwood Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2025 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:25.
4 and 8 Aug 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Molyneux Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 May 2025 at 15:53.
4 and 15 Aug 2025
Electricity North West (NorWeb) were proposing to carry out New service connection on Roxburgh Street, Manchester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Apr 2025 at 10:08.
4 and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Daisy Bank Icw Culcheth Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:24.
4 and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Culcheth Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:24.
5 and 12 Aug 2025
Manchester City Council are proposing to carry out Highway improvement works on Thorp Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 24 Apr 2025 at 13:45.
5 and 12 Aug 2025
Manchester City Council are proposing to carry out Highway improvement works on Lightbowne Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 24 Apr 2025 at 13:56.
7 and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Royton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 11:07.
11 and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Northmoor Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 15:01.
11 Aug and 19 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Kirkmanshulme Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 15:01.
15 Aug and 19 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Middleton East, Middleton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 11:55.
16 Aug and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Mills Hill Road, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 14:35.
16 Aug and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 14:34.
18 Aug and 2 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Albert Grove, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 15:02.
18 Aug and 2 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Northmoor Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 14:07.
18 Aug and 19 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Grey Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:30.
18 Aug and 19 Sep 2025
Manchester City Council are proposing to carry out Highway improvement works on Coverdale Crescent, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 23 Apr 2025 at 08:33.
18 and 22 Aug 2025
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Henshaw Street, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 10:57.
20 Aug and 12 Sep 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Hill, Bredbury, Stockport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 May 2025 at 10:22.
20 Aug and 8 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Laurel Avenue, Chadderton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 May 2025 at 12:02.
25 Aug and 9 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Pottery Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 15:02.
28 Aug and 4 Sep 2025
Manchester City Council are proposing to carry out Highway repair and maintenance works on Whitworth Street East, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 28 May 2025 at 15:04.
28 Aug and 4 Sep 2025
Manchester City Council are proposing to carry out Highway repair and maintenance works on West Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 28 May 2025 at 14:54.
Roadworks Map near to Oaken Clough Terrace, ASHTON-UNDER-LYNE, OL7 9NY (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Oaken Clough Terrace, ASHTON-UNDER-LYNE, OL7 9NY (35 Events)
(Scheduled Dates)
(miles)
(Scheduled: 29 May 2025 - 4 Jun 2025)
(Scheduled: 30 May 2025 - 9 Jun 2025)
(Scheduled: 3 Jun 2025 - 9 Jun 2025)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.