ROADWORKS SUMMARY
Kings Road, ASHTON-UNDER-LYNE, OL6 9EG
Introduction
View current and future planned roadworks and road closures for Kings Road, OL6 9EG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Kings Road, ASHTON-UNDER-LYNE, OL6 9EG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kings Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Apr 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on London Road, Oldham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2020 at 14:30 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 7 May 2024 at 07:37.
31 Jan 2025
Oldham Metropolitan Borough Council are carrying out Section 50 on Southgate Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 January 2022 at 09:31 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 8 Aug 2023 at 10:14.
26 Feb 2025
National Highways are carrying out Highway improvement works on Hyde Road, Denton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 April 2023 at 08:00 and could run through until 26 February 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by National Highways on 24 Oct 2023 at 06:32.
26 Feb 2025
National Highways are carrying out Highway improvement works on St Annes Road, Denton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 January 2023 at 09:00 and could run through until 26 February 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by National Highways on 24 Oct 2023 at 07:19.
24 Dec 2024
Oldham Metropolitan Borough Council are carrying out Section 50 on Ascroft Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 March 2023 at 09:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 17 Jul 2023 at 09:47.
29 May 2025
Tameside Metropolitan Borough Council are carrying out Section 50 on Broomgrove Lane, Denton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2023 at 09:13 and could run through until 29 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 1 Jun 2023 at 14:30.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Bank Bridge Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Briscoe Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.
8 Jan 2024 and 30 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Ten Acres Lane, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:21.
30 Apr 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Priest Hill, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:44.
30 Apr 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Fountain Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:42.
30 Apr 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on New Radcliffe Street, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:43.
15 Nov 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Place, Oldham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:30 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:44.
13 Mar 2025
Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Deanshut Road, Oldham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 July 2024 at 09:30 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 30 Jul 2024 at 10:17.
24 Dec 2024
Cadent Gas are carrying out Utility asset works on Ashworth Lane, Mottram.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 07:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 16:03.
1 Sep 2024 and 1 Apr 2026
Tameside Metropolitan Borough Council are proposing to carry out Section 50 on Fleet Street, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 April 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 20 May 2024 at 12:10.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on High Street, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Yorkshire Street, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:42.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Church Terrace, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Church Street, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:42.
30 Sep 2024 and 31 Jan 2025
Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Curzon Street, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.
24 Dec 2024
Cadent Gas are carrying out Utility asset works on Carrbrook Crescent, Stalybridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 October 2024 at 10:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 13:15.
7 Oct 2024 and 25 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Jul 2024 at 07:22.
Monday
Tameside Metropolitan Borough Council are carrying out Highway repair and maintenance works on Clarence Street, Stalybridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 10:45 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 20 Nov 2024 at 09:20.
14 Oct and 9 Dec 2024
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Tuns Road, Oldham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 9 Oct 2024 at 08:46.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Buckton Vale Road, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 10:22.
Tomorrow
Cadent Gas were proposing to carry out Utility asset works on Fold Crescent, Stalybridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 14:42.
21 Oct and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ashworth Street, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 14:18.
Tuesday
Electricity North West (NorWeb) are carrying out Diversionary works on Bank Street, Beswick, Manchester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 08:59 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 24 Oct 2024 at 10:56.
Monday
Cadent Gas are proposing to carry out Utility asset works on Ridge Hill Lane, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 13:30.
24 Oct 2024 and 2 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Springs Lane, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 13:28.
Monday
Cadent Gas are proposing to carry out Utility asset works on Fold Crescent, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 09:36.
30 Oct and 29 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Dukinfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:27.
30 Oct and 9 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Ridge Hill Lane, Stalybridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 October 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:39.
28 Nov 2024
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Joshua Lane, Middleton Junction & Moorclose, Middleton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 14:00 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Nov 2024 at 10:10.
4 Nov 2024 and 1 May 2025
National Highways are proposing to carry out Highway improvement works on Roe Cross Road, Mottram.
These works are categorised as Major.
The works will start on or after 4 November 2024 and could run through until 1 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by National Highways on 29 Oct 2024 at 11:39.
4 Nov 2024 and 1 May 2025
National Highways are proposing to carry out Highway improvement works on Roe Cross Road, Mottram.
These works are categorised as Major.
The works will start on or after 4 November 2024 and could run through until 1 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by National Highways on 18 Oct 2024 at 12:33.
29 Nov 2024
Energy Assets Networks (formerly Utility Distribution Networks) are carrying out New service connection on Rosary Road, Oldham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 15:45 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 21 Nov 2024 at 07:29.
5 Nov and 3 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Western Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Aug 2024 at 13:48.
5 Nov and 3 Dec 2024
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Western Street, Manchester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2024 and run through until 3 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Oct 2024 at 06:50.
Today
Cadent Gas are proposing to carry out Utility asset works on Footpath 16 Bewley Walk, Manchester.
These works are categorised as Major.
The works will start on or after 5 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 10:05.
Today
Cadent Gas were proposing to carry out Utility asset works on Borrowdale Terrace, Stalybridge.
These works were categorised as Major.
The works were originally planned to start 6 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:40.
7 Nov and 5 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Hugo Street, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 09:45.
11 Dec 2024
Cadent Gas are carrying out Utility asset works on Gray Close, Mottram.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:47 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:06.
11 and 28 Nov 2024
Tameside Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ashton Hill Lane, Droylsden.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 1 Nov 2024 at 15:19.
28 Nov 2024
Tameside Metropolitan Borough Council are carrying out Highway repair and maintenance works on Ashton Hill Lane, Droylsden.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 19 Nov 2024 at 11:48.
29 Nov 2024
Cadent Gas are carrying out Utility asset works on John Heywood Street, Manchester.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 13:53 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 08:24.
Today
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Kew Road, Failsworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 19 Aug 2024 at 08:37.
11 and 29 Nov 2024
Tameside Metropolitan Borough Council are proposing to carry out Section 50 on Stockport Road, Mossley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 7 Nov 2024 at 16:05.
29 Nov 2024
Tameside Metropolitan Borough Council are carrying out Section 50 on Stockport Road, Mossley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 21 Nov 2024 at 09:00.
Today
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Drury Lane, Chadderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 19 Aug 2024 at 08:36.
11 Nov 2024 and 1 Sep 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Sheepfoot Lane, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Aug 2024 at 14:42.
3 Dec 2024
Cadent Gas are carrying out Utility asset works on Castle Lane, Stalybridge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 08:37 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:08.
13 and 29 Nov 2024
Cadent Gas were proposing to carry out Utility asset works on Foundry Street, Dukinfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:48.
13 Nov and 4 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Springs Lane, Stalybridge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2024 and run through until 4 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:45.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Tunstead Lane, Greenfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 11:44 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:02.
18 Nov and 11 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Carr Rise, Carrbrook, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 13:58.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Wall Hill Road, Dobcross.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 16:15 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:15.
20 Nov and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Mottram Road, Stalybridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:07.
Tuesday
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Alt Hill Lane, Ashton-under-lyne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 01:47 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 09:11.
Tuesday
Manchester City Council are proposing to carry out Highway improvement works on Cornwall Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Aug 2024 at 09:21.
Tuesday
Manchester City Council are carrying out Highway improvement works on Cornwall Street, Manchester.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 08:00 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 21 Nov 2024 at 08:39.
25 Nov and 16 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Western Street, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Nov 2024 at 15:47.
26 Nov and 2 Dec 2024
Electricity North West (NorWeb) are proposing to carry out New service connection on Guildford Drive, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 16:31.
2 and 5 Dec 2024
Manchester City Council are proposing to carry out Highway improvement works on Parkstone Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 13 Nov 2024 at 14:58.
3 and 6 Dec 2024
Manchester City Council are proposing to carry out Highway improvement works on Green Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 13 Nov 2024 at 14:57.
3 and 9 Dec 2024
Electricity North West (NorWeb) are proposing to carry out New service connection on Freeman Avenue, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 13 Sep 2024 at 09:47.
5 Dec 2024 and 9 Apr 2025
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Tuns Road, Oldham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Nov 2024 at 14:09.
9 and 12 Dec 2024
Manchester City Council are proposing to carry out Highway improvement works on Parkstone Avenue, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Aug 2024 at 09:12.
9 and 13 Dec 2024
Electricity North West (NorWeb) are proposing to carry out New service connection on Taylor Street, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 21 Nov 2024 at 08:58.
9 and 18 Dec 2024
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Carrhill Road, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2024 at 16:19.
9 and 11 Dec 2024
Electricity North West (NorWeb) were proposing to carry out New service connection on Chadderton Way, Oldham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2024 at 18:32.
10 and 13 Dec 2024
Manchester City Council are proposing to carry out Highway improvement works on Green Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 2 Aug 2024 at 09:21.
16 and 18 Dec 2024
Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Lees Road, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 1 Oct 2024 at 12:53.
16 and 31 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ladhill Lane, Greenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:30.
16 and 31 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ladhill Lane, Greenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:33.
16 and 26 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Ladhill Lane, Greenfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 26 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 08:31.
16 and 19 Dec 2024
Cadent Gas are proposing to carry out New service connection on Retiro Street, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 14:40.
16 and 19 Dec 2024
Cadent Gas are proposing to carry out New service connection on Retiro Street, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:58.
19 Dec 2024 and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Cross Street, Hyde.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 11:38.
1 and 8 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Guildford Drive, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Nov 2024 at 09:18.
2 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pottinger Street, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:44.
2 Jan and 6 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Moston Lane East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.
2 Jan and 6 Oct 2025
Manchester City Council are proposing to carry out Highway improvement works on Broadway, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.
2 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Oaklands Road, Grasscroft.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 14:50.
2 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Grasscroft.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 14:51.
3 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Culcheth Lane, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 09:22.
6 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Pottinger Street, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:18.
6 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Crowthorn Road, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:18.
6 and 26 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Union Street, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Sep 2024 at 16:30.
6 Jan and 25 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Turner Lane, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Aug 2024 at 13:13.
6 and 9 Jan 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Droylsden Road, Manchester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Nov 2024 at 16:25.
6 Jan and 9 Apr 2025
Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Bankfield Drive, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Nov 2024 at 13:36.
6 Jan and 9 Mar 2025
Manchester City Council are proposing to carry out Highway improvement works on Victoria Avenue East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 14 Nov 2024 at 09:44.
6 Jan and 9 Mar 2025
Manchester City Council are proposing to carry out Highway improvement works on Hinchley Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 14 Nov 2024 at 09:44.
6 Jan and 14 Feb 2025
Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Oldham Way, Oldham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oldham Metropolitan Borough Council on 29 Oct 2024 at 08:29.
8 and 22 Jan 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Bank Street, Hadfield, Glossop.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 12:09.
15 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Crowthorn Road, Ashton-under-lyne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:44.
15 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Castle Lane, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:08.
15 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Ashton Road, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:24.
15 Jan and 10 Sep 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Sheepfoot Lane, Oldham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Aug 2024 at 12:49.
20 and 24 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Harrop Edge Road, Mottram.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 21 Nov 2024 at 10:40.
22 Jan and 2 Feb 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Edge Lane, Mottram.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 21 Nov 2024 at 10:45.
22 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mottram Road, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 10:35.
22 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Carr Rise, Carrbrook, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:10.
22 Jan and 6 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oaklands Road, Grasscroft.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:42.
22 Jan and 6 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Grasscroft.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:28.
23 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Huddersfield Road, Mossley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 15:30.
23 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Moorlands Drive, Mossley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 16:00.
24 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roaches Way, Mossley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:00.
27 Jan and 27 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 15:31.
27 and 31 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Spring Bank Lane, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:58.
28 and 30 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Hanover Street, Mossley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Nov 2024 at 14:10.
29 Jan and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Nuthurst Road, Manchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:30.
29 Jan and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Moston Lane, Manchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:30.
29 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Huddersfield Road, Mossley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:30.
31 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Buckton Vale Road, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 14:00.
3 Feb and 21 Mar 2025
Tameside Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tame Street, Stalybridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Tameside Metropolitan Borough Council on 25 Oct 2024 at 11:05.
3 Feb and 6 Apr 2025
Manchester City Council are proposing to carry out Highway improvement works on Victoria Avenue East, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Manchester City Council on 5 Nov 2024 at 10:53.
3 Feb and 6 Apr 2025
Manchester City Council are proposing to carry out Highway improvement works on Hinchley Road, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Manchester City Council on 5 Nov 2024 at 10:53.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on John Heywood Street, Manchester.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:27.
10 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wellington Road, Ashton-under-lyne.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:10.
10 Feb and 12 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Ashton-under-lyne.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:10.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ashton Road, Oldham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 15:04.
12 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ridge Hill Lane, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:00.
12 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Arlies Lane, Stalybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:30.
15 and 23 Feb 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Clarence Street, Stalybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 21 Nov 2024 at 08:55.
18 Feb and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on A57 From J A628/start Of Dualling To J A6018/end Of Dualling W, Tameside.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 07:32.
Roadworks Map near to Kings Road, ASHTON-UNDER-LYNE, OL6 9EG
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Kings Road, ASHTON-UNDER-LYNE, OL6 9EG (42 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
(Scheduled: 20 Nov 2024 - 26 Nov 2024)
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.