ROADWORKS SUMMARY
Lower Alt Hill, ASHTON-UNDER-LYNE, OL6 8AB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lower Alt Hill, OL6 8AB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lower Alt Hill, ASHTON-UNDER-LYNE, OL6 8AB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lower Alt Hill are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oldham Metropolitan Borough Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
London Road

Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on London Road, Oldham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2020 at 14:30 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 7 May 2024 at 07:37.

Oldham Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Southgate Street

Oldham Metropolitan Borough Council are carrying out Section 50 on Southgate Street, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2022 at 09:31 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 8 Aug 2023 at 10:14.

National Highways logo
LONG TERM
Until
26 Feb 2025
Details
View Map
Share
Follow
Hyde Road

National Highways are carrying out Highway improvement works on Hyde Road, Denton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2023 at 08:00 and could run through until 26 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by National Highways on 24 Oct 2023 at 06:32.

National Highways logo
LONG TERM
Until
26 Feb 2025
Details
View Map
Share
Follow
St Annes Road

National Highways are carrying out Highway improvement works on St Annes Road, Denton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 January 2023 at 09:00 and could run through until 26 February 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by National Highways on 24 Oct 2023 at 07:19.

Oldham Metropolitan Borough Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Ascroft Street

Oldham Metropolitan Borough Council are carrying out Section 50 on Ascroft Street, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2023 at 09:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 17 Jul 2023 at 09:47.

Tameside Metropolitan Borough Council logo
LONG TERM
Until
29 May 2025
Details
View Map
Share
Follow
Broomgrove Lane

Tameside Metropolitan Borough Council are carrying out Section 50 on Broomgrove Lane, Denton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2023 at 09:13 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 1 Jun 2023 at 14:30.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Bank Bridge Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Bank Bridge Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Briscoe Lane

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Briscoe Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Ten Acres Lane

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Ten Acres Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:21.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Grimshaw Lane

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Grimshaw Lane, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Oldham Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Oldham Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Lathbury Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Lathbury Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Monsall Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Monsall Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Aug 2023 at 10:20.

Oldham Metropolitan Borough Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Priest Hill

Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Priest Hill, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:44.

Oldham Metropolitan Borough Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Fountain Street

Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Fountain Street, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:42.

Oldham Metropolitan Borough Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
New Radcliffe Street

Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on New Radcliffe Street, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:00 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:43.

Oldham Metropolitan Borough Council logo
LONG TERM
Until
15 Nov 2025
Details
View Map
Share
Follow
Market Place

Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Place, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 09:30 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:44.

Tameside Metropolitan Borough Council logo
LONG TERM
Between
1 Sep 2024 and 1 Apr 2026
Details
View Map
Share
Follow
Fleet Street

Tameside Metropolitan Borough Council are proposing to carry out Section 50 on Fleet Street, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 20 May 2024 at 12:10.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
High Street

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on High Street, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Yorkshire Street

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Yorkshire Street, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:42.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Church Terrace

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Church Terrace, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Church Street

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Church Street, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:42.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Curzon Street

Oldham Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Curzon Street, Oldham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Oct 2024 at 10:43.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Carrbrook Crescent

Cadent Gas are carrying out Utility asset works on Carrbrook Crescent, Stalybridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 10:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 13:15.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
7 Oct 2024 and 25 Jul 2025
Details
View Map
Share
Follow
Alexandra Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Jul 2024 at 07:22.

Cadent Gas logo
LONG TERM
Between
24 Oct 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Springs Lane

Cadent Gas are proposing to carry out Utility asset works on Springs Lane, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 13:28.

National Highways logo
LONG TERM
Between
4 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Roe Cross Road

National Highways are proposing to carry out Highway improvement works on Roe Cross Road, Mottram.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 1 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 29 Oct 2024 at 11:39.

National Highways logo
LONG TERM
Between
4 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Roe Cross Road

National Highways are proposing to carry out Highway improvement works on Roe Cross Road, Mottram.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 1 May 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 18 Oct 2024 at 12:33.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
11 Nov 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Sheepfoot Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Sheepfoot Lane, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Aug 2024 at 14:42.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Mottram Road

Cadent Gas were proposing to carry out Utility asset works on Mottram Road, Stalybridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:07.

United Utilities Water (formerly North West Water) logo
Finishing
Friday
Details
View Map
Share
Follow
Western Street

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Western Street, Manchester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 12:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 16:15.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Town Lane

Cadent Gas are carrying out Utility repair and maintenance works on Town Lane, Dukinfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 16:28 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:46.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Rochdale Lane

Cadent Gas are proposing to carry out Utility asset works on Rochdale Lane, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 13:48.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
28 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Vale Drive

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vale Drive, Oldham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 25 Nov 2024 at 13:42.

Oldham Metropolitan Borough Council logo
LONG TERM
Until
9 Jan 2025
Details
View Map
Share
Follow
Vale Drive

Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Vale Drive, Oldham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 09:30 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 2 Dec 2024 at 13:41.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are carrying out Utility repair and maintenance works on Manchester Road, Hyde.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 December 2024 at 18:03 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 12:36.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Shaw Road

Cadent Gas are carrying out Utility repair and maintenance works on Shaw Road, Oldham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 10:45 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 12:40.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Rochdale Lane

Cadent Gas are proposing to carry out Utility asset works on Rochdale Lane, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 17:07.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
5 Dec 2024 and 9 Apr 2025
Details
View Map
Share
Follow
Tuns Road

Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Tuns Road, Oldham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Nov 2024 at 14:09.

Manchester City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Raglan Close

Manchester City Council are proposing to carry out Highway improvement works on Raglan Close, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 10 Sep 2024 at 09:03.

Manchester City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Sledmere Close

Manchester City Council are proposing to carry out Highway improvement works on Sledmere Close, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 10 Sep 2024 at 09:02.

Manchester City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Sledmere Close

Manchester City Council are proposing to carry out Highway improvement works on Sledmere Close, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 10 Sep 2024 at 09:02.

Manchester City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Howarth Close

Manchester City Council are proposing to carry out Highway improvement works on Howarth Close, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 10 Sep 2024 at 09:14.

Electricity North West (NorWeb) logo
Finishing
Today
Details
View Map
Share
Follow
Carrhill Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Carrhill Road, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2024 at 16:19.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Edward Street

Cadent Gas are carrying out Utility repair and maintenance works on Edward Street, Hyde.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 11:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 15:13.

Electricity North West (NorWeb) logo
Finishing
Friday
Details
View Map
Share
Follow
Marguerita Road

Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Marguerita Road, Manchester.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 December 2024 at 00:15 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Dec 2024 at 09:34.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Follow
Lees Road

Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Lees Road, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 1 Oct 2024 at 12:53.

Cadent Gas logo
Between
16 and 31 Dec 2024
Details
View Map
Share
Follow
Ladhill Lane

Cadent Gas are proposing to carry out Utility asset works on Ladhill Lane, Greenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:30.

Cadent Gas logo
Between
16 and 31 Dec 2024
Details
View Map
Share
Follow
Ladhill Lane

Cadent Gas are proposing to carry out Utility asset works on Ladhill Lane, Greenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:33.

Cadent Gas logo
Between
16 and 26 Dec 2024
Details
View Map
Share
Ladhill Lane

Cadent Gas were proposing to carry out Utility asset works on Ladhill Lane, Greenfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 26 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 08:31.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Retiro Street

Cadent Gas are proposing to carry out New service connection on Retiro Street, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 14:40.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Retiro Street

Cadent Gas are proposing to carry out New service connection on Retiro Street, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:58.

Cadent Gas logo
LONG TERM
Between
19 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Cross Street

Cadent Gas are proposing to carry out Utility asset works on Cross Street, Hyde.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 11:38.

Cadent Gas logo
Between
19 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Colindale Avenue

Cadent Gas are proposing to carry out Utility asset works on Colindale Avenue, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 12:28.

Cadent Gas logo
Between
19 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Colindale Avenue

Cadent Gas are proposing to carry out Utility asset works on Colindale Avenue, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:11.

Cadent Gas logo
Between
19 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Amesbury Road

Cadent Gas are proposing to carry out Utility asset works on Amesbury Road, Manchester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 12:28.

Electricity North West (NorWeb) logo
Between
1 and 8 Jan 2025
Details
View Map
Share
Follow
Guildford Drive

Electricity North West (NorWeb) are proposing to carry out New service connection on Guildford Drive, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Nov 2024 at 09:18.

Cadent Gas logo
Between
2 and 16 Jan 2025
Details
View Map
Share
Follow
Buckton Vale Road

Cadent Gas are proposing to carry out Utility asset works on Buckton Vale Road, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 12:22.

Manchester City Council logo
LONG TERM
Between
2 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Moston Lane East

Manchester City Council are proposing to carry out Highway improvement works on Moston Lane East, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.

Manchester City Council logo
LONG TERM
Between
2 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Broadway

Manchester City Council are proposing to carry out Highway improvement works on Broadway, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Manchester City Council on 8 Jul 2024 at 11:37.

Cadent Gas logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Oaklands Road

Cadent Gas are proposing to carry out Utility asset works on Oaklands Road, Grasscroft.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 14:50.

Cadent Gas logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Oldham Road

Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Grasscroft.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 14:51.

Nexfibre Networks Limited logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Lovers Lane

Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Lovers Lane, Grasscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 28 Nov 2024 at 12:49.

Cadent Gas logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Rochdale Road

Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:13.

Cadent Gas logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Rochdale Road

Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:26.

Cadent Gas logo
LONG TERM
Between
2 Jan and 22 Feb 2025
Details
View Map
Share
Follow
George Street

Cadent Gas are proposing to carry out Utility asset works on George Street, Shaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 16:03.

Cadent Gas logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Follow
Culcheth Lane

Cadent Gas are proposing to carry out Utility asset works on Culcheth Lane, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 09:22.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Pottinger Street

Cadent Gas are proposing to carry out Utility asset works on Pottinger Street, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:18.

Cadent Gas logo
Between
6 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Pottinger Street

Cadent Gas are proposing to carry out Utility asset works on Pottinger Street, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 13:18.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Crowthorn Road

Cadent Gas are proposing to carry out Utility asset works on Crowthorn Road, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:18.

United Utilities Water (formerly North West Water) logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Union Street

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Union Street, Ashton-under-lyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 26 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:02.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
6 Jan and 25 Jul 2025
Details
View Map
Share
Follow
Turner Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Turner Lane, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Aug 2024 at 13:13.

Electricity North West (NorWeb) logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Gaskell Street

Electricity North West (NorWeb) are proposing to carry out Remedial works on Gaskell Street, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 14:29.

Cornerstone Telecommunications Infrastructure logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Droylsden Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Droylsden Road, Manchester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Nov 2024 at 16:25.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Nuthurst Road

Cadent Gas are proposing to carry out Utility asset works on Nuthurst Road, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 09:17.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Moston Lane

Cadent Gas are proposing to carry out Utility asset works on Moston Lane, Manchester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 10:00.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 9 Apr 2025
Details
View Map
Share
Follow
Bankfield Drive

Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Bankfield Drive, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Nov 2024 at 13:36.

Manchester City Council logo
LONG TERM
Between
6 Jan and 9 Mar 2025
Details
View Map
Share
Follow
Victoria Avenue East

Manchester City Council are proposing to carry out Highway improvement works on Victoria Avenue East, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 14 Nov 2024 at 09:44.

Manchester City Council logo
LONG TERM
Between
6 Jan and 9 Mar 2025
Details
View Map
Share
Follow
Hinchley Road

Manchester City Council are proposing to carry out Highway improvement works on Hinchley Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 14 Nov 2024 at 09:44.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Oldham Way

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Oldham Way, Oldham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 29 Oct 2024 at 08:29.

Oldham Metropolitan Borough Council logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Delph Lane

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Delph Lane, Delph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 18 Nov 2024 at 10:01.

Oldham Metropolitan Borough Council logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Delph Lane

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Delph Lane, Delph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 18 Nov 2024 at 10:13.

BT logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Roe Cross Road

BT are proposing to carry out Utility repair and maintenance works on Roe Cross Road, Mottram.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Dec 2024 at 16:19.

BT logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Roe Cross Road

BT were proposing to carry out Utility repair and maintenance works on Roe Cross Road, Mottram.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Dec 2024 at 16:29.

BT logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Roe Cross Road

BT are proposing to carry out Utility repair and maintenance works on Roe Cross Road, Mottram.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Dec 2024 at 16:19.

BT logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Roe Cross Road

BT are proposing to carry out Utility repair and maintenance works on Roe Cross Road, Mottram.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Dec 2024 at 14:20.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Beal Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Beal Lane, Shaw.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 15:00.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Beal Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Beal Lane, Shaw.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 08:37.

Cadent Gas logo
LONG TERM
Between
15 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Castle Lane

Cadent Gas are proposing to carry out Utility asset works on Castle Lane, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:08.

Cadent Gas logo
Between
15 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Ashton Road

Cadent Gas are proposing to carry out Utility asset works on Ashton Road, Oldham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:24.

Cadent Gas logo
Between
15 Jan and 14 Feb 2025
Details
View Map
Share
Follow
The Meadows

Cadent Gas are proposing to carry out Utility asset works on The Meadows, Alkrington East, Middleton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 11:26.

Cadent Gas logo
Between
15 Jan and 14 Feb 2025
Details
View Map
Share
Follow
The Meadows

Cadent Gas are proposing to carry out Utility asset works on The Meadows, Alkrington East, Middleton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:01.

Cadent Gas logo
Between
15 and 31 Jan 2025
Details
View Map
Share
Follow
Kingsway

Cadent Gas are proposing to carry out Utility asset works on Kingsway, Alkrington West, Middleton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:00.

Electricity North West (NorWeb) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Harrop Edge Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Harrop Edge Road, Mottram.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Nov 2024 at 10:40.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Oldham Road

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on Oldham Road, Manchester.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 29 Oct 2024 at 11:43.

Manchester City Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Bush Street

Manchester City Council are proposing to carry out Highway improvement works on Bush Street, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:51.

Manchester City Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Sanderson Street

Manchester City Council are proposing to carry out Highway improvement works on Sanderson Street, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:55.

Manchester City Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Aldworth Drive

Manchester City Council are proposing to carry out Highway improvement works on Aldworth Drive, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:50.

Manchester City Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Dalbeattie Street

Manchester City Council are proposing to carry out Highway improvement works on Dalbeattie Street, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:52.

Manchester City Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Lewis Avenue

Manchester City Council are proposing to carry out Highway improvement works on Lewis Avenue, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 30 Sep 2024 at 14:54.

Rochdale Borough Council logo
LONG TERM
Between
20 Jan and 11 May 2025
Details
View Map
Share
Follow
Oldham Road

Rochdale Borough Council are proposing to carry out Highway improvement works on Oldham Road, Middleton East, Middleton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Rochdale Borough Council on 22 Nov 2024 at 09:32.

Electricity North West (NorWeb) logo
Between
22 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Edge Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Edge Lane, Mottram.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Nov 2024 at 10:45.

Cadent Gas logo
LONG TERM
Between
22 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Mottram Road

Cadent Gas are proposing to carry out Utility asset works on Mottram Road, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 10:35.

Cadent Gas logo
Between
22 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Carr Rise

Cadent Gas are proposing to carry out Utility asset works on Carr Rise, Carrbrook, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:10.

Cadent Gas logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Oaklands Road

Cadent Gas are proposing to carry out Utility asset works on Oaklands Road, Grasscroft.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:42.

Cadent Gas logo
Between
22 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Oldham Road

Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Grasscroft.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:28.

Cadent Gas logo
Between
23 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Huddersfield Road

Cadent Gas are proposing to carry out Utility asset works on Huddersfield Road, Mossley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:55.

Cadent Gas logo
Between
23 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Moorlands Drive

Cadent Gas are proposing to carry out Utility asset works on Moorlands Drive, Mossley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:56.

Rochdale Borough Council logo
LONG TERM
Between
23 Jan and 11 May 2025
Details
View Map
Share
Follow
Taylor Street

Rochdale Borough Council are proposing to carry out roadworks on Taylor Street, Middleton East, Middleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Rochdale Borough Council on 17 Dec 2024 at 15:33.

Cadent Gas logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Roaches Way

Cadent Gas are proposing to carry out Utility asset works on Roaches Way, Mossley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 12:00.

Cadent Gas logo
LONG TERM
Between
24 Jan and 14 Mar 2025
Details
View Map
Share
Follow
George Street

Cadent Gas are proposing to carry out Utility asset works on George Street, Shaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:31.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
27 Jan and 27 Oct 2025
Details
View Map
Share
Alexandra Road

United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:00.

Network Rail logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Spring Bank Lane

Network Rail are proposing to carry out Works for Rail Purposes on Spring Bank Lane, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:58.

Network Rail logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Network Rail are proposing to carry out Works for Rail Purposes on Mill Lane, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Nov 2024 at 11:22.

United Utilities Water (formerly North West Water) logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Hanover Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Hanover Street, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 14:10.

Cadent Gas logo
Between
29 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Crowthorn Road

Cadent Gas are proposing to carry out Utility asset works on Crowthorn Road, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:37.

Cadent Gas logo
Between
29 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Nuthurst Road

Cadent Gas are proposing to carry out Utility asset works on Nuthurst Road, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:30.

Cadent Gas logo
Between
29 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Moston Lane

Cadent Gas are proposing to carry out Utility asset works on Moston Lane, Manchester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:30.

Cadent Gas logo
Between
29 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Huddersfield Road

Cadent Gas are proposing to carry out Utility asset works on Huddersfield Road, Mossley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:06.

Cadent Gas logo
Between
29 Jan and 28 Feb 2025
Details
View Map
Share
Follow
The Meadows

Cadent Gas are proposing to carry out Utility asset works on The Meadows, Alkrington East, Middleton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 11:51.

Cadent Gas logo
Between
29 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Kingsway

Cadent Gas are proposing to carry out Utility asset works on Kingsway, Alkrington West, Middleton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 13:16.

Cadent Gas logo
Between
29 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Flake Lane

Cadent Gas are proposing to carry out Utility asset works on Flake Lane, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 16:22.

Cadent Gas logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Buckton Vale Road

Cadent Gas are proposing to carry out Utility asset works on Buckton Vale Road, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:49.

Tameside Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Tame Street

Tameside Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tame Street, Stalybridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 25 Oct 2024 at 11:05.

Cadent Gas logo
LONG TERM
Between
3 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Whitebank Road

Cadent Gas are proposing to carry out Utility asset works on Whitebank Road, Oldham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 14:14.

Manchester City Council logo
LONG TERM
Between
3 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Victoria Avenue East

Manchester City Council are proposing to carry out Highway improvement works on Victoria Avenue East, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Manchester City Council on 5 Nov 2024 at 10:53.

Manchester City Council logo
LONG TERM
Between
3 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Hinchley Road

Manchester City Council are proposing to carry out Highway improvement works on Hinchley Road, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Manchester City Council on 5 Nov 2024 at 10:53.

Electricity North West (NorWeb) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Den Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Den Lane, Uppermill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 10:12.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
John Heywood Street

Cadent Gas are proposing to carry out Utility asset works on John Heywood Street, Manchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:27.

Cadent Gas logo
Between
10 and 26 Feb 2025
Details
View Map
Share
Follow
Wellington Road

Cadent Gas are proposing to carry out Utility asset works on Wellington Road, Ashton-under-lyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:10.

Cadent Gas logo
Between
10 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Oldham Road

Cadent Gas are proposing to carry out Utility asset works on Oldham Road, Ashton-under-lyne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:10.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Ashton Road

Cadent Gas are proposing to carry out Utility asset works on Ashton Road, Oldham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 15:04.

Cadent Gas logo
Between
12 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ridge Hill Lane

Cadent Gas are proposing to carry out Utility asset works on Ridge Hill Lane, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:40.

Cadent Gas logo
Between
12 and 28 Feb 2025
Details
View Map
Share
Follow
Arlies Lane

Cadent Gas are proposing to carry out Utility asset works on Arlies Lane, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:37.

Cadent Gas logo
Between
13 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Rochdale Road

Cadent Gas are proposing to carry out Utility asset works on Rochdale Road, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 15:40.

Electricity North West (NorWeb) logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Clarence Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Clarence Street, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Nov 2024 at 08:55.

Cadent Gas logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Elm Road

Cadent Gas are proposing to carry out Utility asset works on Elm Road, Oldham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 13:30.

Tameside Metropolitan Borough Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Tameside Metropolitan Borough Council are proposing to carry out Utility asset works on Mill Lane, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 10 Dec 2024 at 11:28.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Broadway

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Broadway, Royton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 16 Dec 2024 at 09:53.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Broadway

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Broadway, Royton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 16 Dec 2024 at 10:22.

Cadent Gas logo
Between
19 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Springs Lane

Cadent Gas are proposing to carry out Utility asset works on Springs Lane, Stalybridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:44.

Cadent Gas logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Shaw.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:48.

Cadent Gas logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Shaw.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:10.

Nexfibre Networks Limited logo
Between
20 and 23 Feb 2025
Details
View Map
Share
Follow
Lovers Lane

Nexfibre Networks Limited are proposing to carry out Utility repair and maintenance works on Lovers Lane, Grasscroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Dec 2024 at 12:45.

Cadent Gas logo
Between
20 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Shaw.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 16:08.

Electricity North West (NorWeb) logo
Between
25 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Fairclough Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Fairclough Street, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Dec 2024 at 11:16.

Cadent Gas logo
Between
26 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Clough Road

Cadent Gas are proposing to carry out Utility asset works on Clough Road, Droylsden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 11:31.

Cadent Gas logo
LONG TERM
Between
26 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Stamford Grove

Cadent Gas are proposing to carry out Utility asset works on Stamford Grove, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 16:30.

Cadent Gas logo
Between
26 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Astley Road

Cadent Gas are proposing to carry out Utility asset works on Astley Road, Stalybridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:36.

Cadent Gas logo
Between
26 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Windermere Road

Cadent Gas are proposing to carry out Utility asset works on Windermere Road, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 12:00.

Cadent Gas logo
Between
26 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Elm Road

Cadent Gas are proposing to carry out Utility asset works on Elm Road, Oldham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 16:10.

Cadent Gas logo
LONG TERM
Between
26 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Whitebank Road

Cadent Gas are proposing to carry out Utility asset works on Whitebank Road, Oldham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:54.

Cadent Gas logo
LONG TERM
Between
5 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:20.

United Utilities Water (formerly North West Water) logo
Between
10 and 19 Mar 2025
Details
View Map
Share
Follow
Market Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Market Street, Hyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 13:28.

Cadent Gas logo
Between
12 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Rochdale Lane

Cadent Gas are proposing to carry out Utility asset works on Rochdale Lane, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:32.

Cadent Gas logo
Between
12 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Flake Lane

Cadent Gas are proposing to carry out Utility asset works on Flake Lane, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:32.

Cadent Gas logo
Between
12 and 28 Mar 2025
Details
View Map
Share
Follow
Fir Bank Road

Cadent Gas are proposing to carry out Utility asset works on Fir Bank Road, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:26.

Cadent Gas logo
Between
12 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Fir Lane

Cadent Gas are proposing to carry out Utility asset works on Fir Lane, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:46.

Cadent Gas logo
Between
12 and 28 Mar 2025
Details
View Map
Share
Follow
Cedar Grove

Cadent Gas are proposing to carry out Utility asset works on Cedar Grove, Royton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:46.

Electricity North West (NorWeb) logo
Between
15 and 19 Mar 2025
Details
View Map
Share
Follow
Berry Brow

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Berry Brow, Manchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 14:29.


Roadworks Map near to Lower Alt Hill, ASHTON-UNDER-LYNE, OL6 8AB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:21
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lower Alt Hill, ASHTON-UNDER-LYNE, OL6 8AB (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
ROSARY ROAD 
(0.5 miles)
United Utilities Water (formerly North West Water)
New service connection - Footway, Carriageway - Give and take
In Progress
Since: 16 Dec 2024 09:39
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
0.5
Details
Share
Follow
2
BT logo
SALISBURY CRESCENT, TAMESIDE 
(0.6 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.6
Details
Share
Follow
3
Oldham Metropolitan Borough Council logo
MAJOR
  
TUNS ROAD 
(0.7 miles)
Oldham Metropolitan Borough Council
Section 50 - Carriageway - Two-way signals
Planned
Scheduled: 5 Dec 2024 - 9 Apr 2025
0.7
Details
Share
Follow
4
Oldham Metropolitan Borough Council logo
MAJOR
  
DEANSHUT ROAD 
(0.7 miles)
Oldham Metropolitan Borough Council
Highway repair and maintenance works - Footway, Carriageway - Multi-way signals
Complete
29 Jul 2024 09:30 - 12 Dec 2024 08:00
0.7
Details
Share
5
United Utilities Water (formerly North West Water) logo
URGENT
  
BROADOAK ROAD 
(0.8 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
13 Dec 2024 09:14 - 17 Dec 2024 12:32
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.