ROADWORKS SUMMARY
North Rise, OLDHAM, OL3 7ED

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for North Rise, OL3 7ED and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to North Rise, OLDHAM, OL3 7ED

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for North Rise are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oldham Metropolitan Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Southgate Street

Oldham Metropolitan Borough Council are carrying out Section 50 on Southgate Street, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2022 at 09:31 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 31 Mar 2025 at 11:36.

Oldham Metropolitan Borough Council logo
LONG TERM
Until
15 Nov 2025
Details
View Map
Share
Follow
Market Place

Oldham Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Place, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 09:30 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 12 Nov 2024 at 14:44.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
27 Jan and 27 Oct 2025
Details
View Map
Share
Alexandra Road

United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Alexandra Road, Ashton-under-lyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:00.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Turner Lane

United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Turner Lane, Ashton-under-lyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 09:01.

Derbyshire County Council logo
LONG TERM
Between
6 May and 30 Sep 2025
Details
View Map
Share
Follow
Padfield Main Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Padfield Main Road, Padfield, Glossop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 28 Jan 2025 at 11:01.

Cadent Gas logo
LONG TERM
Between
28 Aug and 29 Sep 2025
Details
View Map
Share
Lees Road

Cadent Gas were proposing to carry out Utility asset works on Lees Road, Ashton-under-lyne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 09:08.

Oldham Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Cromford Street

Oldham Metropolitan Borough Council are carrying out Section 50 on Cromford Street, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 11 Sep 2025 at 15:33.

Electricity North West (NorWeb) logo
Until
6 Oct 2025
Details
View Map
Share
Follow
Woodstock Street

Electricity North West (NorWeb) are carrying out New service connection on Woodstock Street, Oldham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:00 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2025 at 08:12.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Greenhurst Road

Cadent Gas are proposing to carry out Utility asset works on Greenhurst Road, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 09:31.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Greenhurst Road

Cadent Gas are proposing to carry out Utility asset works on Greenhurst Road, Ashton-under-lyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jun 2025 at 10:56.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Matley Lane

BT are carrying out New service connection on Matley Lane, Stalybridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:55 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Sep 2025 at 12:50.

Electricity North West (NorWeb) logo
Until
5 Oct 2025
Details
View Map
Share
Follow
Ripponden Road

Electricity North West (NorWeb) are carrying out Diversionary works on Ripponden Road, Oldham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 12:52 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 14:51.

United Utilities Water (formerly North West Water) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lord Street

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Lord Street, Ashton-under-lyne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 06:13 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2025 at 10:51.

Electricity North West (NorWeb) logo
Finishing
Thursday
Details
View Map
Share
Follow
Binns Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Binns Street, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jul 2025 at 09:39.

Electricity North West (NorWeb) logo
Between
22 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Ripponden Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Ripponden Road, Oldham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 27 Aug 2025 at 11:37.

Electricity North West (NorWeb) logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Manchester Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Manchester Road, Mossley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Sep 2025 at 14:26.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
29 Sep 2025 and 20 Sep 2026
Details
View Map
Share
Follow
Dunbar Street

Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Dunbar Street, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 15 Aug 2025 at 10:38.

Oldham Metropolitan Borough Council logo
LONG TERM
Between
29 Sep and 30 Oct 2025
Details
View Map
Share
Follow
Sholver Lane

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sholver Lane, Oldham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 19 Aug 2025 at 10:55.

Electricity North West (NorWeb) logo
Between
1 and 29 Oct 2025
Details
View Map
Share
Follow
Marlborough Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Marlborough Street, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2025 at 13:26.

Cadent Gas logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Buckstones Road

Cadent Gas are proposing to carry out Utility asset works on Buckstones Road, Shaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 10:53.

Oldham Metropolitan Borough Council logo
Between
8 and 21 Oct 2025
Details
View Map
Share
Follow
Cromford Street

Oldham Metropolitan Borough Council are proposing to carry out Section 50 on Cromford Street, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 16 Jul 2025 at 16:19.

Electricity North West (NorWeb) logo
Between
9 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Tame Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Tame Street, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2025 at 09:01.

Electricity North West (NorWeb) logo
Between
9 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Tame Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Tame Street, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 10:41.

Electricity North West (NorWeb) logo
Between
9 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Park Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Park Road, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 10:41.

Electricity North West (NorWeb) logo
Between
9 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Park Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Park Road, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2025 at 09:02.

Electricity North West (NorWeb) logo
Between
9 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Clarence Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Clarence Street, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2025 at 09:02.

Electricity North West (NorWeb) logo
Between
9 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Clarence Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Clarence Street, Stalybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 10:41.

Oldham Metropolitan Borough Council logo
Between
10 and 27 Oct 2025
Details
View Map
Share
Follow
Buckstones Road

Oldham Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Buckstones Road, Shaw.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 18 Jul 2025 at 14:40.

Cadent Gas logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Ladhill Lane

Cadent Gas are proposing to carry out Utility asset works on Ladhill Lane, Greenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 12:11.

Cadent Gas logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Quickedge Road

Cadent Gas are proposing to carry out Utility asset works on Quickedge Road, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 14:46.

Cadent Gas logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Quickedge Road

Cadent Gas are proposing to carry out Utility asset works on Quickedge Road, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 07:30.

Oldham Metropolitan Borough Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Delph New Road

Oldham Metropolitan Borough Council are proposing to carry out Highway improvement works on Delph New Road, Dobcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 3 Sep 2025 at 15:48.

Oldham Metropolitan Borough Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Sugar Lane

Oldham Metropolitan Borough Council are proposing to carry out Highway improvement works on Sugar Lane, Dobcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 3 Sep 2025 at 15:48.

Oldham Metropolitan Borough Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Dobcross New Road

Oldham Metropolitan Borough Council are proposing to carry out Highway improvement works on Dobcross New Road, Dobcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 3 Sep 2025 at 15:47.

Oldham Metropolitan Borough Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Delph New Road

Oldham Metropolitan Borough Council are proposing to carry out Highway improvement works on Delph New Road, Dobcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 3 Sep 2025 at 15:47.

Cadent Gas logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Shaw.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 13:45.

Electricity North West (NorWeb) logo
Between
30 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Rock Street

Electricity North West (NorWeb) are proposing to carry out Remedial works on Rock Street, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2025 at 11:54.

Tameside Metropolitan Borough Council logo
Between
1 and 29 Nov 2025
Details
View Map
Share
Follow
Darnton Road

Tameside Metropolitan Borough Council are proposing to carry out Highway improvement works on Darnton Road, Stalybridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Tameside Metropolitan Borough Council on 15 Sep 2025 at 16:06.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Lower Wharf Street

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Lower Wharf Street, Ashton-under-lyne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Sep 2025 at 09:46.

Electricity North West (NorWeb) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Bullcote Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Bullcote Lane, Royton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Aug 2025 at 15:38.

Cadent Gas logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Chadderton Way

Cadent Gas are proposing to carry out Utility asset works on Chadderton Way, Oldham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 14:50.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
19 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Luzley Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Luzley Road, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 19 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 14:23.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
19 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Arlies Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Arlies Lane, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 19 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 14:23.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
19 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Luzley Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Luzley Road, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 19 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 14:24.

Cadent Gas logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Buckstones Road

Cadent Gas are proposing to carry out Utility asset works on Buckstones Road, Shaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 10:10.

BT logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Matley Lane

BT are proposing to carry out New service connection on Matley Lane, Stalybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Aug 2025 at 13:57.

United Utilities Water (formerly North West Water) logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Egerton Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Egerton Street, Mossley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Sep 2025 at 12:06.

Electricity North West (NorWeb) logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Breeze Hill Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Breeze Hill Road, Oldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 1 Sep 2025 at 09:27.

Oldham Metropolitan Borough Council logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Sugar Lane

Oldham Metropolitan Borough Council are proposing to carry out Highway improvement works on Sugar Lane, Dobcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 3 Sep 2025 at 10:39.

Oldham Metropolitan Borough Council logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Delph New Road

Oldham Metropolitan Borough Council are proposing to carry out Highway improvement works on Delph New Road, Dobcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 3 Sep 2025 at 10:34.

Oldham Metropolitan Borough Council logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Dobcross New Road

Oldham Metropolitan Borough Council are proposing to carry out Highway improvement works on Dobcross New Road, Dobcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 3 Sep 2025 at 10:37.

Oldham Metropolitan Borough Council logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Delph New Road

Oldham Metropolitan Borough Council are proposing to carry out Highway improvement works on Delph New Road, Dobcross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oldham Metropolitan Borough Council on 3 Sep 2025 at 10:35.

Cadent Gas logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Ladhill Lane

Cadent Gas are proposing to carry out Utility asset works on Ladhill Lane, Greenfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 14:53.

Electricity North West (NorWeb) logo
Between
2 and 8 Dec 2025
Details
View Map
Share
Follow
Greenwood Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Greenwood Avenue, Ashton-under-lyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 09:41.

Cadent Gas logo
LONG TERM
Between
3 Dec 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Hillside Avenue

Cadent Gas are proposing to carry out Utility asset works on Hillside Avenue, Shaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 10:56.

Derbyshire County Council logo
Between
9 and 11 Dec 2025
Details
View Map
Share
Follow
Woolley Mill Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Woolley Mill Lane, Tintwistle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 23 Jul 2025 at 11:36.

Derbyshire County Council logo
Between
9 and 11 Dec 2025
Details
View Map
Share
Follow
Woolley Mill Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Woolley Mill Lane, Tintwistle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 23 Jul 2025 at 08:06.


Roadworks Map near to North Rise, OLDHAM, OL3 7ED (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 19 Sep 2025 00:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to North Rise, OLDHAM, OL3 7ED (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Network Rail logo
MAJOR
  
DARK LANE 
(0.8 miles)
Network Rail
Works for Rail Purposes - Footpath - Road closure
Planned
Scheduled: 30 Aug 2025 - 28 Feb 2026
0.8
Details
Share
Follow
2
Network Rail logo
MAJOR
  
DARK LANE 
(0.8 miles)
Network Rail
Works for Rail Purposes - Footpath - Road closure
In Progress
Since: 30 Aug 2025 00:01
(Scheduled: 30 Aug 2025 - 28 Feb 2026)
0.8
Details
Share