ROADWORKS SUMMARY
Eagley Bank, ROCHDALE, OL12 8HE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Eagley Bank, OL12 8HE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Eagley Bank, ROCHDALE, OL12 8HE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Eagley Bank are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
15 Feb 2025
Details
View Map
Share
Follow
Station Approach

Network Rail are carrying out Works for Rail Purposes on Station Approach, Todmorden.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2023 at 09:30 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Aug 2024 at 08:45.

Rochdale Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Over Town Lane

Rochdale Borough Council are carrying out Utility asset works on Over Town Lane, Norden North, Rochdale.

These works are categorised as Major.

The works started on 2 April 2024 at 07:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Rochdale Borough Council on 2 Dec 2024 at 10:47.

Rochdale Borough Council logo
LONG TERM
Between
23 Sep 2024 and 17 Jan 2025
Details
View Map
Share
Follow
St Marys Gate

Rochdale Borough Council are proposing to carry out Works for road purposes on St Marys Gate, Cronkeyshaw, Rochdale.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Rochdale Borough Council on 6 Aug 2024 at 10:10.

Rochdale Borough Council logo
LONG TERM
Until
27 Mar 2025
Details
View Map
Share
Follow
St Marys Gate

Rochdale Borough Council are carrying out Works for road purposes on St Marys Gate, Cronkeyshaw, Rochdale.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:00 and could run through until 27 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Rochdale Borough Council on 16 Oct 2024 at 14:28.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Croft Head Drive

Cadent Gas are carrying out Utility asset works on Croft Head Drive, Milnrow North & Firgrove, Milnrow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 10:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 14:40.

Northern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Shaw Wood Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Shaw Wood Road, Todmorden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 10:35 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Nov 2024 at 12:32.

Electricity North West (NorWeb) logo
Finishing
Friday
Details
View Map
Share
Follow
James Street

Electricity North West (NorWeb) are proposing to carry out New service connection on James Street, Littleborough West, Littleborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Oct 2024 at 15:21.

Cadent Gas logo
Between
10 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Grafton Street

Cadent Gas are proposing to carry out Utility asset works on Grafton Street, Newbold, Rochdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:07.

Cadent Gas logo
Between
10 and 31 Dec 2024
Details
View Map
Share
Follow
Lane End Road

Cadent Gas are proposing to carry out Utility asset works on Lane End Road, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 11:38.

Cadent Gas logo
Between
10 and 31 Dec 2024
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Oct 2024 at 13:01.

Cadent Gas logo
Between
10 and 31 Dec 2024
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 11:46.

Cadent Gas logo
LONG TERM
Between
10 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Channing Street

Cadent Gas are proposing to carry out Utility asset works on Channing Street, Newbold, Rochdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:05.

Electricity North West (NorWeb) logo
Between
25 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Oak Hill

Electricity North West (NorWeb) are proposing to carry out New service connection on Oak Hill, Littleborough West, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Oct 2024 at 14:51.

Rochdale Borough Council logo
Between
30 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Mere Street

Rochdale Borough Council are proposing to carry out Highway improvement works on Mere Street, Milkstone, Rochdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Rochdale Borough Council on 2 Oct 2024 at 15:12.

Cadent Gas logo
Between
2 and 18 Jan 2025
Details
View Map
Share
Follow
Cook Terrace

Cadent Gas are proposing to carry out Utility asset works on Cook Terrace, Belfield & Howarth Cross, Rochdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 09:45.

Cadent Gas logo
Between
2 and 18 Jan 2025
Details
View Map
Share
Follow
Cook Terrace

Cadent Gas are proposing to carry out Utility asset works on Cook Terrace, Belfield & Howarth Cross, Rochdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 10:42.

Electricity North West (NorWeb) logo
Between
2 and 19 Jan 2025
Details
View Map
Share
Featherstall Road

Electricity North West (NorWeb) were proposing to carry out New service connection on Featherstall Road, Littleborough East, Littleborough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 19 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Nov 2024 at 13:50.

Electricity North West (NorWeb) logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Albert Royds Street

Electricity North West (NorWeb) were proposing to carry out Utility asset works on Albert Royds Street, Belfield & Howarth Cross, Rochdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 11:53.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Bold Street

BT are proposing to carry out Utility repair and maintenance works on Bold Street, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Nov 2024 at 09:06.

Electricity North West (NorWeb) logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Featherstall Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Featherstall Road, Littleborough East, Littleborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 14:04.

Electricity North West (NorWeb) logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
William Street

Electricity North West (NorWeb) are proposing to carry out Utility asset works on William Street, Littleborough East, Littleborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Sep 2024 at 10:21.

Electricity North West (NorWeb) logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
New Road

Electricity North West (NorWeb) were proposing to carry out Utility asset works on New Road, Littleborough East, Littleborough.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 11:54.

Electricity North West (NorWeb) logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Albert Royds Street

Electricity North West (NorWeb) were proposing to carry out Utility asset works on Albert Royds Street, Belfield & Howarth Cross, Rochdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 24 Sep 2024 at 13:35.

Electricity North West (NorWeb) logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Halifax Road

Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Halifax Road, Belfield & Howarth Cross, Rochdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 11:54.

Rochdale Borough Council logo
LONG TERM
Between
6 Jan and 30 Mar 2025
Details
View Map
Share
Follow
Shawclough Road

Rochdale Borough Council are proposing to carry out Highway improvement works on Shawclough Road, Shawclough, Rochdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Rochdale Borough Council on 6 Nov 2024 at 13:35.

Rochdale Borough Council logo
LONG TERM
Between
6 Jan and 27 Apr 2025
Details
View Map
Share
Follow
Shawclough Road

Rochdale Borough Council are proposing to carry out Highway improvement works on Shawclough Road, Shawclough, Rochdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Rochdale Borough Council on 26 Nov 2024 at 14:01.

Electricity North West (NorWeb) logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Albert Royds Street

Electricity North West (NorWeb) were proposing to carry out Utility asset works on Albert Royds Street, Belfield & Howarth Cross, Rochdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Oct 2024 at 08:12.

Electricity North West (NorWeb) logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Halifax Road

Electricity North West (NorWeb) were proposing to carry out Utility asset works on Halifax Road, Wardle, Rochdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 11:54.

Electricity North West (NorWeb) logo
Between
14 and 27 Jan 2025
Details
View Map
Share
Follow
William Street

Electricity North West (NorWeb) are proposing to carry out New service connection on William Street, Littleborough East, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 12:21.

Electricity North West (NorWeb) logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Oak Hill

Electricity North West (NorWeb) are proposing to carry out New service connection on Oak Hill, Littleborough West, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 14:39.

Electricity North West (NorWeb) logo
Between
17 and 30 Jan 2025
Details
View Map
Share
William Street

Electricity North West (NorWeb) were proposing to carry out New service connection on William Street, Littleborough East, Littleborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 12:50.

Electricity North West (NorWeb) logo
Between
17 and 30 Jan 2025
Details
View Map
Share
Follow
William Street

Electricity North West (NorWeb) are proposing to carry out New service connection on William Street, Littleborough East, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 14:41.

Electricity North West (NorWeb) logo
Between
17 and 30 Jan 2025
Details
View Map
Share
Follow
William Street

Electricity North West (NorWeb) are proposing to carry out New service connection on William Street, Littleborough East, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Dec 2024 at 15:12.

Electricity North West (NorWeb) logo
LONG TERM
Between
18 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Kingsway

Electricity North West (NorWeb) are proposing to carry out Utility asset works on Kingsway, Newbold, Rochdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Dec 2024 at 08:44.

Electricity North West (NorWeb) logo
LONG TERM
Between
18 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Kingsway

Electricity North West (NorWeb) are proposing to carry out Utility asset works on Kingsway, Newbold, Rochdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Nov 2024 at 10:42.

Electricity North West (NorWeb) logo
LONG TERM
Between
18 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Kingsway

Electricity North West (NorWeb) are proposing to carry out Utility asset works on Kingsway, Newbold, Rochdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Dec 2024 at 14:46.

Electricity North West (NorWeb) logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Albert Royds Street

Electricity North West (NorWeb) are proposing to carry out Utility asset works on Albert Royds Street, Belfield & Howarth Cross, Rochdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2024 at 08:47.

Electricity North West (NorWeb) logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
James Street

Electricity North West (NorWeb) are proposing to carry out New service connection on James Street, Littleborough West, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 12:10.

Electricity North West (NorWeb) logo
Between
20 and 23 Jan 2025
Details
View Map
Share
James Street

Electricity North West (NorWeb) were proposing to carry out New service connection on James Street, Littleborough West, Littleborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 10:49.

Yorkshire Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Back Industrial Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Industrial Street, Todmorden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Nov 2024 at 15:41.

Electricity North West (NorWeb) logo
Between
20 and 26 Jan 2025
Details
View Map
Share
Follow
James Street

Electricity North West (NorWeb) are proposing to carry out New service connection on James Street, Littleborough West, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Nov 2024 at 16:46.

Electricity North West (NorWeb) logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Old Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Old Road, Wardle, Rochdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Oct 2024 at 15:19.

Electricity North West (NorWeb) logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Old Road

Electricity North West (NorWeb) were proposing to carry out New service connection on Old Road, Wardle, Rochdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 11:18.

Electricity North West (NorWeb) logo
Between
27 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Paddock Head

Electricity North West (NorWeb) are proposing to carry out New service connection on Paddock Head, Littleborough East, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 12:12.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Bold Street

BT are proposing to carry out Utility repair and maintenance works on Bold Street, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Nov 2024 at 11:43.

Electricity North West (NorWeb) logo
Between
6 and 9 Feb 2025
Details
View Map
Share
Follow
Whitegate

Electricity North West (NorWeb) are proposing to carry out New service connection on Whitegate, Smithy Bridge, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Dec 2024 at 15:41.

Electricity North West (NorWeb) logo
Between
13 and 16 Feb 2025
Details
View Map
Share
Follow
Whitegate

Electricity North West (NorWeb) are proposing to carry out New service connection on Whitegate, Smithy Bridge, Littleborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Dec 2024 at 15:43.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:16.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Booth Crescent

Cadent Gas are proposing to carry out Utility asset works on Booth Crescent, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Dec 2024 at 10:02.

Cadent Gas logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lane End Road

Cadent Gas are proposing to carry out Utility asset works on Lane End Road, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:18.

Cadent Gas logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lane End Road

Cadent Gas are proposing to carry out Utility asset works on Lane End Road, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:07.

Cadent Gas logo
LONG TERM
Between
19 Feb and 28 Mar 2025
Details
View Map
Share
New Line

Cadent Gas were proposing to carry out Utility asset works on New Line, Bacup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 09:01.

Cadent Gas logo
LONG TERM
Between
19 Feb and 28 Mar 2025
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:10.

Cadent Gas logo
Between
21 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Booth Crescent

Cadent Gas are proposing to carry out Utility asset works on Booth Crescent, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 12:15.

Cadent Gas logo
Between
21 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:38.

Lancashire County Council logo
Between
9 and 13 Mar 2025
Details
View Map
Share
Follow
Tong Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Tong Lane, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 9 Dec 2024 at 10:57.


Roadworks Map near to Eagley Bank, ROCHDALE, OL12 8HE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Eagley Bank, ROCHDALE, OL12 8HE (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
URGENT
  
OLD LANE 
(0.2 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Carriageway - Road closure
Complete
12 Dec 2024 01:17 - 13 Dec 2024 07:47
0.2
Details
Share
2
United Utilities Water (formerly North West Water) logo
URGENT
  
MARKET STREET 
(0.3 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 16 Dec 2024 14:31
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.3
Details
Share
Follow
3
Cadent Gas logo
EMERGENCY
  
OAK STREET 
(0.4 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Dec 2024 09:48
(Scheduled: 17 Dec 2024 - 27 Dec 2024)
0.4
Details
Share
Follow
4
BT logo
NEW LINE 
(0.9 miles)
BT
Utility asset works - Footway - Two-way signals
Cancelled
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.9
Details
Share
5
Cadent Gas logo
MAJOR
  
NEW LINE 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 3 Dec 2024 08:00
(Scheduled: 3 Dec 2024 - 20 Dec 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.