ROADWORKS SUMMARY
Mill Green, NORWICH, NR14 8PB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Mill Green, NR14 8PB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Mill Green, NORWICH, NR14 8PB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mill Green are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Norfolk County Council logo
LONG TERM
Between
1 Jan and 7 Aug 2025
Details
View Map
Share
St Andrews Street

Norfolk County Council were proposing to carry out Highway improvement works on St Andrews Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 25 Sep 2024 at 15:57.

Norfolk County Council logo
LONG TERM
Between
1 Jan and 7 Aug 2025
Details
View Map
Share
St Benedicts Street

Norfolk County Council were proposing to carry out Highway improvement works on St Benedicts Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 25 Sep 2024 at 15:57.

Norfolk County Council logo
LONG TERM
Between
1 Jan and 7 Aug 2025
Details
View Map
Share
Duke Street

Norfolk County Council were proposing to carry out Highway improvement works on Duke Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 25 Sep 2024 at 15:56.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Ipswich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Ipswich Road, Keswick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 18 Sep 2024 at 10:23.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Grapes Hill

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Grapes Hill, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:52.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
St Benedicts Street

Norfolk County Council are proposing to carry out Highway repair and maintenance works on St Benedicts Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:53.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Valentine Street

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Valentine Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:54.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Golding Place

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Golding Place, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:53.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Golding Place

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Golding Place, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 18 Dec 2024 at 10:54.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Barn Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Barn Road, Heigham, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:51.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Raglan Street

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Raglan Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 26 Nov 2024 at 07:29.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Dereham Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Dereham Road, Heigham, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:51.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Grapes Hill

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Grapes Hill, Mancroft, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 16 Oct 2024 at 13:03.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Grapes Hill

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Grapes Hill, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:56.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
St Benedicts Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on St Benedicts Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:56.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Barn Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Barn Road, Heigham, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 16 Oct 2024 at 13:01.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Valentine Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Valentine Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:57.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Raglan Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Raglan Street, Mancroft, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 16 Oct 2024 at 12:59.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Golding Place

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Golding Place, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:57.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Barn Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Barn Road, Heigham, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:55.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Raglan Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Raglan Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:55.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Dereham Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Dereham Road, Heigham, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 16 Oct 2024 at 12:57.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Dereham Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Dereham Road, Heigham, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:54.

Norfolk County Council logo
LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Ipswich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Ipswich Road, Keswick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 21 Jan 2025 at 10:19.

Norfolk County Council logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Timberhill

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Timberhill, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 3 Jan 2025 at 09:17.

Norfolk County Council logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Timberhill

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Timberhill, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 17 Feb 2025 at 12:23.

Norfolk County Council logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Orford Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Orford Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 10 Jan 2025 at 12:26.

Norfolk County Council logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Orford Hill

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Orford Hill, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 13 Jan 2025 at 07:34.

Norfolk County Council logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Orford Hill

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Orford Hill, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 17 Feb 2025 at 12:23.

Norfolk County Council logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Orford Street

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Orford Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Norfolk County Council on 3 Jan 2025 at 09:19.

Norfolk County Council logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Red Lion Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Red Lion Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 7 Jan 2025 at 15:53.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Yarmouth Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Yarmouth Road, Thorpe St Andrew.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 10 Sep 2024 at 11:55.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Yarmouth Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Yarmouth Road, Thorpe St Andrew.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 24 Feb 2025 at 16:28.

Cadent Gas logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Waverley Road

Cadent Gas are carrying out Utility asset works on Waverley Road, Eaton, Norwich.

These works are categorised as Major.

The works started on 3 March 2025 at 10:28 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 10:36.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Mile End Road

Cadent Gas were proposing to carry out Utility asset works on Mile End Road, St Stephen, Norwich.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 14:08.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Melrose Road

Cadent Gas are proposing to carry out Utility asset works on Melrose Road, St Stephen, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 10:13.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Melrose Road

Cadent Gas were proposing to carry out Utility asset works on Melrose Road, St Stephen, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 14:09.

Norfolk County Council logo
LONG TERM
Between
6 Mar and 16 May 2025
Details
View Map
Share
Follow
Wellesley Avenue South

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Wellesley Avenue South, Thorpe Hamlet, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 3 Mar 2025 at 14:24.

Norfolk County Council logo
LONG TERM
Until
16 May 2025
Details
View Map
Share
Follow
Wellesley Avenue South

Norfolk County Council are carrying out Highway repair and maintenance works on Wellesley Avenue South, Thorpe Hamlet, Norwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 March 2025 at 09:00 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 7 Mar 2025 at 09:30.

Norfolk County Council logo
Finishing
Friday
Details
View Map
Share
Thorpe Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Thorpe Road, Thorpe Hamlet, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 19 Feb 2025 at 10:38.

Norfolk County Council logo
Finishing
Friday
Details
View Map
Share
Riverside Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Riverside Road, Thorpe Hamlet, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 19 Feb 2025 at 10:38.

Cadent Gas logo
Until
8 Apr 2025
Details
View Map
Share
Follow
Daniels Road

Cadent Gas are carrying out Utility repair and maintenance works on Daniels Road, Norwich.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2025 at 14:00 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 11:40.

Cadent Gas logo
Until
8 Apr 2025
Details
View Map
Share
Follow
Newmarket Road

Cadent Gas are carrying out Utility repair and maintenance works on Newmarket Road, Eaton, Norwich.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2025 at 14:00 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 11:40.

Cadent Gas logo
Until
8 Apr 2025
Details
View Map
Share
Follow
Mile End Road

Cadent Gas are carrying out Utility repair and maintenance works on Mile End Road, St Stephen, Norwich.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2025 at 09:30 and could run through until 8 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 11:40.

National Highways logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Cantley Lane

National Highways are carrying out Highway improvement works on Cantley Lane, Ketteringham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:00 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Mar 2025 at 14:43.

Cadent Gas logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Waverley Road

Cadent Gas are proposing to carry out Utility asset works on Waverley Road, Eaton, Norwich.

These works are categorised as Major.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:40.

Norfolk County Council logo
Between
17 Mar and 2 Apr 2025
Details
View Map
Share
Follow
All Saints Green

Norfolk County Council are proposing to carry out Highway repair and maintenance works on All Saints Green, Mancroft, Norwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 25 Feb 2025 at 07:30.

Norfolk County Council logo
Until
2 Apr 2025
Details
View Map
Share
Follow
All Saints Green

Norfolk County Council are carrying out Highway repair and maintenance works on All Saints Green, Mancroft, Norwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 17 Mar 2025 at 09:45.

Anglian Water logo
Finishing
Wednesday
Details
View Map
Share
White Lion Street

Anglian Water were proposing to carry out Utility repair and maintenance works on White Lion Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 Feb 2025 at 15:28.

Anglian Water logo
Between
17 Mar and 2 Apr 2025
Details
View Map
Share
Follow
White Lion Street

Anglian Water are proposing to carry out Utility repair and maintenance works on White Lion Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 17 Feb 2025 at 07:21.

Anglian Water logo
Until
16 Apr 2025
Details
View Map
Share
Follow
White Lion Street

Anglian Water are carrying out Utility repair and maintenance works on White Lion Street, Mancroft, Norwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:26 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Mar 2025 at 09:22.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bull Close

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bull Close, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Jan 2025 at 07:17.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Bull Close

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Bull Close, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Feb 2025 at 11:21.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Barrack Street

Cadent Gas are carrying out Utility repair and maintenance works on Barrack Street, Mancroft, Norwich.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2025 at 10:33 and could run through until 26 March 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 15:32.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Upton Road

Anglian Water are carrying out Utility repair and maintenance works on Upton Road, St Stephen, Norwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 07:21 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Mar 2025 at 08:03.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Guernsey Road

Anglian Water are carrying out Utility repair and maintenance works on Guernsey Road, Coslany, Norwich.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 10:30 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 19 Mar 2025 at 15:37.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Brooke Road

Cadent Gas are proposing to carry out Utility asset works on Brooke Road, Shotesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 11:02.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Brooke Road

Cadent Gas are proposing to carry out Utility asset works on Brooke Road, Shotesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 06:54.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
The Walnuts Footpath South Of 21 To West Of 29

Cadent Gas are proposing to carry out Utility asset works on The Walnuts Footpath South Of 21 To West Of 29, Norwich.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 15:37.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Cozens Road

Cadent Gas were proposing to carry out Utility asset works on Cozens Road, Thorpe Hamlet, Norwich.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 13:39.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cozens Road

Cadent Gas are proposing to carry out Utility asset works on Cozens Road, Thorpe Hamlet, Norwich.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 10:11.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mill Hill Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Hill Road, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Jan 2025 at 10:55.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mill Hill Road

Anglian Water are carrying out Utility repair and maintenance works on Mill Hill Road, Nelson, Norwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 07:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 24 Mar 2025 at 07:51.

Virgin Media logo
Finishing
Wednesday
Details
View Map
Share
Queen Street

Virgin Media were proposing to carry out Utility asset works on Queen Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Dec 2024 at 08:58.

Virgin Media logo
Finishing
Wednesday
Details
View Map
Share
Queen Street

Virgin Media were proposing to carry out Utility asset works on Queen Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Feb 2025 at 11:34.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
St Georges Street

Cadent Gas are proposing to carry out Utility asset works on St Georges Street, Mancroft, Norwich.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 12:08.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
St Georges Street

Cadent Gas are proposing to carry out Utility asset works on St Georges Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 08:21.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
St Georges Street

Cadent Gas are proposing to carry out Utility asset works on St Georges Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:56.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
St Georges Street

Cadent Gas are proposing to carry out Utility asset works on St Georges Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 00:10.

Norfolk County Council logo
Finishing
Saturday
Details
View Map
Share
Norwich Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Norwich Road, Long Stratton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 26 Feb 2025 at 10:39.

Norfolk County Council logo
Finishing
Saturday
Details
View Map
Share
Ipswich Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Ipswich Road, Tasburgh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 26 Feb 2025 at 10:39.

Norfolk County Council logo
Finishing
Saturday
Details
View Map
Share
Ipswich Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Ipswich Road, Saxlingham Thorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 26 Feb 2025 at 10:38.

Norfolk County Council logo
Finishing
Saturday
Details
View Map
Share
Ipswich Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Ipswich Road, Newton Flotman.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 26 Feb 2025 at 10:38.

National Highways logo
LONG TERM
Until
9 May 2025
Details
View Map
Share
Follow
Norwich Road

National Highways are carrying out Highway improvement works on Norwich Road, Hethersett.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2025 at 09:30 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Mar 2025 at 13:37.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 07:57.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:32.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Burgate Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Burgate Lane, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:11.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 15:16.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Mar 2025 at 08:35.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Framingham Earl.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 08:02.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Framingham Earl.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:32.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Burgate Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Burgate Lane, Framingham Earl.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:12.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Framingham Earl.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 15:17.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Framingham Earl.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Mar 2025 at 08:35.

Norfolk County Council logo
On
31 Mar 2025
Details
View Map
Share
Follow
Fox Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Fox Road, Framingham Pigot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 31 March 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 12 Mar 2025 at 14:26.

Anglian Water logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Follow
Warwick Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Warwick Street, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 27 Jan 2025 at 07:26.

Anglian Water logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Follow
Warwick Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Warwick Street, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 12 Mar 2025 at 06:22.

Cityfibre Metro Networks logo
Between
31 Mar and 17 Apr 2025
Details
View Map
Share
Colegate

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Colegate, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 17 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Feb 2025 at 11:29.

Anglian Water logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Caernarvon Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Caernarvon Road, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Mar 2025 at 10:30.

Anglian Water logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Caernarvon Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Caernarvon Road, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Jan 2025 at 14:21.

Norfolk County Council logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Mousehold Street

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Mousehold Street, Mousehold, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 19 Feb 2025 at 16:19.

Cityfibre Metro Networks logo
Between
10 and 18 Apr 2025
Details
View Map
Share
Follow
Reeders Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Reeders Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 08:17.

Cityfibre Metro Networks logo
Between
10 and 18 Apr 2025
Details
View Map
Share
Follow
Reeders Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Reeders Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:32.

Cityfibre Metro Networks logo
Between
10 and 18 Apr 2025
Details
View Map
Share
Reeders Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Reeders Lane, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:12.

Cityfibre Metro Networks logo
Between
10 and 18 Apr 2025
Details
View Map
Share
Follow
Reeders Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Reeders Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 15:17.

Cityfibre Metro Networks logo
Between
10 and 18 Apr 2025
Details
View Map
Share
Follow
Reeders Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Reeders Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Mar 2025 at 08:36.

Anglian Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Rosary Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Rosary Road, Thorpe Hamlet, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Jan 2025 at 08:20.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Follow
Wheel Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wheel Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 08:27.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Follow
Wheel Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wheel Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:33.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Follow
Wheel Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wheel Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 15:10.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Wheel Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Wheel Road, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Feb 2025 at 08:20.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Follow
Wheel Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wheel Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 09:02.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Wheel Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Wheel Road, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:09.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Wheel Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Wheel Road, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Feb 2025 at 13:32.

Cadent Gas logo
Between
22 Apr and 13 May 2025
Details
View Map
Share
Follow
The Walnuts Footpath South Of 21 To West Of 29

Cadent Gas are proposing to carry out Utility asset works on The Walnuts Footpath South Of 21 To West Of 29, Norwich.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:31.

Cadent Gas logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Rutland Street

Cadent Gas are proposing to carry out New service connection on Rutland Street, St Stephen, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 10:39.

Cityfibre Metro Networks logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
St Georges Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on St Georges Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 08:53.

Cityfibre Metro Networks logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
St Georges Street

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on St Georges Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 2 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Feb 2025 at 13:35.

Anglian Water logo
Between
27 Apr and 4 May 2025
Details
View Map
Share
Follow
Wensum Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Wensum Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2025 and could run through until 4 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Jan 2025 at 08:19.

Cityfibre Metro Networks logo
Between
28 Apr and 1 May 2025
Details
View Map
Share
Follow
Yelverton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Yelverton Road, Framingham Earl.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Mar 2025 at 10:54.

Cityfibre Metro Networks logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Framingham Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Framingham Lane, Bramerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Mar 2025 at 13:30.

Norfolk County Council logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Telegraph Lane East

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Telegraph Lane East, Thorpe Hamlet, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 20 Jan 2025 at 13:03.

Norfolk County Council logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Telegraph Lane East

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Telegraph Lane East, Thorpe Hamlet, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 17 Mar 2025 at 08:12.

UK Power Networks Eastern & London logo
Between
28 Apr and 5 May 2025
Details
View Map
Share
Follow
Cross Lane

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Cross Lane, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 12:56.

Cityfibre Metro Networks logo
Between
1 and 7 May 2025
Details
View Map
Share
Follow
Framingham Earl Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Framingham Earl Road, Yelverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Mar 2025 at 10:55.

Norfolk County Council logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Ipswich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Ipswich Road, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 6 Dec 2024 at 06:40.

London Borough Of Bexley logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Ipswich Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Ipswich Road, Keswick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Bexley on 5 Dec 2024 at 20:08.

Norfolk County Council logo
LONG TERM
Between
6 May and 8 Aug 2025
Details
View Map
Share
Follow
Hall Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Hall Road, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 17 Mar 2025 at 08:14.

Norfolk County Council logo
LONG TERM
Between
6 May and 8 Aug 2025
Details
View Map
Share
Follow
Fountains Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Fountains Road, Town Close, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 10 Mar 2025 at 07:47.

Norfolk County Council logo
LONG TERM
Between
6 May and 8 Aug 2025
Details
View Map
Share
Follow
Locksley Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Locksley Road, Town Close, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 12 Mar 2025 at 06:26.

Anglian Water logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Essex Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Essex Street, St Stephen, Norwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 19 Feb 2025 at 07:52.

Anglian Water logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Essex Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Essex Street, St Stephen, Norwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 12 Mar 2025 at 06:25.

Cadent Gas logo
On
7 May 2025
Details
View Map
Share
Follow
Caistor Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Caistor Lane, Caistor St Edmund.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 7 May 2025 and are due to last for only one day. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 06:37.

Cadent Gas logo
On
7 May 2025
Details
View Map
Share
Caistor Lane

Cadent Gas were proposing to carry out Utility repair and maintenance works on Caistor Lane, Caistor St Edmund.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 7 May 2025 The works were due to impact the verge only.

This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 10:35.

Cityfibre Metro Networks logo
Between
8 and 16 May 2025
Details
View Map
Share
Follow
Bergh Apton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bergh Apton Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 08:42.

Cityfibre Metro Networks logo
Between
8 and 16 May 2025
Details
View Map
Share
Follow
Bergh Apton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bergh Apton Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:33.

Cityfibre Metro Networks logo
Between
8 and 16 May 2025
Details
View Map
Share
Bergh Apton Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Bergh Apton Road, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 May 2025 and run through until 16 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:13.

Cityfibre Metro Networks logo
Between
8 and 16 May 2025
Details
View Map
Share
Follow
Bergh Apton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bergh Apton Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 15:18.

Cityfibre Metro Networks logo
Between
13 and 19 May 2025
Details
View Map
Share
Follow
Mill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mill Lane, Bramerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 19 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Mar 2025 at 15:22.

Cityfibre Metro Networks logo
Between
15 and 23 May 2025
Details
View Map
Share
Follow
Back Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Back Road, Yelverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 08:53.

Cityfibre Metro Networks logo
Between
15 and 23 May 2025
Details
View Map
Share
Follow
Back Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Back Road, Yelverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:33.

Cityfibre Metro Networks logo
Between
15 and 23 May 2025
Details
View Map
Share
Back Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Back Road, Yelverton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:13.

Cityfibre Metro Networks logo
Between
15 and 30 May 2025
Details
View Map
Share
Follow
Back Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Back Road, Yelverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 15:19.

Cityfibre Metro Networks logo
Between
16 and 30 May 2025
Details
View Map
Share
Follow
Church Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Road, Yelverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Mar 2025 at 10:58.

Norfolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Martineau Lane

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Martineau Lane, Lakenham, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 9 Dec 2024 at 13:23.

Norfolk County Council logo
Between
19 and 24 May 2025
Details
View Map
Share
Follow
Bracondale

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Bracondale, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 9 Dec 2024 at 13:24.

Cityfibre Metro Networks logo
Between
20 and 27 May 2025
Details
View Map
Share
Follow
Sallow Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sallow Lane, Framingham Pigot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 27 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Mar 2025 at 15:23.

Cityfibre Metro Networks logo
Between
20 and 27 May 2025
Details
View Map
Share
Follow
Sallow Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sallow Lane, Kirby Bedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 27 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Mar 2025 at 15:22.

Cityfibre Metro Networks logo
Between
27 May and 2 Jun 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on The Street, Kirby Bedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Mar 2025 at 15:24.

Cityfibre Metro Networks logo
Between
29 May and 13 Jun 2025
Details
View Map
Share
Follow
Easthill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Easthill Lane, Kirby Bedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 11:55.

Cityfibre Metro Networks logo
Between
29 May and 13 Jun 2025
Details
View Map
Share
Follow
Easthill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Easthill Lane, Kirby Bedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:31.

Cityfibre Metro Networks logo
Between
29 May and 13 Jun 2025
Details
View Map
Share
Follow
Easthill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Easthill Lane, Kirby Bedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 15:19.

Cityfibre Metro Networks logo
Between
29 May and 13 Jun 2025
Details
View Map
Share
Easthill Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Easthill Lane, Kirby Bedon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:29.

Cityfibre Metro Networks logo
Between
29 May and 13 Jun 2025
Details
View Map
Share
Easthill Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Easthill Lane, Kirby Bedon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Mar 2025 at 14:40.

Anglian Water logo
Between
2 and 8 Jun 2025
Details
View Map
Share
Follow
Barrett Road

Anglian Water are proposing to carry out Remedial works on Barrett Road, Lakenham, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 29 Jan 2025 at 09:11.

Norfolk County Council logo
LONG TERM
Between
2 Jun and 25 Aug 2025
Details
View Map
Share
Follow
Yarmouth Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Yarmouth Road, Thorpe St Andrew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 7 Mar 2025 at 15:35.

Norfolk County Council logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
City Road

Norfolk County Council are proposing to carry out Highway improvement works on City Road, Lakenham, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 26 Feb 2025 at 13:23.

Anglian Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Cotman Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Cotman Road, Thorpe Hamlet, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Mar 2025 at 09:50.

Virgin Media logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Queen Street

Virgin Media are proposing to carry out Utility asset works on Queen Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Feb 2025 at 12:20.

Anglian Water logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Cotman Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Cotman Road, Thorpe Hamlet, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Mar 2025 at 15:37.

Cityfibre Metro Networks logo
Between
12 and 20 Jun 2025
Details
View Map
Share
Surlingham Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Surlingham Road, Bramerton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Mar 2025 at 14:41.

Anglian Water logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Peckover Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Peckover Road, Eaton, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 13 Mar 2025 at 09:58.

Cityfibre Metro Networks logo
Between
19 and 27 Jun 2025
Details
View Map
Share
Follow
Mill Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mill Hill, Bramerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:51.

Cityfibre Metro Networks logo
Between
19 and 27 Jun 2025
Details
View Map
Share
Follow
Mill Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mill Hill, Bramerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 13:50.

Cityfibre Metro Networks logo
Between
19 and 27 Jun 2025
Details
View Map
Share
Mill Hill

Cityfibre Metro Networks were proposing to carry out Utility asset works on Mill Hill, Bramerton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:17.

Cityfibre Metro Networks logo
Between
19 and 27 Jun 2025
Details
View Map
Share
Mill Hill

Cityfibre Metro Networks were proposing to carry out Utility asset works on Mill Hill, Bramerton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Mar 2025 at 14:41.


Roadworks Map near to Mill Green, NORWICH, NR14 8PB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Mar 2025 07:27
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Mill Green, NORWICH, NR14 8PB (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.