ROADWORKS SUMMARY
Cromes Oak Close, NORWICH, NR14 7JY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cromes Oak Close, NR14 7JY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cromes Oak Close, NORWICH, NR14 7JY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cromes Oak Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Between
18 Sep 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Hall Road

Cadent Gas are proposing to carry out Utility asset works on Hall Road, Norwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 10:01.

Cadent Gas logo
LONG TERM
Between
25 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Gowing Road

Cadent Gas are proposing to carry out Utility asset works on Gowing Road, Mulbarton.

These works are categorised as Major.

The works will start on or after 25 November 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 17:00.

Cadent Gas logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Gowing Road

Cadent Gas are carrying out Utility asset works on Gowing Road, Mulbarton.

These works are categorised as Major.

The works started on 25 November 2024 at 11:20 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 08:38.

UK Power Networks Eastern & London logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Long Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Long Road, Framingham Earl.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 08:24.

UK Power Networks Eastern & London logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Long Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Long Road, Framingham Earl.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 08:06.

Cityfibre Metro Networks logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brooke Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Brooke Road, Shotesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 29 Oct 2024 at 15:34.

Cityfibre Metro Networks logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brooke Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Brooke Road, Shotesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Nov 2024 at 15:51.

Norfolk County Council logo
LONG TERM
Between
1 Jan and 7 Aug 2025
Details
View Map
Share
St Andrews Street

Norfolk County Council were proposing to carry out Highway improvement works on St Andrews Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 25 Sep 2024 at 15:57.

Anglian Water logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Dover Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Dover Street, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 20 Feb 2024 at 08:06.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
New Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on New Road, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Oct 2024 at 07:38.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Slade Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Slade Lane, Framingham Pigot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Nov 2024 at 14:00.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Ipswich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Ipswich Road, Keswick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 18 Sep 2024 at 10:23.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Long Lane

Cadent Gas are proposing to carry out Utility asset works on Long Lane, Mulbarton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:22.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mill Lane, Bramerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Nov 2024 at 14:00.

Cityfibre Metro Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sallow Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sallow Lane, Framingham Pigot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Nov 2024 at 13:59.

Cadent Gas logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Ipswich Road

Cadent Gas are proposing to carry out Utility asset works on Ipswich Road, Eaton, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:32.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Maid Marian Road

Cadent Gas are proposing to carry out Utility asset works on Maid Marian Road, Town Close, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 07:19.

Cityfibre Metro Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sallow Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sallow Lane, Kirby Bedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Nov 2024 at 13:59.

Cityfibre Metro Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Surlingham Fp1

Cityfibre Metro Networks are proposing to carry out Utility asset works on Surlingham Fp1, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Nov 2024 at 14:56.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Rosary Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Rosary Road, Thorpe Hamlet, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Sep 2024 at 12:38.

BT logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
Guildhall Hill

BT are proposing to carry out Utility repair and maintenance works on Guildhall Hill, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Nov 2024 at 09:36.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Rectory Lane

Cadent Gas are proposing to carry out Utility asset works on Rectory Lane, Mulbarton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:21.

Anglian Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Newmarket Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Newmarket Road, Cringleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 2 Oct 2024 at 06:29.

Cityfibre Metro Networks logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Pratts Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Pratts Hill, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 09:14.

Anglian Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Church Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Road, Woodton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 17 Oct 2024 at 12:06.

Cityfibre Metro Networks logo
Between
23 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Walnut Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Walnut Hill, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 09:13.

Anglian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Lane, Claxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 17 Oct 2024 at 11:27.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 10:50.

Anglian Water logo
LONG TERM
Between
27 Jan and 3 Mar 2025
Details
View Map
Share
Warwick Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Warwick Street, Nelson, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 16:01.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Spelman Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Spelman Road, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 10:01.

Anglian Water logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Rupert Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Rupert Street, St Stephen, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 10:08.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Ber Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Ber Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 30 Oct 2024 at 09:29.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Eaton Road

Cadent Gas are proposing to carry out Utility asset works on Eaton Road, Eaton, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:31.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Tuckswood Lane

Cadent Gas are proposing to carry out Utility asset works on Tuckswood Lane, Town Close, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:32.

Norfolk County Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Stoke Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Stoke Road, Arminghall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 19 Nov 2024 at 15:20.

Cityfibre Metro Networks logo
Between
6 and 12 Feb 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:23.

UK Power Networks Eastern & London logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Whitehall Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Whitehall Road, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 12:30.

Cityfibre Metro Networks logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Bramerton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bramerton Road, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:25.

BT logo
Between
14 and 21 Feb 2025
Details
View Map
Share
Follow
Castle Meadow

BT are proposing to carry out Utility repair and maintenance works on Castle Meadow, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Nov 2024 at 15:03.

BT logo
Between
14 and 21 Feb 2025
Details
View Map
Share
Follow
Castle Meadow

BT are proposing to carry out Utility repair and maintenance works on Castle Meadow, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Nov 2024 at 09:00.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Rose Valley

Anglian Water are proposing to carry out roadworks on Rose Valley, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 07:15.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 10:54.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Nov 2024 at 10:43.

Cityfibre Metro Networks logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Bramerton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bramerton Road, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 09:13.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Yarmouth Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Yarmouth Road, Thorpe St Andrew.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 10 Sep 2024 at 11:55.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Yarmouth Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Yarmouth Road, Thorpe St Andrew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 10 Sep 2024 at 13:39.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Ring Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Ring Road, Thorpe St Andrew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 10 Jun 2024 at 14:07.

Cityfibre Metro Networks logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Pond Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Pond Lane, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 09:14.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Dussindale Drive

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Dussindale Drive, Thorpe St Andrew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 10 Jun 2024 at 14:07.

Cityfibre Metro Networks logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 11:17.

UK Power Networks Eastern & London logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Whitehall Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Whitehall Road, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 12:09.


Roadworks Map near to Cromes Oak Close, NORWICH, NR14 7JY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Dec 2024 01:36
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cromes Oak Close, NORWICH, NR14 7JY (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
THE STREET 
(0.5 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 3 Dec 2024 - 5 Dec 2024
0.5
Details
Share
Follow
2
BT logo
STOKE ROAD 
(0.6 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 3 Dec 2024 - 5 Dec 2024
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.