ROADWORKS SUMMARY
Elm Close, NORWICH, NR14 6LG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Elm Close, NR14 6LG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Elm Close, NORWICH, NR14 6LG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Elm Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are carrying out Utility asset works on The Street, Rockland St Mary.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 10:00 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Mar 2025 at 10:18.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 11:17.

Cityfibre Metro Networks logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Surlingham Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Surlingham Lane, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 5 Feb 2025 at 15:54.

Cityfibre Metro Networks logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Surlingham Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Surlingham Lane, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:41.

Cityfibre Metro Networks logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Surlingham Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Surlingham Lane, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 11:37.

BT logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Rookery Hill

BT are proposing to carry out Utility asset works on Rookery Hill, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Dec 2024 at 08:40.

BT logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
School Lane

BT are proposing to carry out Utility asset works on School Lane, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Dec 2024 at 08:39.

BT logo
Between
11 and 13 Mar 2025
Details
View Map
Share
School Lane

BT were proposing to carry out Utility asset works on School Lane, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 16 Dec 2024 at 08:07.

BT logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Rookery Hill

BT were proposing to carry out Utility asset works on Rookery Hill, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 16 Dec 2024 at 08:09.

BT logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
The Street

BT are proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Dec 2024 at 08:39.

BT logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
The Street

BT are proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Dec 2024 at 08:38.

BT logo
Between
11 and 13 Mar 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 16 Dec 2024 at 08:05.

BT logo
Between
11 and 13 Mar 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 16 Dec 2024 at 08:04.

Cityfibre Metro Networks logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Surlingham Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Surlingham Lane, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 11:42.

Cityfibre Metro Networks logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Surlingham Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Surlingham Lane, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 5 Feb 2025 at 15:54.

Cityfibre Metro Networks logo
Between
19 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Lower Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lower Road, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 2 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 11:04.

Cityfibre Metro Networks logo
Between
19 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Lower Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lower Road, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 2 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:40.

Cityfibre Metro Networks logo
Between
19 Mar and 2 Apr 2025
Details
View Map
Share
Follow
New Inn Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on New Inn Hill, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 2 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 11:04.

Cityfibre Metro Networks logo
Between
19 Mar and 2 Apr 2025
Details
View Map
Share
Follow
New Inn Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on New Inn Hill, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 2 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:40.

Norfolk County Council logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Norwich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Norwich Road, Woodton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 18 Feb 2025 at 15:33.

Norfolk County Council logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Norwich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Norwich Road, Woodton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 4 Feb 2025 at 10:06.

Norfolk County Council logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Norwich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Norwich Road, Woodton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 20 Nov 2024 at 12:49.

Norfolk County Council logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Norwich Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Norwich Road, Woodton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 1 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 4 Feb 2025 at 09:50.

Norfolk County Council logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Norwich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Norwich Road, Kirstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 20 Nov 2024 at 12:49.

Norfolk County Council logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Norwich Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Norwich Road, Kirstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 1 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 4 Feb 2025 at 09:50.

Norfolk County Council logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Norwich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Norwich Road, Kirstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 4 Feb 2025 at 10:08.

Norfolk County Council logo
Between
24 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Norwich Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Norwich Road, Kirstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 18 Feb 2025 at 15:26.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:32.

Cityfibre Metro Networks logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
New Inn Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on New Inn Hill, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Feb 2025 at 15:10.

Cityfibre Metro Networks logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Lower Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lower Road, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Feb 2025 at 15:11.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 07:57.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Burgate Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Burgate Lane, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:11.

Cityfibre Metro Networks logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Burgate Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Burgate Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 15:16.

Cityfibre Metro Networks logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Hellington Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hellington Hill, Hellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 10:28.

Cityfibre Metro Networks logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
Run Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Run Lane, Hellington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 09:04.

Cityfibre Metro Networks logo
Between
10 and 18 Apr 2025
Details
View Map
Share
Reeders Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on Reeders Lane, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:12.

Cityfibre Metro Networks logo
Between
10 and 18 Apr 2025
Details
View Map
Share
Follow
Reeders Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Reeders Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 08:17.

Cityfibre Metro Networks logo
Between
10 and 18 Apr 2025
Details
View Map
Share
Follow
Reeders Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Reeders Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:32.

Cityfibre Metro Networks logo
Between
10 and 18 Apr 2025
Details
View Map
Share
Follow
Reeders Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Reeders Lane, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 15:17.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Follow
Wheel Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wheel Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:33.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Follow
Wheel Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wheel Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 08:27.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Wheel Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Wheel Road, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Feb 2025 at 08:20.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Follow
Wheel Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wheel Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 15:10.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Follow
Wheel Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wheel Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Feb 2025 at 09:02.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Wheel Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Wheel Road, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Feb 2025 at 13:32.

Cityfibre Metro Networks logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Wheel Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Wheel Road, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:09.

Cityfibre Metro Networks logo
Between
8 and 16 May 2025
Details
View Map
Share
Follow
Bergh Apton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bergh Apton Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 15:18.

Cityfibre Metro Networks logo
Between
8 and 16 May 2025
Details
View Map
Share
Bergh Apton Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Bergh Apton Road, Alpington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 May 2025 and run through until 16 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:13.

Cityfibre Metro Networks logo
Between
8 and 16 May 2025
Details
View Map
Share
Follow
Bergh Apton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bergh Apton Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:33.

Cityfibre Metro Networks logo
Between
8 and 16 May 2025
Details
View Map
Share
Follow
Bergh Apton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bergh Apton Road, Alpington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 16 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 08:42.

Anglian Water logo
Between
14 and 16 May 2025
Details
View Map
Share
Bungay Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Bungay Road, Thwaite.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 24 Feb 2025 at 09:21.

Cityfibre Metro Networks logo
Between
15 and 30 May 2025
Details
View Map
Share
Follow
Back Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Back Road, Yelverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 15:19.

Cityfibre Metro Networks logo
Between
15 and 23 May 2025
Details
View Map
Share
Follow
Back Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Back Road, Yelverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 08:53.

Cityfibre Metro Networks logo
Between
15 and 23 May 2025
Details
View Map
Share
Follow
Back Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Back Road, Yelverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Feb 2025 at 12:33.

Cityfibre Metro Networks logo
Between
15 and 23 May 2025
Details
View Map
Share
Back Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Back Road, Yelverton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Feb 2025 at 13:13.

Cityfibre Metro Networks logo
Between
16 and 30 May 2025
Details
View Map
Share
Follow
Church Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Road, Yelverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Mar 2025 at 10:58.


Roadworks Map near to Elm Close, NORWICH, NR14 6LG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Mar 2025 10:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Elm Close, NORWICH, NR14 6LG (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cityfibre Metro Networks logo
HIGH STREET 
(0.4 miles)
Cityfibre Metro Networks
Utility asset works - Carriageway, Verge - Two-way signals
Planned
Scheduled: 4 Mar 2025 - 6 Mar 2025
0.4
Details
Share
Follow
2
Norfolk County Council logo
HIGH BUNGAY ROAD 
(0.4 miles)
Norfolk County Council
Highway repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 3 Mar 2025 - 5 Mar 2025
0.4
Details
Share
Follow
3
Cadent Gas logo
LANGLEY ROAD 
(0.8 miles)
Cadent Gas
New service connection - Footway, Carriageway, Verge - Give and take
Complete
27 Feb 2025 09:31 - 3 Mar 2025 14:55
0.8
Details
Share