ROADWORKS SUMMARY
Oaks Lane, NORWICH, NR13 5HD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Oaks Lane, NR13 5HD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Oaks Lane, NORWICH, NR13 5HD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Oaks Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Waterlow

National Highways are carrying out Highway improvement works on Waterlow, Blofield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 00:01 and could run through until 30 June 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 5 Feb 2024 at 16:03.

National Highways logo
LONG TERM
Until
30 May 2026
Details
View Map
Share
Follow
Lingwood Lane

National Highways are carrying out Highway improvement works on Lingwood Lane, North Burlingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 00:01 and could run through until 30 May 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 5 Feb 2024 at 16:05.

National Highways logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Lingwood Road

National Highways are carrying out Highway improvement works on Lingwood Road, North Burlingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 00:01 and could run through until 30 June 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 5 Feb 2024 at 16:04.

National Highways logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
High Noon Lane

National Highways are carrying out Highway improvement works on High Noon Lane, Blofield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 15:30 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 31 Mar 2024 at 11:40.

National Highways logo
LONG TERM
Between
1 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Lingwood Road

National Highways are proposing to carry out Highway improvement works on Lingwood Road, North Burlingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 29 Jul 2024 at 15:28.

National Highways logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Lingwood Road

National Highways are carrying out Highway improvement works on Lingwood Road, North Burlingham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 August 2024 at 06:30 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 1 Aug 2024 at 13:42.

National Highways logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Waterlow

National Highways are carrying out Highway improvement works on Waterlow, Blofield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 August 2024 at 06:30 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 1 Aug 2024 at 13:42.

Cadent Gas logo
LONG TERM
Between
18 Sep 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Hall Road

Cadent Gas are proposing to carry out Utility asset works on Hall Road, Norwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 10:01.

Cadent Gas logo
LONG TERM
Between
30 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Salhouse Road

Cadent Gas are proposing to carry out Utility asset works on Salhouse Road, Sprowston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 10:51.

Anglian Water logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Lincoln Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Lincoln Street, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 15 Feb 2024 at 16:00.

Anglian Water logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Lincoln Street

Anglian Water are carrying out Utility repair and maintenance works on Lincoln Street, Nelson, Norwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 07:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 21 Oct 2024 at 08:28.

Cadent Gas logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Avian Way

Cadent Gas were proposing to carry out Utility asset works on Avian Way, Sprowston.

These works were categorised as Major.

The works were originally planned to start 28 October 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 08:57.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
The Paddocks

Cadent Gas are carrying out Utility asset works on The Paddocks, Old Catton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 06:31 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:44.

Cadent Gas logo
LONG TERM
Between
7 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Spixworth Road

Cadent Gas are proposing to carry out Utility asset works on Spixworth Road, Old Catton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 15:27.

Cadent Gas logo
LONG TERM
Between
7 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Spixworth Road

Cadent Gas are proposing to carry out Utility asset works on Spixworth Road, Old Catton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:27.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 4 Mar 2025
Details
View Map
Share
Follow
Spixworth Road

Cadent Gas are proposing to carry out Utility asset works on Spixworth Road, Old Catton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:28.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 4 Mar 2025
Details
View Map
Share
Follow
Spixworth Road

Cadent Gas are proposing to carry out Utility asset works on Spixworth Road, Old Catton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:18.

Cadent Gas logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Spixworth Road

Cadent Gas are carrying out Utility asset works on Spixworth Road, Old Catton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 12:52 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:29.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Patteson Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Patteson Road, Coslany, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 7 Aug 2024 at 08:02.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Patteson Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Patteson Road, Coslany, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 8 Aug 2024 at 07:05.

Norfolk County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Patteson Road

Norfolk County Council are carrying out Highway repair and maintenance works on Patteson Road, Coslany, Norwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 18 Nov 2024 at 09:15.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Waterloo Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Waterloo Road, Coslany, Norwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 7 Aug 2024 at 08:03.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Shipstone Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Shipstone Road, Coslany, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 24 Oct 2024 at 11:58.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Shipstone Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Shipstone Road, Coslany, Norwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 7 Aug 2024 at 08:03.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Angel Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Angel Road, Coslany, Norwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 27 Aug 2024 at 13:46.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Angel Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Angel Road, Coslany, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 24 Oct 2024 at 11:58.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Waterloo Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Waterloo Road, Coslany, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 7 Aug 2024 at 08:01.

Norfolk County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Waterloo Road

Norfolk County Council are carrying out Highway repair and maintenance works on Waterloo Road, Coslany, Norwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 18 Nov 2024 at 09:16.

Norfolk County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Waterloo Road

Norfolk County Council are carrying out Highway repair and maintenance works on Waterloo Road, Coslany, Norwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 18 Nov 2024 at 09:17.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Patteson Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Patteson Road, Coslany, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 24 Oct 2024 at 11:59.

Norfolk County Council logo
LONG TERM
Between
18 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Waterloo Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Waterloo Road, Coslany, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 24 Oct 2024 at 11:58.

Norfolk County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Angel Road

Norfolk County Council are carrying out Highway repair and maintenance works on Angel Road, Coslany, Norwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 18 Nov 2024 at 09:17.

Cityfibre Metro Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Salhouse Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Salhouse Road, Little Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Oct 2024 at 13:57.

Cadent Gas logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Spixworth Road

Cadent Gas are proposing to carry out Utility asset works on Spixworth Road, Old Catton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:06.

UK Power Networks Eastern & London logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Long Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Long Road, Framingham Earl.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 08:06.

UK Power Networks Eastern & London logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Long Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Long Road, Framingham Earl.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 08:24.

Cityfibre Metro Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Salhouse Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Salhouse Road, Little Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 23 Oct 2024 at 13:57.

Norfolk County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
School Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on School Road, Little Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 3 Dec 2024 at 10:44.

Norfolk County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
School Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on School Road, Little Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 14:20.

Norfolk County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Salhouse Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Salhouse Road, Little Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 14:19.

Norfolk County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Salhouse Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Salhouse Road, Little Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 15:04.

Norfolk County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Hospital Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Hospital Road, Little Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 14:18.

Norfolk County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Hospital Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Hospital Road, Little Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 15:04.

Norfolk County Council logo
LONG TERM
Between
1 Jan and 7 Aug 2025
Details
View Map
Share
St Andrews Street

Norfolk County Council were proposing to carry out Highway improvement works on St Andrews Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 25 Sep 2024 at 15:57.

Norfolk County Council logo
LONG TERM
Between
1 Jan and 7 Aug 2025
Details
View Map
Share
St Benedicts Street

Norfolk County Council were proposing to carry out Highway improvement works on St Benedicts Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 25 Sep 2024 at 15:57.

Norfolk County Council logo
LONG TERM
Between
1 Jan and 7 Aug 2025
Details
View Map
Share
Duke Street

Norfolk County Council were proposing to carry out Highway improvement works on Duke Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 25 Sep 2024 at 15:56.

Anglian Water logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Dover Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Dover Street, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 20 Feb 2024 at 08:06.

Norfolk County Council logo
LONG TERM
Between
2 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tills Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Tills Road, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 1 Nov 2024 at 14:33.

Norfolk County Council logo
LONG TERM
Between
2 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Lowry Cole Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Lowry Cole Road, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 1 Nov 2024 at 14:33.

Norfolk County Council logo
LONG TERM
Between
2 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Addey Close

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Addey Close, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 1 Nov 2024 at 14:35.

Norfolk County Council logo
LONG TERM
Between
2 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Rayns Close

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Rayns Close, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 1 Nov 2024 at 14:34.

Vodafone logo
Between
5 and 7 Jan 2025
Details
View Map
Share
Follow
Chartwell Road

Vodafone are proposing to carry out Utility asset works on Chartwell Road, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 7 January 2025. The works will impact the verge only.

This roadwork event was last updated by Vodafone on 14 Oct 2024 at 07:24.

Vodafone logo
Between
5 and 7 Jan 2025
Details
View Map
Share
Follow
Chartwell Road

Vodafone are proposing to carry out Utility asset works on Chartwell Road, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 7 January 2025. The works will impact the verge only.

This roadwork event was last updated by Vodafone on 28 Nov 2024 at 10:28.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Slade Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Slade Lane, Framingham Pigot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Nov 2024 at 14:00.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mill Lane, Bramerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Nov 2024 at 14:00.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
New Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on New Road, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Oct 2024 at 07:38.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Grapes Hill

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Grapes Hill, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:52.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
St Benedicts Street

Norfolk County Council are proposing to carry out Highway repair and maintenance works on St Benedicts Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:53.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Valentine Street

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Valentine Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:54.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Golding Place

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Golding Place, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:53.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Barn Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Barn Road, Heigham, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:51.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Raglan Street

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Raglan Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 26 Nov 2024 at 07:29.

Norfolk County Council logo
LONG TERM
Between
6 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Dereham Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Dereham Road, Heigham, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 2 Dec 2024 at 09:51.

Cityfibre Metro Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Magdalen Street

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Magdalen Street, Norwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Dec 2024 at 12:55.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Wall Road

BT were proposing to carry out Utility asset works on Wall Road, Coslany, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 12 Sep 2024 at 12:50.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Spixworth Road

Cadent Gas are proposing to carry out Utility asset works on Spixworth Road, Old Catton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 16:16.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Grapes Hill

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Grapes Hill, Mancroft, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 16 Oct 2024 at 13:03.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Grapes Hill

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Grapes Hill, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:56.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
St Benedicts Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on St Benedicts Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:56.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Barn Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Barn Road, Heigham, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 16 Oct 2024 at 13:01.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Valentine Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Valentine Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:57.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Raglan Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Raglan Street, Mancroft, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 16 Oct 2024 at 12:59.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Golding Place

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Golding Place, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:57.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Barn Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Barn Road, Heigham, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:55.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Raglan Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Raglan Street, Mancroft, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:55.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Dereham Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Dereham Road, Heigham, Norwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 16 Oct 2024 at 12:57.

Norfolk County Council logo
LONG TERM
Between
7 Jan and 28 Apr 2025
Details
View Map
Share
Dereham Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Dereham Road, Heigham, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 28 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Norfolk County Council on 25 Nov 2024 at 14:54.

Vodafone logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Chartwell Road

Vodafone are proposing to carry out Utility asset works on Chartwell Road, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by Vodafone on 9 Oct 2024 at 07:09.

Cityfibre Metro Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sallow Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sallow Lane, Framingham Pigot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Nov 2024 at 13:59.

Cityfibre Metro Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sallow Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sallow Lane, Kirby Bedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Nov 2024 at 13:59.

Cadent Gas logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Ipswich Road

Cadent Gas are proposing to carry out Utility asset works on Ipswich Road, Eaton, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:32.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Maid Marian Road

Cadent Gas are proposing to carry out Utility asset works on Maid Marian Road, Town Close, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 07:19.

Cityfibre Metro Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Surlingham Fp1

Cityfibre Metro Networks are proposing to carry out Utility asset works on Surlingham Fp1, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Nov 2024 at 14:56.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Rosary Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Rosary Road, Thorpe Hamlet, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Sep 2024 at 12:38.

BT logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
Guildhall Hill

BT are proposing to carry out Utility repair and maintenance works on Guildhall Hill, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Nov 2024 at 09:36.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Hemblington Hall Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Hemblington Hall Road, Hemblington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 9 Oct 2024 at 08:41.

Cityfibre Metro Networks logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
Lower Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lower Street, Salhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 27 Nov 2024 at 08:13.

Anglian Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Aylsham Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Aylsham Road, Coslany, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 09:44.

Cityfibre Metro Networks logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Pratts Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Pratts Hill, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 09:14.

Anglian Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Plantation Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Plantation Road, Blofield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 14:23.

Cityfibre Metro Networks logo
Between
23 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Walnut Hill

Cityfibre Metro Networks are proposing to carry out Utility asset works on Walnut Hill, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 09:13.

Cadent Gas logo
Between
23 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Greyfriars Close

Cadent Gas are proposing to carry out Utility asset works on Greyfriars Close, Old Catton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 13:46.

Cadent Gas logo
Between
23 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Greyfriars Close

Cadent Gas are proposing to carry out Utility asset works on Greyfriars Close, Old Catton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:42.

Anglian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Lane, Claxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 17 Oct 2024 at 11:27.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 10:50.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Tuckswood Lane

Cadent Gas are proposing to carry out Utility asset works on Tuckswood Lane, Town Close, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:32.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Eaton Road

Cadent Gas are proposing to carry out Utility asset works on Eaton Road, Eaton, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:31.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Ber Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Ber Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 30 Oct 2024 at 09:29.

Anglian Water logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Rupert Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Rupert Street, St Stephen, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 10:08.

Anglian Water logo
LONG TERM
Between
27 Jan and 3 Mar 2025
Details
View Map
Share
Warwick Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Warwick Street, Nelson, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 16:01.

Norfolk County Council logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Stoke Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Stoke Road, Arminghall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 19 Nov 2024 at 15:20.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Lishman Road Footpath East Side To Sale Road

Cadent Gas are proposing to carry out Utility asset works on Lishman Road Footpath East Side To Sale Road, Norwich.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 14:42.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Woodside Road

Cadent Gas are proposing to carry out Utility asset works on Woodside Road, Sprowston.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 15:43.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sprowston Road

Cadent Gas are proposing to carry out Utility asset works on Sprowston Road, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 12:38.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sprowston Road

Cadent Gas are proposing to carry out Utility asset works on Sprowston Road, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:57.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Mousehold Lane

Cadent Gas are proposing to carry out Utility asset works on Mousehold Lane, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 12:38.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Mousehold Lane

Cadent Gas are proposing to carry out Utility asset works on Mousehold Lane, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:58.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Wroxham Road

Cadent Gas are proposing to carry out Utility asset works on Wroxham Road, Sprowston.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 09:48.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Wroxham Road

Cadent Gas are proposing to carry out Utility asset works on Wroxham Road, Sprowston.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 16:08.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Chartwell Road

Cadent Gas are proposing to carry out Utility asset works on Chartwell Road, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 12:37.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Chartwell Road

Cadent Gas are proposing to carry out Utility asset works on Chartwell Road, Norwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:58.

UK Power Networks Eastern & London logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
School Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on School Lane, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 14:18.

Cityfibre Metro Networks logo
Between
6 and 12 Feb 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:23.

UK Power Networks Eastern & London logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Whitehall Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Whitehall Road, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 12:30.

Cadent Gas logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Borrowdale Drive

Cadent Gas are proposing to carry out New service connection on Borrowdale Drive, Crome, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 08:22.

Anglian Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Sprowston Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Sprowston Road, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 February 2025 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 11:37.

Cityfibre Metro Networks logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Bramerton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bramerton Road, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 08:25.

BT logo
Between
14 and 21 Feb 2025
Details
View Map
Share
Follow
Castle Meadow

BT are proposing to carry out Utility repair and maintenance works on Castle Meadow, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Nov 2024 at 15:03.

BT logo
Between
14 and 21 Feb 2025
Details
View Map
Share
Follow
Castle Meadow

BT are proposing to carry out Utility repair and maintenance works on Castle Meadow, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Nov 2024 at 09:00.

Norfolk County Council logo
Between
15 and 21 Feb 2025
Details
View Map
Share
Sprowston Road

Norfolk County Council were proposing to carry out Highway improvement works on Sprowston Road, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 21 February 2025. The works were due to impact the footway only.

This roadwork event was last updated by Norfolk County Council on 28 Oct 2024 at 10:56.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Nov 2024 at 10:43.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 10:54.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Rose Valley

Anglian Water are proposing to carry out roadworks on Rose Valley, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 07:15.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Plantation Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Plantation Road, Blofield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 17:33.

BT logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Wall Road

BT were proposing to carry out Utility asset works on Wall Road, Coslany, Norwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Nov 2024 at 14:37.

Cadent Gas logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Wroxham Road

Cadent Gas are proposing to carry out Utility asset works on Wroxham Road, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 10:37.

Cadent Gas logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Wroxham Road

Cadent Gas were proposing to carry out Utility asset works on Wroxham Road, Sprowston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 07:45.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Street

Cadent Gas are proposing to carry out New service connection on Lower Street, Salhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:55.

Cityfibre Metro Networks logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Bramerton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Bramerton Road, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 09:13.

UK Power Networks Eastern & London logo
Between
18 and 27 Feb 2025
Details
View Map
Share
Follow
Oak Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Oak Street, Mancroft, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 07:51.

Anglian Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Lodge Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Lodge Lane, Old Catton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Dec 2024 at 10:40.

Cadent Gas logo
Between
20 and 22 Feb 2025
Details
View Map
Share
Follow
Norwich Road

Cadent Gas are proposing to carry out New service connection on Norwich Road, Lingwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 14:46.

Cityfibre Metro Networks logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Pond Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Pond Lane, Surlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 09:14.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Yarmouth Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Yarmouth Road, Thorpe St Andrew.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 10 Sep 2024 at 11:55.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Yarmouth Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Yarmouth Road, Thorpe St Andrew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Norfolk County Council on 10 Sep 2024 at 13:39.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Ring Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Ring Road, Thorpe St Andrew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 10 Jun 2024 at 14:07.

Norfolk County Council logo
LONG TERM
Between
24 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Dussindale Drive

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Dussindale Drive, Thorpe St Andrew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 10 Jun 2024 at 14:07.

Cadent Gas logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Glenburn Avenue

Cadent Gas are proposing to carry out Utility asset works on Glenburn Avenue, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 16:30.

Cityfibre Metro Networks logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
The Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on The Street, Rockland St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 11:17.

Anglian Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Hare Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Hare Road, Great Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Dec 2024 at 10:42.

Norfolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Constitution Hill

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Constitution Hill, Coslany, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 15 Nov 2024 at 11:20.

Norfolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Chartwell Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Chartwell Road, Sprowston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 15 Nov 2024 at 11:24.

Norfolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Chartwell Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Chartwell Road, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 15 Nov 2024 at 12:07.

Norfolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Chartwell Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Chartwell Road, Old Catton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 15 Nov 2024 at 11:27.

Norfolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Chartwell Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Chartwell Road, Old Catton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 15 Nov 2024 at 12:07.

Norfolk County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Constitution Hill

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Constitution Hill, Old Catton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 15 Nov 2024 at 14:30.

Cadent Gas logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Fairstead Road

Cadent Gas are proposing to carry out Utility asset works on Fairstead Road, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:28.

Cadent Gas logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Russell Avenue

Cadent Gas are proposing to carry out Utility asset works on Russell Avenue, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 17:00.

Cadent Gas logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Allens Avenue

Cadent Gas are proposing to carry out Utility asset works on Allens Avenue, Sprowston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 17:30.

UK Power Networks Eastern & London logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Whitehall Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Whitehall Road, Nelson, Norwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 12:09.


Roadworks Map near to Oaks Lane, NORWICH, NR13 5HD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Dec 2024 01:36
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Oaks Lane, NORWICH, NR13 5HD (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.