ROADWORKS SUMMARY
Glover Road, NR13 3FQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Glover Road, NR13 3FQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Glover Road, NR13 3FQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Glover Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Lingwood Road

National Highways are carrying out Highway improvement works on Lingwood Road, North Burlingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 00:01 and could run through until 30 June 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 5 Feb 2024 at 16:04.

National Highways logo
LONG TERM
Until
30 May 2026
Details
View Map
Share
Follow
Lingwood Lane

National Highways are carrying out Highway improvement works on Lingwood Lane, North Burlingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 00:01 and could run through until 30 May 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 5 Feb 2024 at 16:05.

National Highways logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Waterlow

National Highways are carrying out Highway improvement works on Waterlow, Blofield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 00:01 and could run through until 30 June 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 5 Feb 2024 at 16:03.

National Highways logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
High Noon Lane

National Highways are carrying out Highway improvement works on High Noon Lane, Blofield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 15:30 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 31 Mar 2024 at 11:40.

Cadent Gas logo
LONG TERM
Between
14 Feb and 9 May 2025
Details
View Map
Share
Follow
The Dales

Cadent Gas are proposing to carry out Utility asset works on The Dales, Brundall.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 14 February 2025 and could run through until 9 May 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 15:08.

Cadent Gas logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Highfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Highfield Avenue, Brundall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 15:15.

Norfolk County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Main Road A1064

Norfolk County Council are carrying out Highway repair and maintenance works on Main Road A1064, Fleggburgh.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 21:00 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 4 Mar 2025 at 08:04.

Anglian Water logo
Tomorrow
Details
View Map
Share
Buckenham Road

Anglian Water carried out roadworks on Buckenham Road, Lingwood.

The road was closed for some or all of the period.

The works were originally planned between 27 Feb 2025 and 5 Mar 2025 and were actually completed between 27 Feb 2025 (08:00) and 4 Mar 2025 (10:28). The works impacted the verge only.

This roadwork event was last updated by Anglian Water on 4 Mar 2025 at 11:59.

Cadent Gas logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
A47 From J A12 To J A1064

Cadent Gas are proposing to carry out Utility asset works on A47 From J A12 To J A1064, Broadland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:19.

Cadent Gas logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
A47 From J A12 To J A1064

Cadent Gas are proposing to carry out Utility asset works on A47 From J A12 To J A1064, Broadland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 13:26.

Cadent Gas logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
A47 From J A12 To J A1064

Cadent Gas are proposing to carry out Utility asset works on A47 From J A12 To J A1064, Broadland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 13:57.

Cadent Gas logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
A47 From J A12 To J A1064

Cadent Gas are proposing to carry out Utility asset works on A47 From J A12 To J A1064, Broadland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 13:00.

Norfolk County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Yarmouth Road

Norfolk County Council are proposing to carry out Highway repair and maintenance works on Yarmouth Road, Brundall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 17 Jan 2025 at 14:53.

Cityfibre Metro Networks logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Horning Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Horning Road, Woodbastwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Jan 2025 at 13:18.

Cityfibre Metro Networks logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Horning Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Horning Road, Woodbastwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 3 Mar 2025 at 12:35.

Cadent Gas logo
LONG TERM
Between
17 Mar and 25 Apr 2025
Details
View Map
Share
Blofield Road

Cadent Gas were proposing to carry out Utility asset works on Blofield Road, Brundall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 11:32.

Anglian Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Mill Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Mill Road, Halvergate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Dec 2024 at 08:27.

Cadent Gas logo
Between
19 and 22 Mar 2025
Details
View Map
Share
Follow
A47 From J A12 To J A1064

Cadent Gas are proposing to carry out Utility asset works on A47 From J A12 To J A1064, Broadland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 22 March 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 09:55.

Between
24 and 27 Mar 2025
Details
View Map
Share
Heath Road

Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Heath Road, Rollesby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jan 2025 at 09:19.

Cadent Gas logo
LONG TERM
Between
24 Mar and 2 May 2025
Details
View Map
Share
Follow
Blofield Road

Cadent Gas are proposing to carry out Utility asset works on Blofield Road, Brundall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 10:59.

Cadent Gas logo
LONG TERM
Between
24 Mar and 2 May 2025
Details
View Map
Share
Follow
Blofield Road

Cadent Gas are proposing to carry out Utility asset works on Blofield Road, Brundall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 12:19.

Norfolk County Council logo
Between
4 and 15 Apr 2025
Details
View Map
Share
Norwich Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Norwich Road, Acle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 April 2025 and run through until 15 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 8 Aug 2024 at 15:44.

Norfolk County Council logo
Between
4 and 15 Apr 2025
Details
View Map
Share
The Street

Norfolk County Council were proposing to carry out Highway repair and maintenance works on The Street, Acle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 April 2025 and run through until 15 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 8 Aug 2024 at 15:45.

Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Heath Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Heath Road, Rollesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 30 Jan 2025 at 11:22.

Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Heath Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Heath Road, Rollesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 10 Feb 2025 at 08:05.

Cadent Gas logo
LONG TERM
Between
14 Apr and 16 May 2025
Details
View Map
Share
Strumpshaw Road

Cadent Gas were proposing to carry out Utility asset works on Strumpshaw Road, Brundall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 10:55.

Cadent Gas logo
Between
14 Apr and 9 May 2025
Details
View Map
Share
Follow
Strumpshaw Road

Cadent Gas are proposing to carry out Utility asset works on Strumpshaw Road, Brundall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:57.

Cadent Gas logo
Between
14 Apr and 9 May 2025
Details
View Map
Share
Follow
Strumpshaw Road

Cadent Gas are proposing to carry out Utility asset works on Strumpshaw Road, Brundall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Feb 2025 at 08:21.

Anglian Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Buckenham Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Buckenham Road, Lingwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 7 Feb 2025 at 11:15.

Cadent Gas logo
LONG TERM
Between
2 May and 6 Jun 2025
Details
View Map
Share
The Street

Cadent Gas were proposing to carry out Utility asset works on The Street, Brundall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 11:00.

Cadent Gas logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
The Street

Cadent Gas are proposing to carry out Utility asset works on The Street, Brundall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Feb 2025 at 08:23.

UK Power Networks Eastern & London logo
Between
20 and 26 May 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Main Road, Filby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 26 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 09:49.

Cadent Gas logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Brundall Road

Cadent Gas were proposing to carry out Utility asset works on Brundall Road, Blofield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 11:10.

Norfolk County Council logo
Between
30 May and 1 Jun 2025
Details
View Map
Share
Main Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Main Road, Rollesby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 May 2025 and run through until 1 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 24 Feb 2025 at 16:43.

Norfolk County Council logo
Between
30 May and 1 Jun 2025
Details
View Map
Share
Main Road

Norfolk County Council were proposing to carry out Highway repair and maintenance works on Main Road, Repps With Bastwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 May 2025 and run through until 1 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Norfolk County Council on 24 Feb 2025 at 16:43.


Roadworks Map near to Glover Road, NR13 3FQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Mar 2025 11:44
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Glover Road, NR13 3FQ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
EMERGENCY
  
THE STREET 
(0.3 miles)
Anglian Water
Utility repair and maintenance works - Footway, Carriageway, Verge - Two-way signals
Complete
27 Feb 2025 10:30 - 13:00
0.3
Details
Share
2
Cityfibre Metro Networks logo
SOUTHEND 
(1.0 miles)
Cityfibre Metro Networks
Utility asset works - Carriageway, Verge - Stop/go boards
Planned
Scheduled: 5 Mar 2025 - 7 Mar 2025
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.