ROADWORKS SUMMARY
Gannet Lane, WELLINGBOROUGH, NN8 4NW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Gannet Lane, NN8 4NW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Gannet Lane, WELLINGBOROUGH, NN8 4NW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Gannet Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Northamptonshire Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Ditchford Lane

North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Wellingborough.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:47.

North Northamptonshire Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Ditchford Lane

North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Rushden.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:48.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Gleneagles Drive

Cadent Gas are proposing to carry out Utility asset works on Gleneagles Drive, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 13:48.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Cross Road

Cadent Gas are carrying out Utility asset works on Cross Road, Wellingborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 16:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 16:12.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Gold Street

Cadent Gas are carrying out Utility asset works on Gold Street, Wellingborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:50 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:00.

Cadent Gas logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
West Street

Cadent Gas are carrying out Utility asset works on West Street, Wellingborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 18:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 14:07.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Gold Street

Cadent Gas are carrying out Utility asset works on Gold Street, Wellingborough.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:50 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 08:58.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Finedon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 13:34.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Ranelagh Road

Cadent Gas are proposing to carry out Utility asset works on Ranelagh Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:36.

Cadent Gas logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Gleneagles Drive

Cadent Gas are carrying out Utility asset works on Gleneagles Drive, Wellingborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 09:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 09:46.

Cadent Gas logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Palk Road

Cadent Gas are proposing to carry out Utility asset works on Palk Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:44.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Berry Green Road

Cadent Gas are proposing to carry out Utility asset works on Berry Green Road, Finedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 13:40.

Anglian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Harrowden Lane

Anglian Water are carrying out Utility repair and maintenance works on Harrowden Lane, Finedon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 17:30 and could run through until 16 December 2024. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 10 Dec 2024 at 11:45.

Cadent Gas logo
Until
24 Dec 2024
Details
View Map
Share
Follow
Ranelagh Road

Cadent Gas are carrying out Utility asset works on Ranelagh Road, Wellingborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 11:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 12:27.

Cadent Gas logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Berry Green Road

Cadent Gas are carrying out Utility asset works on Berry Green Road, Finedon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 10:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:22.

Cadent Gas logo
Until
24 Dec 2024
Details
View Map
Share
Follow
Palk Road

Cadent Gas are carrying out Utility asset works on Palk Road, Wellingborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 11:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 12:26.

Cadent Gas logo
Between
2 and 24 Dec 2024
Details
View Map
Share
Follow
Stanley Road

Cadent Gas are proposing to carry out Utility asset works on Stanley Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:47.

Cadent Gas logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are carrying out Utility asset works on Avenue Road, Finedon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 10:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:22.

Cadent Gas logo
Between
4 and 24 Dec 2024
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Finedon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:00.

Cadent Gas logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Church Hill

Cadent Gas are carrying out Utility asset works on Church Hill, Finedon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 08:30 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:18.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Stanley Road

Cadent Gas are proposing to carry out Utility asset works on Stanley Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 09:08.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wollaston Road

Cadent Gas are carrying out Utility repair and maintenance works on Wollaston Road, Irchester.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 14:58 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 15:29.

BT logo
Finishing
Tomorrow
Details
View Map
Share
A45 From J A5028 To J A509/b573 W

BT were proposing to carry out Utility asset works on A45 From J A5028 To J A509/b573 W, East Northamptonshire.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Dec 2024 at 16:04.

BT logo
Finishing
Tomorrow
Details
View Map
Share
A45 From J A5028 To J A509/b573 W

BT were proposing to carry out Utility asset works on A45 From J A5028 To J A509/b573 W, East Northamptonshire.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2024 at 09:32.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
A45 From J A5028 To J A509/b573 W

BT are proposing to carry out Utility asset works on A45 From J A5028 To J A509/b573 W, East Northamptonshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2024 at 09:51.

West Northamptonshire Council logo
Between
11 and 23 Dec 2024
Details
View Map
Share
Follow
Overstone Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Overstone Road, Sywell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 13 Aug 2024 at 15:44.

North Northamptonshire Council logo
Between
16 and 24 Dec 2024
Details
View Map
Share
Glenfield Drive

North Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Glenfield Drive, Great Doddington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 24 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 18 Oct 2024 at 16:12.

West Northamptonshire Council logo
Between
2 and 14 Jan 2025
Details
View Map
Share
Overstone Road

West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Overstone Road, Sywell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 31 Oct 2024 at 09:40.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Finedon Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Finedon Road, Burton Latimer.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Dec 2024 at 10:25.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:24.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Finedon Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Finedon Road, Burton Latimer.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Sep 2024 at 10:35.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:45.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Finedon Road

Cadent Gas were proposing to carry out Utility asset works on Finedon Road, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:14.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:42.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Cannon Street

Cadent Gas were proposing to carry out Utility asset works on Cannon Street, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:41.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Coffee Tavern Lane

Cadent Gas are proposing to carry out Utility asset works on Coffee Tavern Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:38.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Lilley Terrace

Anglian Water are proposing to carry out Utility repair and maintenance works on Lilley Terrace, Irthlingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 9 Oct 2024 at 08:17.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Coffee Tavern Lane

Cadent Gas are proposing to carry out Utility asset works on Coffee Tavern Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:40.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Doddington Road

Cadent Gas are proposing to carry out Utility asset works on Doddington Road, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:43.

Anglian Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Mill Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 08:31.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Allen Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Allen Road, Irthlingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Oct 2024 at 09:33.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Broadway

Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:41.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Broadway

Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:51.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Swanspool Parade

Cadent Gas are proposing to carry out Utility asset works on Swanspool Parade, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:37.

North Northamptonshire Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Windmill Banks

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Windmill Banks, Higham Ferrers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 17 Oct 2024 at 09:36.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:50.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:34.

Anglian Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 09:02.

Anglian Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Harborough Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Harborough Road, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 09:46.

Anglian Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Westfield Place

Anglian Water are proposing to carry out Utility repair and maintenance works on Westfield Place, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 09:27.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Ditchford Lane

BT were proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Dec 2024 at 15:26.

Western Power Distribution (East Midlands) logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Hertford Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Hertford Road, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 12:07.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Ditchford Lane

BT were proposing to carry out Utility asset works on Ditchford Lane, Rushden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Dec 2024 at 15:26.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Sussex Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Sussex Road, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 12:05.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Patrick Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Patrick Road, Kettering.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 12:05.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Finedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:49.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Northumberland Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Northumberland Road, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 12:05.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Patrick Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Patrick Road, Kettering.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 Oct 2024 at 12:43.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Sussex Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Sussex Road, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 Oct 2024 at 12:43.

Cadent Gas logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
A6 Irthlingborough Bypass

Cadent Gas are proposing to carry out Utility asset works on A6 Irthlingborough Bypass, Irthlingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:46.

Cadent Gas logo
Between
15 and 28 Feb 2025
Details
View Map
Share
Follow
Irchester Road

Cadent Gas are proposing to carry out Utility asset works on Irchester Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 09:18.

Cadent Gas logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
The Pyghtle

Cadent Gas are proposing to carry out Utility asset works on The Pyghtle, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 11:51.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
24 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Lancaster Way

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lancaster Way, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Nov 2024 at 09:21.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
24 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Fosse Green

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Fosse Green, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Nov 2024 at 09:24.

Anglian Water logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Earls Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 15:33.

Cadent Gas logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Meeting Lane

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Meeting Lane, Burton Latimer.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:14.

North Northamptonshire Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Warkton Lane

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Warkton Lane, Kettering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 2 Dec 2024 at 10:22.

North Northamptonshire Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Poplars Farm Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Poplars Farm Road, Kettering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 2 Dec 2024 at 10:25.

BT logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Dec 2024 at 15:28.

BT logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Dec 2024 at 15:28.

Anglian Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Chace Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Chace Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 15:22.

Anglian Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Moor Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Moor Road, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 12:47.

North Northamptonshire Council logo
Between
6 and 9 Mar 2025
Details
View Map
Share
Follow
A6 Higham Ferrers Bypass

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on A6 Higham Ferrers Bypass, Higham Ferrers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 9 Dec 2024 at 15:57.

Western Power Distribution (East Midlands) logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
High Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Dec 2024 at 11:45.


Roadworks Map near to Gannet Lane, WELLINGBOROUGH, NN8 4NW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 22:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Gannet Lane, WELLINGBOROUGH, NN8 4NW (33 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
North Northamptonshire Council logo
URGENT
  
GANNET LANE 
(0.0 miles)
North Northamptonshire Council
Highway repair and maintenance works - Carriageway -
Complete
11 Dec 2024 07:43 - 08:40
0.0
Details
Share
2
North Northamptonshire Council logo
URGENT
  
GANNET LANE 
(0.0 miles)
North Northamptonshire Council
Highway repair and maintenance works - Carriageway -
Complete
11 Dec 2024 07:46 - 08:55
0.0
Details
Share
3
Anglian Water logo
FULMAR LANE FOOTPATHS 
(0.1 miles)
Anglian Water
Utility repair and maintenance works - Verge, Footpath - No carriageway incursion
In Progress
Since: 10 Dec 2024 08:06
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
0.1
Details
Share
Follow
4
BT logo
STEWARTS ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway, Verge - Give and take
In Progress
Since: 10 Dec 2024 14:18
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
0.2
Details
Share
Follow
5
Cadent Gas logo
NEST LANE 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 28 Nov 2024 09:00
(Scheduled: 26 Nov 2024 - 11 Dec 2024)
0.4
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
CROSS ROAD 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 18 Nov 2024 16:00
(Scheduled: 18 Nov 2024 - 13 Dec 2024)
0.4
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
GOLD STREET 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 18 Nov 2024 08:50
(Scheduled: 18 Nov 2024 - 11 Dec 2024)
0.5
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
EASTFIELD ROAD 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Verge - No carriageway incursion
In Progress
Since: 22 Oct 2024 08:30
(Scheduled: 21 Oct 2024 - 24 Dec 2024)
0.5
Details
Share
Follow
9
Anglian Water logo
BRADFIELD CLOSE 
(0.5 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
9 Dec 2024 14:36 - 15:18
0.5
Details
Share
10
Anglian Water logo
OAK VIEW 
(0.6 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 12 Dec 2024 - 16 Dec 2024
0.6
Details
Share
Follow
  • ...