ROADWORKS SUMMARY
Brampton Way, NORTHAMPTON, NN6 9NJ
Introduction
View current and future planned roadworks and road closures for Brampton Way, NN6 9NJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Brampton Way, NORTHAMPTON, NN6 9NJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brampton Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
25 Dec 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Brampton Lane, Pitsford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 17:00 and could run through until 25 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 27 Nov 2024 at 10:38.
Tuesday
Cadent Gas are carrying out Utility asset works on Welland Way, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 14:00 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 15:55.
3 Mar 2025
West Northamptonshire Council are carrying out Highway repair and maintenance works on Brixworth Road, Spratton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 12:15 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 5 Dec 2024 at 10:11.
3 Mar 2025
West Northamptonshire Council are carrying out Highway repair and maintenance works on Spratton Road, Brixworth.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 12:15 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 5 Dec 2024 at 10:21.
2 and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Welland Way, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:06.
Monday
Cadent Gas are proposing to carry out Utility asset works on East Oval, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:07.
Monday
Cadent Gas are proposing to carry out Utility asset works on East Oval, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 07:29.
31 May 2025
West Northamptonshire Council are carrying out Highway repair and maintenance works on Sandy Lane, Chapel Brampton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 09:30 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 10 Dec 2024 at 11:57.
9 Dec 2024 and 8 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on The Green, Kingsthorpe, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:30.
30 Dec 2024
Cadent Gas are carrying out Utility asset works on The Green, Kingsthorpe, Northampton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 11:50 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 11:55.
Today
Anglian Water were proposing to carry out Utility repair and maintenance works on Overstone Road, Moulton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 12 Sep 2024 at 13:46.
Sunday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Holcot Road, Walgrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 25 Sep 2024 at 10:37.
Sunday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Walgrave Road, Holcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 25 Sep 2024 at 10:35.
11 and 23 Dec 2024
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Sywell Road, Overstone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 31 Oct 2024 at 09:40.
Tuesday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Brixworth Road, Spratton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 18 Sep 2024 at 11:54.
17 and 23 Dec 2024
Anglian Water were proposing to carry out Utility repair and maintenance works on Harlestone Road, Harlestone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:19.
2 and 4 Jan 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Guilsborough Road, Ravensthorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 11 Oct 2024 at 10:23.
2 and 5 Jan 2025
North Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Guilsborough Road, Ravensthorpe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 5 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 14 Oct 2024 at 08:40.
6 and 16 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Humfrey Lane, Boughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Sep 2024 at 10:27.
13 Jan and 22 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on C204 Northampton Road, Harlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 Oct 2024 at 09:28.
13 and 17 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Old Road, Lamport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 13 Nov 2024 at 09:49.
13 and 17 Jan 2025
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Old Road, Lamport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 16 Oct 2024 at 12:43.
13 and 17 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Lamport Road, Scaldwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 13 Nov 2024 at 16:13.
13 Jan and 22 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Harlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 Oct 2024 at 09:28.
13 Jan and 22 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harlestone Road, Harlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 Oct 2024 at 09:27.
20 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Kingsthorpe, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:25.
20 and 28 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Harlestone Road, Harlestone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 10:15.
20 and 28 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Harlestone Road, Harlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:32.
22 and 24 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Acre Lane, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 12 Sep 2024 at 12:08.
27 and 31 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Chapel Brampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 22 Nov 2024 at 09:14.
27 and 31 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Spratton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 22 Nov 2024 at 09:16.
28 and 30 Jan 2025
Anglian Water are proposing to carry out Remedial works on Nortoft, Guilsborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Nov 2024 at 14:36.
28 and 30 Jan 2025
Anglian Water are proposing to carry out Remedial works on Nortoft, Guilsborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 08:23.
31 Jan and 6 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harborough Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 16 Aug 2024 at 09:06.
3 and 5 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Poplars Lane, Holcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:52.
3 and 5 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Watermeadow Drive, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 10:36.
6 and 11 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harlestone Road, Harlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 11 Nov 2024 at 10:07.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Overstone Road, Moulton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 09:46.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Brixworth Road, Spratton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 25 Sep 2024 at 10:44.
21 and 24 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on C204 Northampton Road, Harlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 9 Oct 2024 at 09:50.
21 and 24 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Harlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 9 Oct 2024 at 09:43.
24 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Spratton Road, Brixworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 22 Nov 2024 at 15:25.
3 and 7 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Brixworth Road, Spratton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 3 Dec 2024 at 09:54.
3 and 14 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Creaton Road, Teeton, Hollowell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 5 Dec 2024 at 10:59.
3 and 14 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Teeton Lane, Creaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 5 Dec 2024 at 10:59.
3 and 7 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Spratton Road, Brixworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 3 Dec 2024 at 10:00.
5 Mar and 5 Oct 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Chapel Brampton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 6 Dec 2024 at 14:07.
11 and 13 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kenmuir Avenue, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 13 Nov 2024 at 08:58.
Roadworks Map near to Brampton Way, NORTHAMPTON, NN6 9NJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Brampton Way, NORTHAMPTON, NN6 9NJ (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 27 Nov 2024 - 3 Mar 2025)
(Scheduled: 27 Nov 2024 - 3 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.