ROADWORKS SUMMARY
Balmoral Close, NORTHAMPTON, NN6 0LZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Balmoral Close, NN6 0LZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Balmoral Close, NORTHAMPTON, NN6 0LZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Balmoral Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Until
30 Jan 2025
Details
View Map
Share
Follow
Stanley Road

Cadent Gas are carrying out Utility asset works on Stanley Road, Wellingborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 15:45 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 17:24.

West Northamptonshire Council logo
Between
2 and 14 Jan 2025
Details
View Map
Share
Overstone Road

West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Overstone Road, Sywell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 31 Oct 2024 at 09:40.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Doddington Road

Cadent Gas are proposing to carry out Utility asset works on Doddington Road, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:43.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:20.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:24.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:34.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:46.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:31.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Cannon Street

Cadent Gas were proposing to carry out Utility asset works on Cannon Street, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:41.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Wellingborough Road

Cadent Gas were proposing to carry out Utility asset works on Wellingborough Road, Northampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 10:34.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Finedon Road

Cadent Gas were proposing to carry out Utility asset works on Finedon Road, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:14.

Cadent Gas logo
Until
31 Jan 2025
Details
View Map
Share
Follow
Doddington Road

Cadent Gas are carrying out Utility asset works on Doddington Road, Wellingborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 13:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 13:20.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Cherry Tree Lane

BT are proposing to carry out Utility asset works on Cherry Tree Lane, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Oct 2024 at 12:18.

Anglian Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Mill Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 11:26.

Anglian Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Mill Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 08:31.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Broadway

Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 13:08.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
High Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Ecton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Nov 2024 at 10:04.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
High Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Ecton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Oct 2024 at 09:29.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Swanspool Parade

Cadent Gas are proposing to carry out Utility asset works on Swanspool Parade, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:37.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:50.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 13:10.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Broadway

Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:51.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Broadway

Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:41.

Cityfibre Metro Networks logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Grendon Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Grendon Road, Castle Ashby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 12:50.

Cityfibre Metro Networks logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Grendon Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Grendon Road, Castle Ashby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Oct 2024 at 06:22.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 13:04.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:34.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wellingborough Road

Cadent Gas are proposing to carry out Utility asset works on Wellingborough Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:42.

Anglian Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 09:02.

Anglian Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 31 Dec 2024 at 09:16.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wildacre Drive

Cadent Gas are proposing to carry out Utility asset works on Wildacre Drive, Billing, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:27.

Anglian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
London Road

Anglian Water are proposing to carry out Utility repair and maintenance works on London Road, Bozeat.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 23 Dec 2024 at 11:43.

West Northamptonshire Council logo
Between
30 Jan and 24 Feb 2025
Details
View Map
Share
Follow
St Peters Way

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on St Peters Way, Cogenhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 10 Oct 2024 at 07:21.

West Northamptonshire Council logo
Between
30 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Nene Rise

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Nene Rise, Cogenhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 10 Oct 2024 at 07:17.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Standing Stones

Cadent Gas are proposing to carry out Utility asset works on Standing Stones, Billing, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:30.

Cadent Gas logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Cottage Gardens

Cadent Gas are proposing to carry out Utility asset works on Cottage Gardens, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:29.

West Northamptonshire Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Watermeadow Drive

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Watermeadow Drive, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 10:36.

West Northamptonshire Council logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Wellingborough Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Wellingborough Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 5 Dec 2024 at 16:19.

Cadent Gas logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
The Pyghtle

Cadent Gas are proposing to carry out Utility asset works on The Pyghtle, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 11:51.

Cadent Gas logo
Between
15 and 28 Feb 2025
Details
View Map
Share
Follow
Irchester Road

Cadent Gas are proposing to carry out Utility asset works on Irchester Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 09:18.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Overstone Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Overstone Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 09:46.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:10.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:40.

Cadent Gas logo
LONG TERM
Between
24 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Wellingborough Road

Cadent Gas are proposing to carry out Utility asset works on Wellingborough Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:52.

Anglian Water logo
Between
24 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Earls Barton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Earls Barton Road, Mears Ashby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 17 Dec 2024 at 14:57.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:40.

Cadent Gas logo
Between
24 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Fir Tree Walk

Cadent Gas are proposing to carry out Utility asset works on Fir Tree Walk, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:55.

Anglian Water logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Earls Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Dec 2024 at 09:52.

Cadent Gas logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Moulton Way

Cadent Gas are proposing to carry out Utility asset works on Moulton Way, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 15:41.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Booth Lane North

Cadent Gas are proposing to carry out Utility asset works on Booth Lane North, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 15:52.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Rowan Avenue

Cadent Gas are proposing to carry out Utility asset works on Rowan Avenue, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:05.

Anglian Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Wollaston Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Wollaston Road, Hinwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 20 Dec 2024 at 09:37.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Kettering Road North

Cadent Gas are proposing to carry out Utility asset works on Kettering Road North, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 15:59.

Anglian Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Chace Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Chace Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 12 Dec 2024 at 09:01.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Churchill Avenue

Cadent Gas are proposing to carry out Utility asset works on Churchill Avenue, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 15:44.

Cadent Gas logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Kettering Road North

Cadent Gas are proposing to carry out Utility asset works on Kettering Road North, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 15:56.

Western Power Distribution (East Midlands) logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
High Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Jan 2025 at 08:10.

Anglian Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Ridgeway

Anglian Water are proposing to carry out Utility repair and maintenance works on Ridgeway, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Nov 2024 at 11:50.

Cadent Gas logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Barley Hill Road

Cadent Gas are proposing to carry out Utility asset works on Barley Hill Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 07:04.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Farmhill Road

Cadent Gas are proposing to carry out Utility asset works on Farmhill Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 07:04.

West Northamptonshire Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Overstone Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Overstone Road, Sywell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 24 Oct 2024 at 14:50.

West Northamptonshire Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Sywell Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Sywell Road, Overstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Nov 2024 at 12:13.

West Northamptonshire Council logo
Between
1 and 4 Apr 2025
Details
View Map
Share
Follow
Grange Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Grange Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 24 Oct 2024 at 09:21.


Roadworks Map near to Balmoral Close, NORTHAMPTON, NN6 0LZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 6 Jan 2025 13:27
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Balmoral Close, NORTHAMPTON, NN6 0LZ (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
PARK STREET 
(0.6 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 6 Jan 2025 - 10 Jan 2025