ROADWORKS SUMMARY
Doctors Lane, WELLINGBOROUGH, NN29 7TW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Doctors Lane, NN29 7TW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Doctors Lane, WELLINGBOROUGH, NN29 7TW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Doctors Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Northamptonshire Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Ditchford Lane

North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Wellingborough.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:47.

North Northamptonshire Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Ditchford Lane

North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Rushden.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:48.

Cadent Gas logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Wellingborough Road

Cadent Gas are carrying out Utility asset works on Wellingborough Road, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 January 2025 at 09:20 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 11:25.

West Northamptonshire Council logo
Between
30 Jan and 24 Feb 2025
Details
View Map
Share
Follow
St Peters Way

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on St Peters Way, Cogenhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 10 Oct 2024 at 07:21.

West Northamptonshire Council logo
Between
30 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Nene Rise

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Nene Rise, Cogenhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 10 Oct 2024 at 07:17.

Cadent Gas logo
Until
20 Feb 2025
Details
View Map
Share
Follow
Cottage Gardens

Cadent Gas are carrying out Utility asset works on Cottage Gardens, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 15:20 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 15:30.

Cadent Gas logo
Until
26 Feb 2025
Details
View Map
Share
Follow
Standing Stones

Cadent Gas are carrying out Utility asset works on Standing Stones, Billing, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 15:20 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 15:28.

Cadent Gas logo
Between
15 and 28 Feb 2025
Details
View Map
Share
Follow
Irchester Road

Cadent Gas are proposing to carry out Utility asset works on Irchester Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 09:18.

Cadent Gas logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
The Pyghtle

Cadent Gas are proposing to carry out Utility asset works on The Pyghtle, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 08:45.

Cadent Gas logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
The Pyghtle

Cadent Gas are proposing to carry out Utility asset works on The Pyghtle, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 11:51.

Anglian Water logo
Between
24 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Earls Barton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Earls Barton Road, Mears Ashby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 9 Jan 2025 at 09:15.

Anglian Water logo
Between
24 Feb and 3 Mar 2025
Details
View Map
Share
Earls Barton Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Earls Barton Road, Mears Ashby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 12 Feb 2025 at 08:56.

Anglian Water logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Earls Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 5 Feb 2025 at 14:09.

Anglian Water logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Earls Barton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Dec 2024 at 09:52.

Anglian Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Wollaston Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Wollaston Road, Hinwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 20 Dec 2024 at 09:37.

BT logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Ditchford Lane

BT were proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 31 Dec 2024 at 10:38.

Anglian Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Moor Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Moor Road, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 12:47.

Anglian Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Chace Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Chace Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 12 Dec 2024 at 09:01.

BT logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Ditchford Lane

BT were proposing to carry out Utility asset works on Ditchford Lane, Rushden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Dec 2024 at 12:59.

Western Power Distribution (East Midlands) logo
Between
10 and 18 Mar 2025
Details
View Map
Share
Follow
High Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Feb 2025 at 15:20.

Western Power Distribution (East Midlands) logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
High Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Jan 2025 at 08:10.

Anglian Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Jan 2025 at 10:34.

Anglian Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Podington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Jan 2025 at 12:54.

West Northamptonshire Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Overstone Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Overstone Road, Sywell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 24 Oct 2024 at 14:50.

West Northamptonshire Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Sywell Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Sywell Road, Overstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Nov 2024 at 12:13.

Anglian Water logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Rushden Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Rushden Road, Wymington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 11 Dec 2024 at 16:04.

Anglian Water logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Rushden Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Rushden Road, Wymington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 15 Jan 2025 at 10:41.

Anglian Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Paddock Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Paddock Lane, Mears Ashby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 7 Jan 2025 at 10:39.

North Northamptonshire Council logo
LONG TERM
Between
14 Apr and 6 Jun 2025
Details
View Map
Share
Follow
Midland Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Midland Road, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 14 Jan 2025 at 10:07.

Anglian Water logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
Park Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Park Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Jan 2025 at 11:07.

Cadent Gas logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Mill Road

Cadent Gas are proposing to carry out Utility asset works on Mill Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 11:42.


Roadworks Map near to Doctors Lane, WELLINGBOROUGH, NN29 7TW (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Doctors Lane, WELLINGBOROUGH, NN29 7TW (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
THE RIDGE 
(0.3 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 14 Feb 2025 - 18 Feb 2025
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.