ROADWORKS SUMMARY
Harborough Road, NORTHAMPTON, NN2 8DL
Introduction
View current and future planned roadworks and road closures for Harborough Road, NN2 8DL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Harborough Road, NORTHAMPTON, NN2 8DL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Harborough Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Nov 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Fish Street, Northampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 06:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by West Northamptonshire Council on 3 Oct 2024 at 13:55.
30 Nov 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Abington Street, Northampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 06:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 25 Oct 2024 at 10:16.
30 Nov 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Dychurch Lane, Northampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 06:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 25 Oct 2024 at 10:17.
30 Nov 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Dychurch Lane, Northampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 06:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 25 Oct 2024 at 10:17.
30 Nov 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on The Riding, Northampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 06:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by West Northamptonshire Council on 25 Oct 2024 at 10:19.
30 Nov 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Abington Street, Northampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 06:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by West Northamptonshire Council on 25 Oct 2024 at 10:15.
8 Jun and 20 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Newport Pagnell Road, Northampton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Northamptonshire Council on 2 Apr 2024 at 09:49.
Today
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Harborough Road North, Boughton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 30 Aug 2024 at 12:54.
Today
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Brampton Lane, Boughton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 30 Aug 2024 at 12:50.
Today
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Brampton Lane, Boughton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 30 Aug 2024 at 12:47.
Today
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Harborough Road North, Boughton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 30 Aug 2024 at 12:53.
Today
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Vyse Road, Boughton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 30 Aug 2024 at 12:48.
Today
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Vyse Road, Boughton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 30 Aug 2024 at 12:51.
Today
Cadent Gas are proposing to carry out Utility asset works on Weedon Road, Upton, Northampton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:57.
23 Sep and 29 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Weedon Road, Upton, Northampton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:30.
Today
West Northamptonshire Council are carrying out Highway repair and maintenance works on Sheep Street, Northampton.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 October 2024 at 12:30 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Nov 2024 at 12:28.
Today
West Northamptonshire Council are carrying out Highway repair and maintenance works on Greyfriars, Northampton.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 October 2024 at 12:30 and could run through until 22 November 2024. The works will impact the verge only.
This roadwork event was last updated by West Northamptonshire Council on 15 Nov 2024 at 12:02.
Today
West Northamptonshire Council are carrying out Highway repair and maintenance works on Greyfriars, Northampton.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 October 2024 at 12:30 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Nov 2024 at 12:27.
Today
West Northamptonshire Council are carrying out Highway repair and maintenance works on Nene Rise, Cogenhoe.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 12 Nov 2024 at 10:35.
Today
West Northamptonshire Council are carrying out Highway repair and maintenance works on St Peters Way, Cogenhoe.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 12 Nov 2024 at 12:18.
20 Oct and 29 Nov 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Upper High Street, Harpole.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2024 and could run through until 29 November 2024. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 May 2024 at 08:45.
29 Nov 2024
Cadent Gas are carrying out Utility asset works on High Street, Upton, Northampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:15 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 10:04.
13 Dec 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Rushmere Road, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 21 Oct 2024 at 11:33.
13 Dec 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Billing Road, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 21 Oct 2024 at 11:32.
13 Dec 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Billing Road East, Northampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 21 Oct 2024 at 12:16.
13 Dec 2024
West Northamptonshire Council are carrying out Highway repair and maintenance works on Park Avenue South, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 21 Oct 2024 at 14:38.
21 Oct and 29 Nov 2024
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Upper High Street, West Northamptonshire, Harpole.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Aug 2024 at 14:45.
Today
Cadent Gas are carrying out Utility asset works on Millway, Northampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 12:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:46.
Today
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Manorfield Close, Northampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 22 November 2024. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Aug 2024 at 14:24.
Today
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Manorfield Road, Northampton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Aug 2024 at 14:24.
Today
Cadent Gas are proposing to carry out Utility asset works on St Peters Gardens, Weston Favell, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 08:25.
28 Oct and 1 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wellingborough Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:09.
28 Oct and 1 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Wellingborough Road, Northampton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 1 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 10:31.
Today
Cadent Gas are proposing to carry out Utility asset works on Tonmead Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 14:05.
4 and 29 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Wellingborough Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 09:31.
4 and 29 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Wellingborough Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:01.
29 Nov 2024
Cadent Gas are carrying out Utility asset works on Wellingborough Road, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 12:20 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:46.
4 Nov and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Wellingborough Road, Northampton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 14:12.
Today
Cadent Gas are proposing to carry out Utility asset works on Fir Tree Walk, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:49.
10 Dec 2024
Cadent Gas are carrying out Utility asset works on Chiltern Avenue, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 13:00 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 13:56.
Monday
Cadent Gas are proposing to carry out Utility asset works on Lime Avenue, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:13.
Monday
Cadent Gas are proposing to carry out Utility asset works on Lime Avenue, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:24.
Monday
Cadent Gas are carrying out Utility asset works on Lime Avenue, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:41.
Monday
Cadent Gas are proposing to carry out Utility asset works on Beech Avenue, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:11.
Monday
Cadent Gas are carrying out Utility asset works on Beech Avenue, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:44.
15 Nov 2024 and 13 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rushmere Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 11:21.
15 Nov 2024 and 13 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Billing Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 11:21.
15 Nov 2024 and 13 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Billing Road East, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 11:19.
15 Nov 2024 and 13 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Park Avenue South, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 11:25.
12 Dec 2024
Cadent Gas are carrying out Utility asset works on St Peters Gardens, Weston Favell, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 09:10 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:19.
18 Nov and 6 Dec 2024
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Weedon Road, Upton, Northampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 5 Aug 2024 at 15:09.
Monday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Weedon Road, Harpole.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 14 Aug 2024 at 07:13.
18 Nov and 6 Dec 2024
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Weedon Road, Harpole.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 5 Aug 2024 at 15:09.
Today
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Weedon Road, Upton, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Aug 2024 at 14:22.
18 Nov and 6 Dec 2024
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Weedon Road, Upton, Northampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 5 Aug 2024 at 15:10.
Today
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Weedon Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Aug 2024 at 14:24.
18 Nov and 6 Dec 2024
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Weedon Road, Northampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 5 Aug 2024 at 15:08.
Today
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Millway, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 13 Aug 2024 at 11:12.
18 Nov and 6 Dec 2024
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Millway, Northampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 5 Aug 2024 at 15:21.
18 Dec 2024
Cadent Gas are carrying out Utility asset works on Main Road, Duston, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 14:30 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:31.
18 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lime Avenue, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 09:37.
18 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lime Avenue, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:06.
18 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Birchfield Road East, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 09:38.
3 Dec 2024
Cadent Gas are carrying out Utility asset works on Birchfield Road East, Northampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 08:20 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 08:28.
18 Nov and 3 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Park Avenue North, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:14.
18 Nov and 3 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Park Avenue North, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:30.
18 Nov and 3 Dec 2024
Cadent Gas are proposing to carry out roadworks on Cedar Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 12:23.
18 Nov and 3 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cedar Road East, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 09:44.
18 Nov and 3 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cedar Road East, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 12:20.
18 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Birchfield Road East, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 10:06.
Wednesday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rothersthorpe Avenue, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 6 Aug 2024 at 13:32.
Wednesday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rothersthorpe Avenue, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 4 Nov 2024 at 12:53.
Wednesday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Clarke Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:30.
Wednesday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Clarke Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 08:55.
25 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on South Oval, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 08:49.
25 Nov and 17 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Welland Way, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 08:52.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on East Oval, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 08:50.
25 and 29 Nov 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harlestone Road, Harlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 2 Aug 2024 at 08:56.
25 and 29 Nov 2024
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Harlestone Road, Harlestone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 11 Nov 2024 at 09:39.
25 and 29 Nov 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harlestone Road, Harlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 13 Nov 2024 at 09:34.
28 and 30 Nov 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on A508 Brixworth Bypass, Brixworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 11 Oct 2024 at 09:19.
2 and 26 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Pembroke Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 26 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:22.
2 and 26 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Raynsford Road, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 26 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:07.
2 Dec 2024 and 1 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Gladstone Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:24.
2 and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Welland Way, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:06.
2 and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on East Oval, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:07.
2 and 5 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rothesay Terrace, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 1 Aug 2024 at 14:04.
2 and 4 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Billing Brook Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 14 Aug 2024 at 12:00.
2 and 4 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Billing Brook Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 11 Nov 2024 at 10:43.
2 and 6 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Brixworth Road, Spratton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Sep 2024 at 11:22.
3 and 5 Dec 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Hinton Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 27 Aug 2024 at 09:28.
3 and 5 Dec 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Hinton Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 09:39.
9 and 11 Dec 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Marefair, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 10 Sep 2024 at 11:03.
9 and 13 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rushmere Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 3 Sep 2024 at 16:58.
9 and 13 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Billing Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 3 Sep 2024 at 16:57.
9 and 13 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Park Avenue South, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 3 Sep 2024 at 16:57.
9 and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on South Oval, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:09.
9 and 11 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kenmuir Crescent, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 1 Aug 2024 at 14:02.
9 and 11 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kenmuir Crescent, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 18 Nov 2024 at 09:21.
9 Dec 2024 and 8 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on The Green, Kingsthorpe, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:30.
9 Dec 2024 and 8 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on The Green, Kingsthorpe, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 00:10.
9 and 11 Dec 2024
Anglian Water were proposing to carry out Utility repair and maintenance works on Brixworth Road, Spratton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 11 Sep 2024 at 12:43.
10 and 12 Dec 2024
Anglian Water were proposing to carry out Utility repair and maintenance works on Overstone Road, Moulton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 12 Sep 2024 at 13:46.
11 and 23 Dec 2024
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Sywell Road, Overstone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 31 Oct 2024 at 09:40.
11 and 23 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Overstone Road, Sywell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 13 Aug 2024 at 15:44.
11 and 15 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Walgrave Road, Holcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 25 Sep 2024 at 10:35.
13 and 17 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Brixworth Road, Spratton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 18 Sep 2024 at 11:54.
16 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pembroke Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:12.
16 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Raynsford Road, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:17.
16 Dec 2024 and 15 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Gladstone Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:13.
17 and 23 Dec 2024
Anglian Water were proposing to carry out Utility repair and maintenance works on Harlestone Road, Harlestone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:19.
2 and 14 Jan 2025
West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Overstone Road, Sywell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 31 Oct 2024 at 09:40.
4 and 6 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Brington Road, Althorp.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 16 Oct 2024 at 14:39.
6 Jan and 31 Aug 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Newport Pagnell Road, Northampton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Aug 2024 at 08:50.
6 and 10 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on The Green, Great Houghton, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 4 Oct 2024 at 13:19.
6 Jan and 3 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Weedon Road, Harpole.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 18 Nov 2024 at 05:54.
6 Jan and 1 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Ross Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 13:30.
6 and 28 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Weedon Road, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:00.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out New service connection on Whitworth Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:50.
6 Jan and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Harlestone Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 11:36.
6 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Wellingborough Road, Northampton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 10:34.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:31.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:46.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Dallington, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 12:22.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:34.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Park Drive, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 12:24.
6 and 16 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Humfrey Lane, Boughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Sep 2024 at 10:27.
7 and 9 Jan 2025
BT are proposing to carry out Utility asset works on Cherry Tree Lane, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 14 Oct 2024 at 12:18.
7 and 9 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Marefair, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 11 Sep 2024 at 10:06.
12 Jan and 2 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on St Peters Way, Northampton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Nov 2024 at 11:24.
13 and 17 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Salthouse Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 18 Sep 2024 at 11:23.
13 Jan and 1 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Duston Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 09:30.
13 Jan and 1 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Glasgow Street, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:16.
13 Jan and 22 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Harlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 Oct 2024 at 09:28.
13 Jan and 22 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on C204 Northampton Road, Harlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 Oct 2024 at 09:28.
13 and 24 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Ecton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 28 Oct 2024 at 09:29.
13 and 24 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Ecton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Nov 2024 at 10:04.
13 Jan and 22 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harlestone Road, Harlestone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 Oct 2024 at 09:27.
20 and 24 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Resthaven Road, Wootton, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 11:35.
20 Jan and 7 Feb 2025
West Northamptonshire Council are proposing to carry out Core Sampling on Rothersthorpe Road, Kislingbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Nov 2024 at 05:09.
20 and 24 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Spring Gardens, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 10:04.
20 and 24 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Derngate, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 09:53.
20 and 24 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Scholars Court, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 10:02.
20 and 24 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Hazelwood Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 10:00.
20 Jan and 9 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on St Crispin Drive, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 18 Oct 2024 at 10:24.
20 and 24 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Castilian Street, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 09:54.
20 and 24 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Derngate, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 09:58.
20 and 22 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Einstein Crescent, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 12:40.
20 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Kingsthorpe, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:30.
20 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wellingborough Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:42.
20 and 28 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Harlestone Road, Harlestone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 10:15.
20 and 28 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Harlestone Road, Harlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:32.
21 and 24 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Albion Place, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 09:51.
21 and 23 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Junction Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 13:08.
22 and 24 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Acre Lane, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 12 Sep 2024 at 12:08.
25 and 30 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Oxford Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 4 Nov 2024 at 09:43.
25 and 27 Jan 2025
ES Pipelines are proposing to carry out Utility asset works on Marefair, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ES Pipelines on 22 Nov 2024 at 10:24.
27 and 31 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Tollgate Way, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 09:24.
27 and 31 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Westgate Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 09:25.
27 and 29 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Oliver Street, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 13:09.
27 Jan and 18 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Highfield Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:21.
27 Jan and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Avenue North, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:30.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wildacre Drive, Billing, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:27.
27 and 31 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Chapel Brampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 22 Nov 2024 at 09:14.
27 and 31 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Spratton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 22 Nov 2024 at 09:16.
28 and 30 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on East Park Parade, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 11 Sep 2024 at 10:00.
29 and 31 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on High Street, Wootton, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 29 Oct 2024 at 08:23.
29 and 31 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chestnut Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 24 Oct 2024 at 09:59.
30 Jan and 24 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Nene Rise, Cogenhoe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 10 Oct 2024 at 07:17.
30 Jan and 24 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on St Peters Way, Cogenhoe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 10 Oct 2024 at 07:21.
31 Jan and 6 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kettering Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Aug 2024 at 14:26.
31 Jan and 6 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Park Avenue North, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 16 Aug 2024 at 09:04.
31 Jan and 6 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kenmuir Avenue, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Aug 2024 at 10:41.
31 Jan and 6 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harborough Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 16 Aug 2024 at 09:06.
1 and 3 Feb 2025
ES Pipelines are proposing to carry out Utility asset works on Marefair, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ES Pipelines on 22 Nov 2024 at 09:29.
2 Feb and 3 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Gas Street, Northampton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Nov 2024 at 11:25.
3 Feb and 1 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:30.
3 and 22 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Kingsley Park Terrace, Northampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:30.
3 and 7 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Meadow Close, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 24 Oct 2024 at 12:57.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Cottage Gardens, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:29.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Standing Stones, Billing, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:30.
3 and 5 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Watermeadow Drive, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 10:36.
3 and 5 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Poplars Lane, Holcot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:52.
4 and 6 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Milton Street, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 15:37.
5 and 7 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Berrywood Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 09:38.
6 and 11 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harlestone Road, Harlestone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 11 Nov 2024 at 10:07.
10 Feb and 3 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on The Green, Great Houghton, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 17 Oct 2024 at 15:33.
10 Feb and 31 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on St Peters Way, Northampton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Nov 2024 at 13:49.
10 Feb and 7 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kettering Road, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 19 Nov 2024 at 13:22.
10 Feb and 7 Mar 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Clare Street, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 19 Nov 2024 at 13:25.
10 and 15 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Clare Street, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 18 Oct 2024 at 10:21.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on East Park Parade, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:30.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Drive, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:22.
10 and 12 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Shelley Street, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 15:36.
10 and 15 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Wellingborough Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 15 Nov 2024 at 14:18.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Firsview Drive, Northampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 11:42.
17 and 19 Feb 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Quinton Road, Wootton, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 29 Oct 2024 at 15:51.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Byron Street, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 11:25.
17 and 20 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Balmoral Road, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 10:20.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Overstone Road, Moulton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 09:46.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Brixworth Road, Spratton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 25 Sep 2024 at 10:44.
19 and 22 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Edgar Mobbs Way, Northampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 18 Nov 2024 at 11:52.
Roadworks Map near to Harborough Road, NORTHAMPTON, NN2 8DL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Harborough Road, NORTHAMPTON, NN2 8DL (18 Events)
(Scheduled Dates)
(miles)
(Scheduled: 11 Nov 2024 - 25 Nov 2024)
(Scheduled: 15 Nov 2024 - 27 Nov 2024)
(Scheduled: 22 Nov 2024)
(Scheduled: 18 Nov 2024 - 2 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.