ROADWORKS SUMMARY
Bryant Road, KETTERING, NN15 6JD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bryant Road, NN15 6JD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bryant Road, KETTERING, NN15 6JD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bryant Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Northamptonshire Council logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Meeting Lane

North Northamptonshire Council are carrying out Highway repair and maintenance works on Meeting Lane, Kettering.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 October 2023 at 17:30 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 30 Apr 2024 at 13:51.

North Northamptonshire Council logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Jobs Yard

North Northamptonshire Council are carrying out Highway repair and maintenance works on Jobs Yard, Kettering.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 October 2023 at 17:30 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 30 Apr 2024 at 13:50.

Cadent Gas logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Gleneagles Drive

Cadent Gas are proposing to carry out Utility asset works on Gleneagles Drive, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 13:48.

Cadent Gas logo
Between
25 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Gleneagles Drive

Cadent Gas are proposing to carry out Utility asset works on Gleneagles Drive, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:33.

North Northamptonshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Stamford Road

North Northamptonshire Council are carrying out Highway repair and maintenance works on Stamford Road, Rushton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 20:00 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 26 Nov 2024 at 10:54.

North Northamptonshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Stamford Road

North Northamptonshire Council are carrying out Highway repair and maintenance works on Stamford Road, Rothwell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 20:00 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 26 Nov 2024 at 10:54.

North Northamptonshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Stamford Road

North Northamptonshire Council are carrying out Highway repair and maintenance works on Stamford Road, Thorpe Malsor.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 20:00 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 26 Nov 2024 at 10:49.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Berry Green Road

Cadent Gas are proposing to carry out Utility asset works on Berry Green Road, Finedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 13:40.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Finedon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 13:34.

Anglian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Cobden Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Cobden Street, Kettering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 24 Sep 2024 at 08:28.

Anglian Water logo
Finishing
Tomorrow
Details
View Map
Share
Cobden Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Cobden Street, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 17 Sep 2024 at 15:16.

Cadent Gas logo
Between
2 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Berry Green Road

Cadent Gas are proposing to carry out Utility asset works on Berry Green Road, Finedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 11:19.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Avenue Road

Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Finedon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 11:18.

Anglian Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Stamford Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Stamford Road, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 25 Oct 2024 at 08:55.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Finedon Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Finedon Road, Burton Latimer.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Oct 2024 at 14:08.

North Northamptonshire Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
New Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on New Road, Geddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 5 Sep 2024 at 14:32.

North Northamptonshire Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Grange Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Grange Road, Geddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 5 Sep 2024 at 14:31.

North Northamptonshire Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Queen Street

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Queen Street, Geddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 5 Sep 2024 at 14:30.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Finedon Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Finedon Road, Burton Latimer.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Sep 2024 at 10:35.

Western Power Distribution (East Midlands) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Bridleway Vd10 Glastonbury Close To Walsingham Avenue Footpath

Western Power Distribution (East Midlands) are proposing to carry out Remedial works on Bridleway Vd10 Glastonbury Close To Walsingham Avenue Footpath, Kettering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Sep 2024 at 15:02.

Virgin Media logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Lower Street

Virgin Media were proposing to carry out Utility asset works on Lower Street, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 6 Nov 2024 at 11:41.

North Northamptonshire Council logo
Between
18 and 20 Jan 2025
Details
View Map
Share
Follow
Stamford Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Stamford Road, Thorpe Malsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 25 Oct 2024 at 12:22.

North Northamptonshire Council logo
Between
18 and 20 Jan 2025
Details
View Map
Share
Follow
Stamford Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Stamford Road, Rothwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 25 Oct 2024 at 12:23.

North Northamptonshire Council logo
Between
18 and 20 Jan 2025
Details
View Map
Share
Follow
Stamford Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Stamford Road, Rushton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 25 Oct 2024 at 12:23.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellington Street

Cadent Gas are proposing to carry out Utility asset works on Wellington Street, Kettering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:30.

Anglian Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Newton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Newton Road, Geddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 08:01.

Anglian Water logo
Between
22 and 26 Jan 2025
Details
View Map
Share
Sheep Street

Anglian Water were proposing to carry out Utility repair and maintenance works on Sheep Street, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 26 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 23 Oct 2024 at 09:46.

Anglian Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Stamford Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Stamford Road, Kettering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 08:34.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Bath Road

Cadent Gas are proposing to carry out Utility asset works on Bath Road, Kettering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:30.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
St Peters Avenue

Anglian Water are proposing to carry out Utility repair and maintenance works on St Peters Avenue, Kettering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 08:39.

Anglian Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Remedial works on High Street, Twywell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Nov 2024 at 09:28.

Western Power Distribution (East Midlands) logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Hertford Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Hertford Road, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 12:07.

Cadent Gas logo
Between
3 and 26 Feb 2025
Details
View Map
Share
Follow
Lawson Street

Cadent Gas are proposing to carry out Utility asset works on Lawson Street, Kettering.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 16:00.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Kettering.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 16:00.

Anglian Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Loddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 09:10.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Patrick Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Patrick Road, Kettering.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 12:05.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Patrick Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Patrick Road, Kettering.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 Oct 2024 at 12:43.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Sussex Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Sussex Road, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 Oct 2024 at 12:43.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Sussex Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Sussex Road, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 12:05.

Western Power Distribution (East Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Northumberland Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Northumberland Road, Kettering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 12:05.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Finedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:49.

North Northamptonshire Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Stamford Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Stamford Road, Kettering.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 12:51.

Anglian Water logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gipsy Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Gipsy Lane, Kettering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 14:31.

Cadent Gas logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Meeting Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Meeting Lane, Burton Latimer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:30.


Roadworks Map near to Bryant Road, KETTERING, NN15 6JD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 03:54
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bryant Road, KETTERING, NN15 6JD (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (East Midlands) logo
ESSEX PLACE 
(0.3 miles)
Western Power Distribution (East Midlands)
Utility asset works - Footway, Carriageway, Verge -
In Progress
Since: 25 Nov 2024 10:29
(Scheduled: 25 Nov 2024 - 2 Dec 2024)
0.3
Details
Share
Follow
2
BT logo
LONDON ROAD 
(0.3 miles)
BT
Utility asset works - Verge - No carriageway incursion
Cancelled
(Scheduled: 26 Nov 2024 - 28 Nov 2024)
0.3
Details
Share
3
BT logo
LONDON ROAD 
(0.3 miles)
BT
Utility asset works - Verge - No carriageway incursion
Complete
26 Nov 2024 11:13 - 13:58
0.3
Details
Share
4
BT logo
LONDON ROAD 
(0.4 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Nov 2024 - 28 Nov 2024
0.4
Details
Share
Follow
5
BT logo
PIPERS HILL ROAD 
(0.7 miles)
BT
Utility asset works - Footway, Verge - Give and take
Planned
Scheduled: 26 Nov 2024 - 28 Nov 2024
0.7
Details
Share
Follow
6
BT logo
BROADWAY 
(0.7 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Nov 2024 - 28 Nov 2024
0.7
Details
Share
Follow
7
BT logo
ST JOHNS ROAD 
(0.8 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 2 Dec 2024
0.8
Details
Share
Follow
8
BT logo
CREIGHTON CRESCENT 
(0.8 miles)
BT
Utility asset works - Footway, Verge - Give and take
Cancelled
(Scheduled: 27 Nov 2024 - 29 Nov 2024)
0.8
Details
Share
9
BT logo
CREIGHTON CRESCENT 
(0.8 miles)
BT
Utility asset works - Footway, Verge - Give and take
Complete
26 Nov 2024 14:18 - 15:48
0.8
Details
Share
10
Anglian Water logo
URGENT
  
OBAN CLOSE 
(0.8 miles)
Anglian Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
25 Nov 2024 11:51 - 26 Nov 2024 13:13
0.8
Details
Share