ROADWORKS SUMMARY
Springfields, TOWCESTER, NN12 9TB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Springfields, NN12 9TB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Springfields, TOWCESTER, NN12 9TB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Springfields are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Northamptonshire Council logo
LONG TERM
Until
30 Jun 2027
Details
View Map
Share
Follow
Gayton Road

West Northamptonshire Council are carrying out Highway repair and maintenance works on Gayton Road, Bugbrooke.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 11:00 and could run through until 30 June 2027. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 1 Jul 2026 at 11:02.

Cadent Gas logo
Until
4 Oct 2026
Details
View Map
Share
Follow
London Road

Cadent Gas are carrying out Utility asset works on London Road, Roade.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 12:30 and could run through until 4 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 13:04.

Cadent Gas logo
Between
14 and 30 Sep 2026
Details
View Map
Share
Follow
Eastcote Road

Cadent Gas are proposing to carry out Utility asset works on Eastcote Road, Gayton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 10:02.

Cadent Gas logo
Between
14 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Tiffield Road

Cadent Gas are proposing to carry out Utility asset works on Tiffield Road, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 06:30.

Cadent Gas logo
Until
12 Oct 2026
Details
View Map
Share
Follow
Tiffield Road

Cadent Gas are carrying out Utility asset works on Tiffield Road, Gayton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 10:01 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 10:04.

Cadent Gas logo
Between
14 Sep and 11 Oct 2026
Details
View Map
Share
Follow
Churchcroft

Cadent Gas are proposing to carry out Utility asset works on Churchcroft, Roade.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 11 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 06:53.

Cadent Gas logo
Between
14 and 30 Sep 2026
Details
View Map
Share
Follow
Eastcote Road

Cadent Gas are proposing to carry out Utility asset works on Eastcote Road, Gayton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 12:04.

Cadent Gas logo
Between
14 and 30 Sep 2026
Details
View Map
Share
Follow
Oathill Road

Cadent Gas are proposing to carry out Utility asset works on Oathill Road, Towcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2026 at 06:27.

Cadent Gas logo
LONG TERM
Between
14 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Oak Close

Cadent Gas are proposing to carry out Utility asset works on Oak Close, Towcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2026 at 06:23.

Cadent Gas logo
Between
21 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Burcote Road

Cadent Gas are proposing to carry out Utility asset works on Burcote Road, Towcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2026 at 08:40.

Anglian Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Milton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Milton Road, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 1 Sep 2026 at 11:46.

Anglian Water logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Milton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Milton Road, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 25 Jun 2026 at 09:36.

Cadent Gas logo
Between
21 Sep and 12 Oct 2026
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Roade.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 08:26.

Cadent Gas logo
Between
21 Sep and 12 Oct 2026
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Roade.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 3 Aug 2026 at 10:50.

Cadent Gas logo
LONG TERM
Between
24 Sep and 9 Nov 2026
Details
View Map
Share
Follow
Blisworth Road

Cadent Gas are proposing to carry out Utility asset works on Blisworth Road, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 9 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 12:59.

Cadent Gas logo
LONG TERM
Between
24 Sep and 9 Nov 2026
Details
View Map
Share
Follow
Blisworth Road

Cadent Gas are proposing to carry out Utility asset works on Blisworth Road, Gayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 9 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Jul 2026 at 06:30.

Cadent Gas logo
LONG TERM
Between
28 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Haresmoor Drive

Cadent Gas are proposing to carry out Utility asset works on Haresmoor Drive, Towcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 26 Mar 2026 at 06:19.

Cadent Gas logo
Between
28 Sep and 19 Oct 2026
Details
View Map
Share
Follow
Sycamore Close

Cadent Gas are proposing to carry out Utility asset works on Sycamore Close, Towcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2026 at 06:29.

Cadent Gas logo
Between
5 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Orchard Close

Cadent Gas are proposing to carry out Utility asset works on Orchard Close, Towcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2026 at 06:21.

Anglian Water logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Banbury Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Banbury Lane, Blakesley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 7 Jul 2026 at 11:36.

Anglian Water logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Banbury Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Banbury Lane, Blakesley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 16 Sep 2026 at 13:36.

Anglian Water logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Pattishall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Apr 2026 at 15:58.

Anglian Water logo
Between
6 and 8 Oct 2026
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Pattishall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Sep 2026 at 13:34.

Anglian Water logo
Between
7 and 9 Oct 2026
Details
View Map
Share
Follow
Deanshanger Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Deanshanger Road, Lillingstone Lovell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 1 May 2026 at 10:56.

Cadent Gas logo
Between
12 and 28 Oct 2026
Details
View Map
Share
Follow
Orchard Way

Cadent Gas are proposing to carry out Utility asset works on Orchard Way, Roade.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 28 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Sep 2026 at 16:30.

Cadent Gas logo
LONG TERM
Between
12 Oct and 16 Nov 2026
Details
View Map
Share
Follow
St Lawrence Road South

Cadent Gas are proposing to carry out Utility asset works on St Lawrence Road South, Towcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2026 at 06:26.

Anglian Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Wappenham Road

Anglian Water are proposing to carry out Highway repair and maintenance works on Wappenham Road, Weedon Lois.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 30 Jul 2026 at 12:09.

Cadent Gas logo
Between
26 Oct and 21 Nov 2026
Details
View Map
Share
Follow
Spinney Close

Cadent Gas are proposing to carry out Utility asset works on Spinney Close, Towcester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 21 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2026 at 14:49.

Cadent Gas logo
LONG TERM
Between
9 Nov and 22 Dec 2026
Details
View Map
Share
Follow
Gayton Road

Cadent Gas are proposing to carry out Utility asset works on Gayton Road, Blisworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 22 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 08:55.

Cadent Gas logo
LONG TERM
Between
9 Nov and 22 Dec 2026
Details
View Map
Share
Follow
Gayton Road

Cadent Gas are proposing to carry out Utility asset works on Gayton Road, Blisworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 22 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Jul 2026 at 06:29.

Anglian Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Shutlanger Road

Anglian Water are proposing to carry out Highway repair and maintenance works on Shutlanger Road, Shutlanger.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 19 Aug 2026 at 13:18.

Anglian Water logo
Between
14 and 16 Dec 2026
Details
View Map
Share
Follow
Bury Hill

Anglian Water are proposing to carry out Utility repair and maintenance works on Bury Hill, Bradden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 1 Sep 2026 at 12:06.

BT logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Main Street

BT are proposing to carry out Utility asset works on Main Street, Abthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 16 Sep 2026 at 11:32.

BT logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Main Street

BT are proposing to carry out Utility asset works on Main Street, Abthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 8 Sep 2026 at 12:08.


Roadworks Map near to Springfields, TOWCESTER, NN12 9TB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 13:51
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Springfields, TOWCESTER, NN12 9TB (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
OAK CLOSE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 14 Sep 2026 - 16 Oct 2026
0.6
Details
Share
Follow
2
Cadent Gas logo
HARESMOOR DRIVE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 14 Sep 2026 - 25 Sep 2026
0.6
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
OATHILL ROAD 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 14 Sep 2026 - 30 Sep 2026
0.7
Details
Share
Follow