ROADWORKS SUMMARY
Northampton Road, TOWCESTER, NN12 7HU
Introduction

View current and future planned roadworks and road closures for Northampton Road, NN12 7HU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Northampton Road, TOWCESTER, NN12 7HU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Northampton Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
30 Jun 2026
West Northamptonshire Council are carrying out Highway repair and maintenance works on Gayton Road, Bugbrooke.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 September 2024 at 11:00 and could run through until 30 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 24 Mar 2025 at 10:41.
31 Mar and 8 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Shutlanger Road, Heathencote, Paulerspury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Anglian Water on 14 Jan 2025 at 09:39.
31 Mar and 8 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Shutlanger Road, Heathencote, Paulerspury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Anglian Water on 7 Jan 2025 at 11:15.
31 Mar and 8 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Shutlanger Road, Shutlanger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Anglian Water on 6 Jan 2025 at 06:28.
7 Apr and 8 Aug 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Shutlanger Road, Shutlanger.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Jan 2025 at 12:36.
27 Jun 2025
Anglian Water are carrying out Utility repair and maintenance works on Shutlanger Road, Heathencote, Paulerspury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 08:30 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 7 Apr 2025 at 09:31.
7 Apr and 8 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Shutlanger Road, Shutlanger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Anglian Water on 11 Feb 2025 at 11:26.
27 Jun 2025
Anglian Water are carrying out Utility repair and maintenance works on Shutlanger Road, Shutlanger.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 07:00 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 7 Apr 2025 at 08:02.
26 May and 23 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Northampton Road, Roade.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 13:32.
Today
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Simons Walk, Pattishall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 9 Jan 2025 at 06:12.
Anglian Water carried out Utility repair and maintenance works on The Greenway, Stoke Bruerne.
The road was closed for some or all of the period.
The works were originally planned between 1 Jun 2025 and 6 Jun 2025 and were actually completed between 1 Jun 2025 (10:35) and 3 Jun 2025 (14:35). The works impacted the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Jun 2025 at 14:35.
Anglian Water carried out Utility repair and maintenance works on Grafton Road, Alderton.
The road was closed for some or all of the period.
The works were originally planned between 1 Jun 2025 and 6 Jun 2025 and were actually completed between 1 Jun 2025 (20:00) and 3 Jun 2025 (15:11). The works impacted the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Jun 2025 at 15:11.
1 Jun and 30 Sep 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Whittlebury Road, Lillingstone Lovell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 14 Feb 2025 at 14:23.
Friday
Cadent Gas are carrying out Disconnection or alteration of supply on Malzor Lane, Milton Malsor.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:55 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 09:56.
2 Jun and 4 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Roade.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 13:34.
Friday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Milton Malsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 14:59.
Friday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Milton Malsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 May 2025 at 08:44.
Friday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Malzor Lane, Milton Malsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 15:15.
Thursday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Tews End Lane, Paulerspury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 6 Mar 2025 at 06:49.
Thursday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Tews End Lane, Paulerspury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 14 May 2025 at 15:51.
Friday
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Leys Road, Pattishall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 9 Jan 2025 at 06:13.
9 and 11 Jun 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Northampton Road, Courteenhall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 13 May 2025 at 07:33.
9 and 11 Jun 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Northampton Road, Courteenhall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 8 May 2025 at 12:38.
9 and 11 Jun 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Northampton Road, Courteenhall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Apr 2025 at 14:41.
9 and 13 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Gayton Road, Gayton, Tiffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 May 2025 at 13:05.
9 and 11 Jun 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Pury Road, Alderton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 24 Mar 2025 at 12:24.
9 and 13 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Tiffield Road, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 May 2025 at 12:36.
14 and 20 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Litchborough Road, Bugbrooke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 9 May 2025 at 08:57.
16 and 18 Jun 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Courteenhall Road, Blisworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Mar 2025 at 08:16.
16 and 18 Jun 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Courteenhall Road, Blisworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Jun 2025 at 14:00.
16 Jun and 9 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Tithe Way, Roade.
These works were categorised as Major.
The works were originally planned to start 16 June 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 13:36.
16 and 19 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Northampton Road, Grafton Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 21 Mar 2025 at 10:45.
16 and 19 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Northampton Road, Stoke Bruerne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 21 Mar 2025 at 10:44.
17 and 19 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rookery Lane, Stoke Bruerne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 1 Apr 2025 at 14:24.
17 and 19 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Bridge Road, Stoke Bruerne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 7 Apr 2025 at 09:25.
17 and 19 Jun 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Chapel Lane, Stoke Bruerne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 7 Apr 2025 at 09:26.
23 and 25 Jun 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Bugbrooke Road, Gayton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 1 May 2025 at 11:03.
30 Jun and 2 Jul 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Collingtree Road, Milton Malsor.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 25 Mar 2025 at 14:37.
30 Jun and 2 Jul 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Collingtree Road, Milton Malsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 26 Mar 2025 at 13:52.
30 Jun and 3 Jul 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Northampton Road, Stoke Bruerne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 Apr 2025 at 07:56.
30 Jun and 2 Jul 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Pury Road, Alderton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 24 Mar 2025 at 14:08.
30 Jun and 4 Jul 2025
National Highways are proposing to carry out Works for Rail Purposes on Blisworth Road, Stoke Bruerne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 May 2025 at 06:24.
30 Jun and 3 Jul 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Northampton Road, Grafton Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 8 Apr 2025 at 07:57.
7 and 11 Jul 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Bickerstaffes Road, Towcester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 7 Mar 2025 at 08:08.
7 and 9 Jul 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Rectory Lane, Milton Malsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 8 Apr 2025 at 11:21.
14 and 16 Jul 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Malzor Lane, Milton Malsor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 9 Apr 2025 at 05:58.
14 and 20 Jul 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Litchborough Road, Bugbrooke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 10 Apr 2025 at 08:50.
21 and 23 Jul 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Bakers Lane, Shutlanger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 2 Apr 2025 at 06:09.
21 and 23 Jul 2025
North Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Bakers Lane, Shutlanger.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 23 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 1 Apr 2025 at 14:56.
28 Jul and 18 Aug 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Swinneyford Road, Towcester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Mar 2025 at 06:37.
29 Jul and 2 Aug 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Gayton Road, Gayton, Tiffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 30 Apr 2025 at 11:33.
29 Jul and 2 Aug 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Tiffield Road, Gayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 30 Apr 2025 at 11:31.
30 Jul and 2 Aug 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Church Lane, Bugbrooke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 2 May 2025 at 06:20.
6 and 8 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on High Street North, Tiffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 13 May 2025 at 10:48.
19 and 22 Aug 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Litchborough Road, Bugbrooke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 20 May 2025 at 19:09.
19 and 21 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Plumpton End, Paulerspury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 20 May 2025 at 15:38.
20 and 22 Aug 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Blakesley Road, Greens Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 21 May 2025 at 14:27.
20 and 22 Aug 2025
Anglian Water are proposing to carry out New service connection on Abthorpe Road, Abthorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 30 May 2025 at 08:46.
26 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on A45 From J M1 J15 To J A508/a5076/b526 E, Northampton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 15:22.
26 and 28 Aug 2025
Anglian Water are proposing to carry out Highway repair and maintenance works on Careys Road, Paulerspury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 15 May 2025 at 11:30.
Roadworks Map near to Northampton Road, TOWCESTER, NN12 7HU (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Northampton Road, TOWCESTER, NN12 7HU (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 May 2025 - 20 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.