ROADWORKS SUMMARY
Wellingborough Road, RUSHDEN, NN10 9SU
Introduction
View current and future planned roadworks and road closures for Wellingborough Road, NN10 9SU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Wellingborough Road, RUSHDEN, NN10 9SU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wellingborough Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
15 Aug 2025
North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Wellingborough.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:47.
15 Aug 2025
North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Rushden.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:48.
Today
Cadent Gas are carrying out Utility asset works on Stanley Road, Wellingborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 15:45 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 08:01.
Sunday
Cadent Gas are carrying out Utility asset works on Doddington Road, Wellingborough.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 13:00 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 14:27.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Doddington Road, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:43.
Today
Cadent Gas are carrying out Utility asset works on Mill Road, Wellingborough.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2025 at 07:15 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 13:06.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Swanspool Parade, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:37.
7 Feb 2025
Cadent Gas are carrying out Utility asset works on Broadway, Wellingborough.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 January 2025 at 07:10 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 07:14.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:51.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:41.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:34.
20 Jan and 7 Feb 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on London Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 13:55.
20 Jan and 7 Feb 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Marshalls Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 14:02.
Monday
Cadent Gas are carrying out Utility asset works on London Road, Wellingborough.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 January 2025 at 13:50 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 13:51.
20 Jan and 7 Feb 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Meadow Lane, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 14:05.
14 Feb 2025
Cadent Gas are carrying out Utility asset works on London Road, Wellingborough.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 January 2025 at 10:50 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 09:04.
Anglian Water carried out Utility repair and maintenance works on Westfield Place, Rushden.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 29 Jan 2025 and 31 Jan 2025 and were actually completed between 29 Jan 2025 (08:00) and 30 Jan 2025 (16:53). The works impacted the footway and carriageway.
This roadwork event was last updated by Anglian Water on 30 Jan 2025 at 16:53.
Tomorrow
Anglian Water are proposing to carry out Utility repair and maintenance works on Westfield Place, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 09:27.
14 Feb 2025
North Northamptonshire Council are carrying out Highway repair and maintenance works on Meadow Lane, Raunds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 09:30 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 30 Jan 2025 at 10:00.
14 Feb 2025
North Northamptonshire Council are carrying out Highway repair and maintenance works on Marshalls Road, Raunds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 09:30 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 30 Jan 2025 at 09:59.
14 Feb 2025
North Northamptonshire Council are carrying out Highway repair and maintenance works on London Road, Raunds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 09:30 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 30 Jan 2025 at 09:59.
Wednesday
BT were proposing to carry out Utility asset works on Ditchford Lane, Rushden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Dec 2024 at 15:26.
Wednesday
BT were proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Dec 2024 at 15:26.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Finedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 09:24.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Finedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:49.
11 and 13 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chelveston Road, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 15 Jan 2025 at 11:46.
15 Feb and 15 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Pyghtle, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 11:51.
15 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on A6 Irthlingborough Bypass, Irthlingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:46.
15 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Irchester Road, Wollaston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 09:18.
17 and 21 Feb 2025
Bedford Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Yielden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 30 Jan 2025 at 15:38.
17 and 21 Feb 2025
Bedford Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Yielden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 20 Nov 2024 at 13:38.
24 Feb and 30 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lancaster Way, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Jan 2025 at 14:34.
24 Feb and 30 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lancaster Way, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Nov 2024 at 09:21.
24 Feb and 30 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Fosse Green, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Jan 2025 at 14:35.
24 Feb and 30 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Fosse Green, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Nov 2024 at 09:24.
24 and 26 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Lilley Terrace, Irthlingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 14 Jan 2025 at 12:53.
3 and 5 Mar 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Wollaston Road, Hinwick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 20 Dec 2024 at 09:37.
3 and 5 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Clare Street, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 11:44.
5 and 7 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chace Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 12 Dec 2024 at 09:01.
5 and 7 Mar 2025
BT were proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 31 Dec 2024 at 10:38.
5 and 7 Mar 2025
BT were proposing to carry out Utility asset works on Ditchford Lane, Rushden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 19 Dec 2024 at 12:59.
5 and 7 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Moor Road, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 12:47.
6 and 9 Mar 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on A6 Higham Ferrers Bypass, Higham Ferrers.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 24 Dec 2024 at 15:23.
10 and 21 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on High Street, Wollaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Jan 2025 at 08:10.
18 and 20 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 7 Jan 2025 at 10:34.
24 and 26 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Podington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 6 Jan 2025 at 12:54.
24 Mar and 4 Apr 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Midland Road, Higham Ferrers.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 19 Dec 2024 at 09:29.
31 Mar and 29 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Raunds Road, Stanwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 11:40.
2 and 4 Apr 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Rushden Road, Wymington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 15 Jan 2025 at 10:41.
2 and 4 Apr 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Rushden Road, Wymington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 11 Dec 2024 at 16:04.
7 Apr and 5 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Stanwick Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 11:36.
14 Apr and 12 May 2025
Cadent Gas are proposing to carry out Utility asset works on Francis Street, Raunds.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 08:59.
14 Apr and 6 Jun 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Midland Road, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 14 Jan 2025 at 10:07.
21 Apr and 6 May 2025
Cadent Gas are proposing to carry out Utility asset works on Orchard Road, Finedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 08:15.
29 Apr and 1 May 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Park Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 28 Jan 2025 at 11:07.
Roadworks Map near to Wellingborough Road, RUSHDEN, NN10 9SU (Loading...)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Wellingborough Road, RUSHDEN, NN10 9SU (11 Events)
(Scheduled Dates)
(miles)
(Scheduled: 28 Jan 2025 - 31 Jan 2025)
(Scheduled: 22 Jan 2025 - 11 Feb 2025)