ROADWORKS SUMMARY
Sussex Place, RUSHDEN, NN10 6PS
Introduction

View current and future planned roadworks and road closures for Sussex Place, NN10 6PS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Sussex Place, RUSHDEN, NN10 6PS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Sussex Place are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
28 Nov 2026
North Northamptonshire Council are carrying out Highway repair and maintenance works on Station Road, Irthlingborough.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 January 2022 at 10:00 and could run through until 28 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 5 Aug 2025 at 10:09.
19 Sep 2025
North Northamptonshire Council are carrying out Highway repair and maintenance works on Midland Road, Rushden.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 28 Aug 2025 at 14:01.
Today
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Church Street, Stanwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Apr 2025 at 10:23.
Tomorrow
Western Power Distribution (East Midlands) are carrying out Utility asset works on Church Street, Stanwick.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 July 2025 at 14:47 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Sep 2025 at 08:59.
4 Aug and 25 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Chelveston Road, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Jun 2025 at 11:13.
11 Aug and 29 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Stanwick Road, Raunds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jun 2025 at 08:05.
12 Aug and 23 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on The Ridge, Great Doddington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 08:57.
Tuesday
Cadent Gas are proposing to carry out Utility asset works on Millers Park, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 08:56.
19 Sep 2025
Anglian Water are carrying out Utility repair and maintenance works on Wellingborough Road, Great Harrowden.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 August 2025 at 09:26 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 22 Aug 2025 at 15:25.
25 Sep 2025
Cadent Gas are carrying out Utility asset works on Raunds Road, Stanwick.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 August 2025 at 11:15 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 11:04.
Friday
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Windmill Banks, Higham Ferrers.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 5 Jun 2025 at 13:39.
Monday
North Northamptonshire Council are carrying out Highway repair and maintenance works on Windmill Banks, Higham Ferrers.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 00:01 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 26 Aug 2025 at 16:03.
1 Sep and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Stanwick Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 09:48.
1 Sep and 27 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Stanwick Road, Raunds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Jun 2025 at 17:03.
Monday
Anglian Water are proposing to carry out Utility repair and maintenance works on Knox Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 17 Jul 2025 at 09:08.
Monday
Anglian Water were proposing to carry out Utility repair and maintenance works on Knox Road, Wellingborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 3 Sep 2025 at 08:54.
8 and 20 Sep 2025
National Highways are proposing to carry out Works for road purposes on High Street, Irchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 23 Jul 2025 at 12:36.
8 and 20 Sep 2025
National Highways are proposing to carry out Works for road purposes on High Street, Irchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 22 Jul 2025 at 10:06.
8 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Stanwick Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 09:12.
15 and 29 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Antona Drive, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 09:12.
15 and 29 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Antona Drive, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 09:58.
15 and 26 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Albert Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Jun 2025 at 11:44.
15 and 26 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Albert Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 09:13.
29 Sep and 13 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:45.
6 and 31 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Stanwick Road, Raunds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jun 2025 at 07:55.
6 and 10 Oct 2025
Anglian Water are proposing to carry out Highway repair and maintenance works on Harrowden Lane, Finedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 10 Jul 2025 at 10:26.
8 and 10 Oct 2025
Anglian Water are proposing to carry out New service connection on Lower Street, Great Doddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 15 Jul 2025 at 11:51.
10 and 14 Oct 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on High Street, Irchester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 15 Jul 2025 at 11:53.
13 and 15 Oct 2025
Anglian Water are proposing to carry out New service connection on London Road, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 26 Aug 2025 at 13:25.
13 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Wellington Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 13:35.
13 and 17 Oct 2025
Anglian Water are proposing to carry out New service connection on Higham Road, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 19 Aug 2025 at 14:58.
13 and 15 Oct 2025
Anglian Water were proposing to carry out New service connection on Shirley Road, Rushden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 26 Aug 2025 at 12:01.
13 and 17 Oct 2025
Anglian Water are proposing to carry out Remedial works on Rushden Road, Wymington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 9 Jul 2025 at 11:01.
13 and 17 Oct 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Rushden Road, Wymington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 21 Jul 2025 at 09:20.
14 and 17 Oct 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Higham Road, Rushden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 23 Jul 2025 at 09:53.
18 and 23 Oct 2025
North Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Bedford Road, Rushden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 October 2025 and run through until 23 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 27 Aug 2025 at 14:35.
20 Oct and 5 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Chelveston Road, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2025 at 11:40.
20 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Wellington Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 10:47.
22 and 24 Oct 2025
Anglian Water are proposing to carry out New service connection on London Road, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 22 Aug 2025 at 15:23.
27 and 31 Oct 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Rushden Road, Wymington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 4 Aug 2025 at 14:41.
29 and 31 Oct 2025
Anglian Water are proposing to carry out New service connection on Higham Road, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 20 Aug 2025 at 11:22.
29 Oct and 4 Nov 2025
Anglian Water were proposing to carry out New service connection on Shirley Road, Rushden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 26 Aug 2025 at 12:03.
29 and 31 Oct 2025
Anglian Water are proposing to carry out New service connection on Shirley Road, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 26 Aug 2025 at 12:04.
3 and 5 Nov 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on College Street, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 14 Aug 2025 at 09:37.
10 Nov and 11 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Wellington Road, Raunds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 09:19.
18 and 20 Nov 2025
Anglian Water are proposing to carry out New service connection on Cromwell Road, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Aug 2025 at 11:45.
24 Nov and 8 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Stanwick Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 10:41.
27 Nov and 9 Dec 2025
Bedford Borough Council are proposing to carry out Highway improvement works on Village Street, Hinwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2025 and could run through until 9 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Bedford Borough Council on 26 Aug 2025 at 10:05.
1 and 6 Dec 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Bedford Road, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 2 Sep 2025 at 12:04.
1 and 6 Dec 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rushden Road, Souldrop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 2 Sep 2025 at 12:13.
Roadworks Map near to Sussex Place, RUSHDEN, NN10 6PS (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Sussex Place, RUSHDEN, NN10 6PS (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 27 Aug 2025 - 5 Sep 2025)
(Scheduled: 2 Jun 2025 - 19 Sep 2025)
(Scheduled: 3 Sep 2025 - 9 Sep 2025)
(Scheduled: 27 Aug 2025 - 9 Sep 2025)
(Scheduled: 2 Jun 2025 - 19 Sep 2025)
(Scheduled: 1 Sep 2025 - 4 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.