ROADWORKS SUMMARY
Sunningdale Drive, RUSHDEN, NN10 0YJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Sunningdale Drive, NN10 0YJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Sunningdale Drive, RUSHDEN, NN10 0YJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Sunningdale Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Northamptonshire Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Ditchford Lane

North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Rushden.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:48.

North Northamptonshire Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Ditchford Lane

North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Wellingborough.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:47.

Anglian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Odell Road

Anglian Water are carrying out Utility repair and maintenance works on Odell Road, Sharnbrook.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 06:47.

Cadent Gas logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Eastfield Road

Cadent Gas are carrying out Utility asset works on Eastfield Road, Wellingborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 08:09.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Cross Road

Cadent Gas are proposing to carry out Utility asset works on Cross Road, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 13:03.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gold Street

Cadent Gas are proposing to carry out Utility asset works on Gold Street, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 13:03.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Gisburne Road

Cadent Gas are proposing to carry out Utility asset works on Gisburne Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 14:10.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Bedale Road

Cadent Gas are proposing to carry out Utility asset works on Bedale Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 10:03.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Ferrestone Road

Cadent Gas are proposing to carry out Utility asset works on Ferrestone Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 14:22.

Cadent Gas logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Cross Road

Cadent Gas are carrying out Utility asset works on Cross Road, Wellingborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 16:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 16:12.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Gold Street

Cadent Gas are carrying out Utility asset works on Gold Street, Wellingborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:50 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:00.

Cadent Gas logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Gisburne Road

Cadent Gas are carrying out Utility asset works on Gisburne Road, Wellingborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:10 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:16.

Cadent Gas logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Bedale Road

Cadent Gas are carrying out Utility asset works on Bedale Road, Wellingborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:10 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:21.

Cadent Gas logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Ferrestone Road

Cadent Gas are carrying out Utility asset works on Ferrestone Road, Wellingborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:10 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:19.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Aug 2024 at 11:42.

North Northamptonshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
The Hedges

North Northamptonshire Council are proposing to carry out Section 50 on The Hedges, Higham Ferrers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 30 Sep 2024 at 10:18.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Ranelagh Road

Cadent Gas are proposing to carry out Utility asset works on Ranelagh Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 08:27.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Ranelagh Road

Cadent Gas are proposing to carry out Utility asset works on Ranelagh Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:36.

Cadent Gas logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Palk Road

Cadent Gas are proposing to carry out Utility asset works on Palk Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:44.

BT logo
Finishing
Wednesday
Details
View Map
Share
Ditchford Lane

BT were proposing to carry out Utility asset works on Ditchford Lane, Rushden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Aug 2024 at 09:32.

Cadent Gas logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Palk Road

Cadent Gas are proposing to carry out Utility asset works on Palk Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 08:24.

BT logo
Finishing
Wednesday
Details
View Map
Share
Ditchford Lane

BT were proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Aug 2024 at 09:32.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Aug 2024 at 11:43.

BT logo
Finishing
Friday
Details
View Map
Share
A45 From J A5028 To J A509/b573 W

BT were proposing to carry out Utility asset works on A45 From J A5028 To J A509/b573 W, East Northamptonshire.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 10 Sep 2024 at 08:53.

Cadent Gas logo
Between
2 and 24 Dec 2024
Details
View Map
Share
Follow
Stanley Road

Cadent Gas are proposing to carry out Utility asset works on Stanley Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:47.

Cadent Gas logo
Between
2 and 24 Dec 2024
Details
View Map
Share
Follow
Stanley Road

Cadent Gas are proposing to carry out Utility asset works on Stanley Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:27.

Anglian Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Hookhams Path

Anglian Water are proposing to carry out Utility repair and maintenance works on Hookhams Path, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 09:46.

Anglian Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Hookhams Path

Anglian Water are proposing to carry out Utility repair and maintenance works on Hookhams Path, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 5 Sep 2024 at 09:18.

BT logo
Between
10 and 12 Dec 2024
Details
View Map
Share
A45 From J A5028 To J A509/b573 W

BT were proposing to carry out Utility asset works on A45 From J A5028 To J A509/b573 W, East Northamptonshire.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2024 at 09:32.

BT logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
A45 From J A5028 To J A509/b573 W

BT are proposing to carry out Utility asset works on A45 From J A5028 To J A509/b573 W, East Northamptonshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 15:28.

BT logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
A45 From J A5028 To J A509/b573 W

BT are proposing to carry out Utility asset works on A45 From J A5028 To J A509/b573 W, East Northamptonshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2024 at 09:51.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Finedon Road

Cadent Gas were proposing to carry out Utility asset works on Finedon Road, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:14.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Cannon Street

Cadent Gas were proposing to carry out Utility asset works on Cannon Street, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:41.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Chelveston Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Chelveston Road, Raunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 10:18.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Lilley Terrace

Anglian Water are proposing to carry out Utility repair and maintenance works on Lilley Terrace, Irthlingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 9 Oct 2024 at 08:17.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:24.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:45.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:42.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Coffee Tavern Lane

Cadent Gas are proposing to carry out Utility asset works on Coffee Tavern Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:38.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Coffee Tavern Lane

Cadent Gas are proposing to carry out Utility asset works on Coffee Tavern Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:40.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Doddington Road

Cadent Gas are proposing to carry out Utility asset works on Doddington Road, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:43.

Anglian Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Mill Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Road, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 08:31.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Broadway

Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:41.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Broadway

Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:51.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Swanspool Parade

Cadent Gas are proposing to carry out Utility asset works on Swanspool Parade, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:37.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:50.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Allen Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Allen Road, Irthlingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Oct 2024 at 09:33.

North Northamptonshire Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Windmill Banks

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Windmill Banks, Higham Ferrers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 17 Oct 2024 at 09:36.

North Northamptonshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on London Road, Raunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 13:55.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:34.

North Northamptonshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Marshalls Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Marshalls Road, Raunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 14:02.

North Northamptonshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Meadow Lane

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Meadow Lane, Raunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 14:05.

Anglian Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 09:02.

Anglian Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Harborough Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Harborough Road, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 09:46.

Anglian Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Westfield Place

Anglian Water are proposing to carry out Utility repair and maintenance works on Westfield Place, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 09:27.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Nov 2024 at 13:12.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Nov 2024 at 13:19.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Finedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:49.

Cadent Gas logo
Between
15 and 28 Feb 2025
Details
View Map
Share
Follow
Irchester Road

Cadent Gas are proposing to carry out Utility asset works on Irchester Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 09:18.

Cadent Gas logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
A6 Irthlingborough Bypass

Cadent Gas are proposing to carry out Utility asset works on A6 Irthlingborough Bypass, Irthlingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:46.

Bedford Borough Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Yielden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 20 Nov 2024 at 13:38.


Roadworks Map near to Sunningdale Drive, RUSHDEN, NN10 0YJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 04:39
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Sunningdale Drive, RUSHDEN, NN10 0YJ (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
RICHMOND CLOSE 
(0.2 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
22 Nov 2024 11:42 - 12:58
0.2
Details
Share
2
Virgin Media logo
CELANDINE CLOSE 
(0.4 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.4
Details
Share
Follow
3
Western Power Distribution (East Midlands) logo
URGENT
  
HIGH STREET 
(0.8 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 20 Nov 2024 01:00
(Scheduled: 20 Nov 2024 - 26 Nov 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.