ROADWORKS SUMMARY
Allen Road, RUSHDEN, NN10 0DY
Introduction
View current and future planned roadworks and road closures for Allen Road, NN10 0DY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Allen Road, RUSHDEN, NN10 0DY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Allen Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
15 Aug 2025
North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Wellingborough.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:47.
15 Aug 2025
North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Rushden.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:48.
Tomorrow
Cadent Gas are carrying out Utility asset works on West Street, Wellingborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 18:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 14:07.
Friday
Cadent Gas are proposing to carry out Utility asset works on Berry Green Road, Finedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 13:40.
Today
Cadent Gas are proposing to carry out Utility asset works on Palk Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:44.
Friday
Cadent Gas are proposing to carry out Utility asset works on Ranelagh Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:36.
24 Jan 2025
Cadent Gas are carrying out Utility asset works on Berry Green Road, Finedon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 December 2024 at 10:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:22.
Tuesday
Cadent Gas are proposing to carry out Utility asset works on Stanley Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:47.
Tuesday
Cadent Gas are carrying out Utility asset works on Palk Road, Wellingborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 11:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 12:26.
Tuesday
Cadent Gas are carrying out Utility asset works on Ranelagh Road, Wellingborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 11:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 12:27.
Tuesday
Cadent Gas are proposing to carry out Utility asset works on Church Hill, Finedon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:00.
24 Jan 2025
Cadent Gas are carrying out Utility asset works on Avenue Road, Finedon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 December 2024 at 10:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:22.
24 Jan 2025
Cadent Gas are carrying out Utility asset works on Church Hill, Finedon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 08:30 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:18.
30 Jan 2025
Cadent Gas are carrying out Utility asset works on Stanley Road, Wellingborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 15:45 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 17:24.
Monday
Anglian Water are carrying out Utility repair and maintenance works on Lister Road, Wellingborough.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 09:09 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 17 Dec 2024 at 09:48.
Friday
Anglian Water were proposing to carry out Utility repair and maintenance works on High Street, Rushden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 17 Dec 2024 at 11:03.
Tuesday
Anglian Water are carrying out Utility repair and maintenance works on The Green, Souldrop.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 December 2024 at 08:58 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Dec 2024 at 09:59.
6 and 8 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chelveston Road, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 10:18.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Wollaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:20.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:45.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:42.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Coffee Tavern Lane, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:38.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Coffee Tavern Lane, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:40.
6 and 8 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chelveston Road, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 12 Dec 2024 at 11:25.
6 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Cannon Street, Wellingborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:41.
6 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Finedon Road, Wellingborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:14.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Wollaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:24.
6 and 8 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Lilley Terrace, Irthlingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 11:42.
6 and 8 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Lilley Terrace, Irthlingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 9 Oct 2024 at 08:17.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Doddington Road, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 00:10.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Doddington Road, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:43.
7 and 9 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 08:31.
7 and 9 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 11:26.
13 and 15 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Allen Road, Irthlingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Oct 2024 at 09:33.
13 and 28 Jan 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Windmill Banks, Higham Ferrers.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 17 Oct 2024 at 09:36.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:50.
13 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Swanspool Parade, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:37.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:51.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Broadway, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:41.
20 Jan and 7 Feb 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Meadow Lane, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 14:05.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wellingborough.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:34.
20 Jan and 7 Feb 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Marshalls Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 14:02.
20 Jan and 7 Feb 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on London Road, Raunds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 13:55.
21 and 23 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Wollaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 09:02.
22 and 24 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Harborough Road, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 09:46.
29 and 31 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Westfield Place, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 09:27.
3 and 5 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Hargrave.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 17 Dec 2024 at 15:37.
3 and 5 Feb 2025
BT were proposing to carry out Utility asset works on Ditchford Lane, Rushden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Dec 2024 at 15:26.
3 and 5 Feb 2025
BT were proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Dec 2024 at 15:26.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Finedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:49.
15 Feb and 15 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Pyghtle, Wellingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 11:51.
15 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on A6 Irthlingborough Bypass, Irthlingborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:46.
15 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Irchester Road, Wollaston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 09:18.
17 and 21 Feb 2025
Bedford Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Yielden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bedford Borough Council on 20 Nov 2024 at 13:38.
24 Feb and 30 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lancaster Way, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Nov 2024 at 09:21.
24 Feb and 30 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Fosse Green, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Nov 2024 at 09:24.
3 and 5 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Clare Street, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 11:44.
3 and 5 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Wollaston Road, Hinwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 11 Dec 2024 at 11:54.
5 and 7 Mar 2025
BT are proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 17 Dec 2024 at 08:26.
5 and 7 Mar 2025
BT are proposing to carry out Utility asset works on Ditchford Lane, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 17 Dec 2024 at 08:23.
5 and 7 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Chace Road, Wellingborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 12 Dec 2024 at 09:01.
5 and 7 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Moor Road, Rushden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 12:47.
6 and 9 Mar 2025
North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on A6 Higham Ferrers Bypass, Higham Ferrers.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Northamptonshire Council on 9 Dec 2024 at 15:57.
10 and 21 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on High Street, Wollaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Dec 2024 at 11:45.
17 Mar and 18 Apr 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Midland Road, Raunds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 17 Dec 2024 at 14:22.
Roadworks Map near to Allen Road, RUSHDEN, NN10 0DY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Allen Road, RUSHDEN, NN10 0DY (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Dec 2024 - 24 Dec 2024)
(Scheduled: 17 Dec 2024 - 3 Jan 2025)
(Scheduled: 17 Dec 2024 - 3 Jan 2025)
(Scheduled: 17 Dec 2024 - 23 Dec 2024)
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
(Scheduled: 18 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.