ROADWORKS SUMMARY
Toton Lane, NOTTINGHAM, NG9 7JD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Toton Lane, NG9 7JD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Toton Lane, NOTTINGHAM, NG9 7JD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Toton Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Footpath L73

Leicestershire County Council are carrying out Highway improvement works on Footpath L73, Lockington-hemington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 March 2024 at 10:00 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Sep 2024 at 13:06.

Derbyshire County Council logo
LONG TERM
Between
7 May and 23 Nov 2024
Details
View Map
Share
Follow
Lows Lane

Derbyshire County Council are proposing to carry out Highway improvement works on Lows Lane, Stanton By Dale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 23 Oct 2024 at 13:10.

National Highways logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Long Lane

National Highways are carrying out Works for road purposes on Long Lane, Kegworth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 June 2024 at 13:03 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Jun 2024 at 15:06.

National Highways logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Wollaton Vale

National Highways are carrying out Works for road purposes on Wollaton Vale, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 20:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Aug 2024 at 10:42.

National Highways logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Middleton Boulevard

National Highways are carrying out Works for road purposes on Middleton Boulevard, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 20:00 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Oct 2024 at 10:33.

Cadent Gas logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Wollaton Road

Cadent Gas are carrying out Utility asset works on Wollaton Road, Beeston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 09:30 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:07.

Independent Water Networks logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Thane Road

Independent Water Networks are carrying out New service connection on Thane Road, Beeston.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 10:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Independent Water Networks on 17 Sep 2024 at 13:04.

Electricity Network Company logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Thane Road

Electricity Network Company are carrying out New service connection on Thane Road, Beeston.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 10:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Sep 2024 at 13:04.

Nottinghamshire County Council logo
LONG TERM
Between
12 Aug 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Shilo Way

Nottinghamshire County Council are proposing to carry out Works for road purposes on Shilo Way, Cossall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 24 Jul 2024 at 12:30.

National Highways logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Abbey Street

National Highways are carrying out Works for road purposes on Abbey Street, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 August 2024 at 20:00 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2024 at 09:49.

Cadent Gas logo
LONG TERM
Between
16 Sep and 15 Nov 2024
Details
View Map
Share
Follow
Woodside Road

Cadent Gas are proposing to carry out Utility asset works on Woodside Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 1 Jul 2024 at 12:43.

Nottingham City Council logo
LONG TERM
Between
30 Sep 2024 and 2 Jun 2025
Details
View Map
Share
Follow
Thane Road

Nottingham City Council are proposing to carry out Highway improvement works on Thane Road, Nottingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Aug 2024 at 15:06.

Nottingham City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Meadows Way

Nottingham City Council are carrying out Highway improvement works on Meadows Way, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 14:39 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 30 Sep 2024 at 15:00.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Radford Boulevard

Cadent Gas are carrying out Utility repair and maintenance works on Radford Boulevard, Nottingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:30 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:47.

Nottingham City Council logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Queens Drive

Nottingham City Council are carrying out Highway improvement works on Queens Drive, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 00:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 22 Oct 2024 at 09:09.

Electricity Network Company logo
LONG TERM
Between
1 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Coventry Lane

Electricity Network Company are proposing to carry out Utility asset works on Coventry Lane, Bramcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Jul 2024 at 11:35.

Nottingham City Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Bentinck Road

Nottingham City Council are carrying out Highway improvement works on Bentinck Road, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 11:43 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 7 Oct 2024 at 12:00.

Nottingham City Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Radford Road

Nottingham City Council are proposing to carry out Highway improvement works on Radford Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 10 Oct 2024 at 09:48.

Nottingham City Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Radford Road

Nottingham City Council are carrying out Highway improvement works on Radford Road, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2024 at 00:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 14 Oct 2024 at 08:59.

Cadent Gas logo
Between
13 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Hillside Road

Cadent Gas are proposing to carry out Utility asset works on Hillside Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2023 at 12:40.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Barton Lane

Severn Trent Water are carrying out Utility repair and maintenance works on Barton Lane, Barton In Fabis.

These works are categorised as Major.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 14 October 2024 at 09:37 and could run through until 1 November 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 12:10.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Derby Road

Cadent Gas are proposing to carry out Utility asset works on Derby Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 15:30.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
A52 J A6200/6514 Roundabout

Cadent Gas are proposing to carry out Utility asset works on A52 J A6200/6514 Roundabout, City Of Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:55.

Derbyshire County Council logo
LONG TERM
Between
14 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Quarry Hill Road

Derbyshire County Council are proposing to carry out Remedial works on Quarry Hill Road, Ilkeston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 19 Sep 2024 at 15:11.

Derbyshire County Council logo
LONG TERM
Until
14 Nov 2024
Details
View Map
Share
Follow
Quarry Hill Road

Derbyshire County Council are carrying out Remedial works on Quarry Hill Road, Ilkeston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:30 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 15 Oct 2024 at 09:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Mettham Street

Western Power Distribution (East Midlands) are carrying out New service connection on Mettham Street, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 17:47 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Oct 2024 at 15:00.

Cadent Gas logo
Between
20 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Wollaton Road

Cadent Gas are proposing to carry out Utility asset works on Wollaton Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Dec 2023 at 12:40.

Severn Trent Water logo
LONG TERM
Between
21 Oct 2024 and 23 Oct 2025
Details
View Map
Share
Nottingham Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Nottingham Road, Stapleford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 12:28.

Cadent Gas logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Hillside Road

Cadent Gas are proposing to carry out Utility asset works on Hillside Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:44.

Cadent Gas logo
Until
3 Nov 2024
Details
View Map
Share
Follow
Wollaton Road

Cadent Gas are carrying out Utility asset works on Wollaton Road, Beeston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:00 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 11:09.

Cadent Gas logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
A52 From J A6464 To J B6006 W

Cadent Gas were proposing to carry out Utility asset works on A52 From J A6464 To J B6006 W, City Of Nottingham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 13:03.

Cadent Gas logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
A52 From J A6464 To J B6006 W

Cadent Gas are proposing to carry out Utility asset works on A52 From J A6464 To J B6006 W, City Of Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 14:13.

Cadent Gas logo
Until
3 Nov 2024
Details
View Map
Share
Follow
A52 From J A6464 To J B6006 W

Cadent Gas are carrying out Utility asset works on A52 From J A6464 To J B6006 W, City Of Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:00 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 11:08.

Cadent Gas logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
Follow
A52 From J A6464 To J B6006 W

Cadent Gas are proposing to carry out Utility asset works on A52 From J A6464 To J B6006 W, City Of Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 13:48.

Cadent Gas logo
Until
3 Nov 2024
Details
View Map
Share
Follow
A52 From J A6464 To J B6006 W

Cadent Gas are carrying out Utility asset works on A52 From J A6464 To J B6006 W, City Of Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:00 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 11:10.

Cadent Gas logo
Between
21 Oct and 3 Nov 2024
Details
View Map
Share
A52 From J A6464 To J B6006 W

Cadent Gas were proposing to carry out Utility asset works on A52 From J A6464 To J B6006 W, City Of Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:56.

Nottingham City Council logo
Until
4 Nov 2024
Details
View Map
Share
Follow
Southey Street

Nottingham City Council are carrying out Highway improvement works on Southey Street, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:14 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 21 Oct 2024 at 09:00.

Nottingham City Council logo
Until
4 Nov 2024
Details
View Map
Share
Follow
Radford Road

Nottingham City Council are carrying out Highway improvement works on Radford Road, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:14 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 21 Oct 2024 at 09:00.

Derbyshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Tamworth Road

Derbyshire County Council are proposing to carry out Works for road purposes on Tamworth Road, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 15 Oct 2024 at 16:01.

Derbyshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Market Place

Derbyshire County Council are proposing to carry out Works for road purposes on Market Place, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 26 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 15 Oct 2024 at 16:05.

Nottinghamshire County Council logo
Between
26 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Templar Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Templar Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Sep 2024 at 14:12.

Nottinghamshire County Council logo
Between
26 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Templar Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Templar Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Sep 2024 at 07:49.

Nottinghamshire County Council logo
Between
26 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Herald Close

Nottinghamshire County Council are proposing to carry out Highway improvement works on Herald Close, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Sep 2024 at 14:10.

Nottinghamshire County Council logo
Between
26 Oct and 9 Nov 2024
Details
View Map
Share
Follow
Herald Close

Nottinghamshire County Council are proposing to carry out Highway improvement works on Herald Close, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 9 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Sep 2024 at 07:49.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Dale Road

Severn Trent Water are carrying out Utility repair and maintenance works on Dale Road, Derby.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 10:13 and could run through until 30 October 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 26 Oct 2024 at 10:13.

Cadent Gas logo
Between
27 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Wollaton Road

Cadent Gas are proposing to carry out roadworks on Wollaton Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 08:07.

Western Power Distribution (East Midlands) logo
Between
31 Oct and 13 Nov 2024
Details
View Map
Share
Follow
Mettham Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Mettham Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Aug 2024 at 09:22.

Western Power Distribution (East Midlands) logo
Between
1 and 5 Nov 2024
Details
View Map
Share
Follow
Grove Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Grove Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Sep 2024 at 13:29.

Western Power Distribution (East Midlands) logo
Between
1 and 5 Nov 2024
Details
View Map
Share
Follow
Grove Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Grove Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Oct 2024 at 11:45.

Severn Trent Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Scafell Way

Severn Trent Water are proposing to carry out New service connection on Scafell Way, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Aug 2024 at 15:08.

Nottinghamshire County Council logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Hall Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hall Drive, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Jul 2024 at 07:38.

Nottinghamshire County Council logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Hall Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hall Drive, Chilwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Sep 2024 at 08:01.

Western Power Distribution (East Midlands) logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Barton Street

Western Power Distribution (East Midlands) were proposing to carry out New service connection on Barton Street, Beeston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Sep 2024 at 13:57.

Nottingham City Council logo
Between
4 and 24 Nov 2024
Details
View Map
Share
Follow
Queens Drive

Nottingham City Council are proposing to carry out Highway improvement works on Queens Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 17 Sep 2024 at 09:54.

Nottingham City Council logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Queens Drive

Nottingham City Council are proposing to carry out Highway improvement works on Queens Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 21 Oct 2024 at 11:52.

Severn Trent Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Harley Street

Severn Trent Water are proposing to carry out New service connection on Harley Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 09:17.

Cadent Gas logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Boden Street

Cadent Gas are proposing to carry out Utility asset works on Boden Street, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 12:42.

Cadent Gas logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Boden Street

Cadent Gas are proposing to carry out Utility asset works on Boden Street, Nottingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 11:38.

Western Power Distribution (East Midlands) logo
Between
5 and 7 Nov 2024
Details
View Map
Share
Follow
Barton Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Barton Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Sep 2024 at 13:30.

Western Power Distribution (East Midlands) logo
Between
5 and 7 Nov 2024
Details
View Map
Share
Follow
Barton Street

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Barton Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Oct 2024 at 11:45.

Nottinghamshire County Council logo
Between
5 and 12 Nov 2024
Details
View Map
Share
Follow
Blake Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Blake Road, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 6 Jun 2024 at 12:25.

Western Power Distribution (East Midlands) logo
Between
6 and 8 Nov 2024
Details
View Map
Share
Grove Street

Western Power Distribution (East Midlands) were proposing to carry out New service connection on Grove Street, Beeston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Sep 2024 at 13:57.

Nottinghamshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Clifton Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Clifton Road, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2024 at 16:52.

Nottinghamshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Clifton Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Clifton Road, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Sep 2024 at 14:17.

Nottinghamshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Clifton Lane

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Clifton Lane, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Sep 2024 at 14:16.

Severn Trent Water logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Howitt Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Howitt Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Aug 2024 at 10:54.

Severn Trent Water logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Howitt Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Howitt Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Aug 2024 at 14:34.

Nottinghamshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Clifton Lane

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Clifton Lane, Ruddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2024 at 16:52.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
King Street

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on King Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Aug 2024 at 15:52.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
King Street

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on King Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 14 Aug 2024 at 11:24.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Granville Avenue

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Granville Avenue, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Aug 2024 at 15:40.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Granville Avenue

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Granville Avenue, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 14 Aug 2024 at 11:23.

Derbyshire County Council logo
Between
11 and 21 Nov 2024
Details
View Map
Share
Follow
Derby Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Derby Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Aug 2024 at 15:30.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Derby Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Derby Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 16 Aug 2024 at 07:40.

Cadent Gas logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Aaron Close

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Aaron Close, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 14:47.

Severn Trent Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Harley Street

Severn Trent Water are proposing to carry out New service connection on Harley Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 09:17.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Hallam Fields Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Hallam Fields Road, Ilkeston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 9 Aug 2024 at 15:17.

Derbyshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Hallam Fields Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Hallam Fields Road, Ilkeston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 12 Aug 2024 at 15:27.

Nottingham City Council logo
Between
11 and 17 Nov 2024
Details
View Map
Share
Follow
Deepdene Way

Nottingham City Council are proposing to carry out Highway improvement works on Deepdene Way, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 16 Sep 2024 at 13:46.

Severn Trent Water logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Follow
Grove Street

Severn Trent Water are proposing to carry out New service connection on Grove Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Aug 2024 at 10:10.

Severn Trent Water logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Follow
Grove Street

Severn Trent Water are proposing to carry out New service connection on Grove Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Aug 2024 at 14:54.

Nottinghamshire County Council logo
Between
13 and 20 Nov 2024
Details
View Map
Share
Follow
Sisley Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Sisley Avenue, Stapleford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 7 Jun 2024 at 16:53.

Severn Trent Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
College Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on College Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Sep 2024 at 14:36.

Severn Trent Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
College Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on College Street, Long Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2024 at 14:00.

Severn Trent Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Prospect Place

Severn Trent Water are proposing to carry out New service connection on Prospect Place, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 10:04.

Nottingham City Council logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Deepdene Way

Nottingham City Council are proposing to carry out Highway improvement works on Deepdene Way, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 21 Oct 2024 at 11:58.

Severn Trent Water logo
Between
20 and 22 Nov 2024
Details
View Map
Share
College Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on College Street, Long Eaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Aug 2024 at 12:00.

Severn Trent Water logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Orston Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orston Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Aug 2024 at 11:24.

Severn Trent Water logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Orston Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orston Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2024 at 14:06.

Cadent Gas logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Denman Street East

Cadent Gas are proposing to carry out Utility asset works on Denman Street East, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 12:42.

Cadent Gas logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Denman Street East

Cadent Gas are proposing to carry out Utility asset works on Denman Street East, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 07:23.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
The Cloisters

Nottinghamshire County Council are proposing to carry out Works for road purposes on The Cloisters, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 07:56.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
The Cloisters

Nottinghamshire County Council are proposing to carry out Works for road purposes on The Cloisters, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 10:17.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Salthouse Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Salthouse Lane, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 08:03.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Salthouse Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Salthouse Lane, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jul 2024 at 10:17.

Severn Trent Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Prospect Place

Severn Trent Water are proposing to carry out New service connection on Prospect Place, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Sep 2024 at 15:46.

Severn Trent Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Prospect Place

Severn Trent Water were proposing to carry out New service connection on Prospect Place, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Sep 2024 at 15:02.

Severn Trent Water logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Follow
Barton Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Barton Lane, Barton In Fabis.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 5 December 2024 and could run through until 27 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 10 Sep 2024 at 15:00.

Nottinghamshire County Council logo
Between
6 and 16 Dec 2024
Details
View Map
Share
Follow
Claremont Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Claremont Avenue, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 15 Jul 2024 at 08:24.

Nottingham City Council logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Newland Close

Nottingham City Council are proposing to carry out Highway improvement works on Newland Close, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 16 Sep 2024 at 14:51.

Nottingham City Council logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Newland Close

Nottingham City Council are proposing to carry out Highway improvement works on Newland Close, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 18 Sep 2024 at 14:13.

Severn Trent Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Peveril Street

Severn Trent Water were proposing to carry out New service connection on Peveril Street, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:58.

Cadent Gas logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Thoresby Crescent

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Thoresby Crescent, Draycott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:16.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Barton Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Barton Lane, Attenborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 2 May 2024 at 08:37.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Attenborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 2 May 2024 at 08:37.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Swiney Way

Nottinghamshire County Council are proposing to carry out Works for road purposes on Swiney Way, Chilwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 2 May 2024 at 08:37.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Harley Street

Severn Trent Water are proposing to carry out New service connection on Harley Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 08:48.

Nottinghamshire County Council logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Kilburn Close

Nottinghamshire County Council are proposing to carry out Works for road purposes on Kilburn Close, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Oct 2024 at 14:42.

Cadent Gas logo
LONG TERM
Between
13 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Wilne Road

Cadent Gas are proposing to carry out Utility asset works on Wilne Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 14:34.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Wilne Lane

Cadent Gas are proposing to carry out Utility asset works on Wilne Lane, Sawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 14:33.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Repton Road

Cadent Gas are proposing to carry out Utility asset works on Repton Road, Long Eaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 14:32.

Severn Trent Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Harley Street

Severn Trent Water are proposing to carry out New service connection on Harley Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 08:46.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Cockington Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Cockington Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2024 at 14:53.

Severn Trent Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Gregory Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gregory Street, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 09:34.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Denman Street East

Severn Trent Water are proposing to carry out New service connection on Denman Street East, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 14:51.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Denman Street East

Severn Trent Water are proposing to carry out New service connection on Denman Street East, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 09:01.


Roadworks Map near to Toton Lane, NOTTINGHAM, NG9 7JD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 26 Oct 2024 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Toton Lane, NOTTINGHAM, NG9 7JD (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
MOORLAND AVENUE 
(0.5 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 25 Oct 2024 - 28 Oct 2024
0.5
Details
Share
Follow
2
Virgin Media logo
MOORLAND AVENUE 
(0.5 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
25 Oct 2024 08:15 - 09:00
0.5
Details
Share
3
Western Power Distribution (East Midlands) logo
URGENT
  
BROOKHILL STREET 
(0.5 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 24 Oct 2024 11:15
(Scheduled: 24 Oct 2024 - 30 Oct 2024)
0.5
Details
Share
Follow
4
BT logo
BROAD OAK DRIVE 
(0.6 miles)
BT
Utility repair and maintenance works - Footway, Verge - Some carriageway incursion
Complete
24 Oct 2024 08:33 - 25 Oct 2024 11:34
0.6
Details
Share
5
Nottinghamshire County Council logo
DERBY ROAD 
(0.6 miles)
Nottinghamshire County Council
Works for road purposes - Carriageway - Some carriageway incursion
Complete
26 Oct 2024 09:23 - 09:25
0.6
Details
Share
6
Severn Trent Water logo
CEMETERY ROAD 
(0.6 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 26 Oct 2024
0.6
Details
Share
Follow
7
Nottinghamshire County Council logo
MAJOR
  
SELSIDE COURT 
(0.7 miles)
Nottinghamshire County Council
Works for road purposes - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 2 Sep 2024 - 31 Oct 2024
0.7
Details
Share
Follow
8
Severn Trent Water logo
MAJOR
  
NOTTINGHAM ROAD 
(0.7 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 21 Oct 2024 - 23 Oct 2025)
0.7
Details
Share
9
Severn Trent Water logo
NOTTINGHAM ROAD 
(0.7 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Two-way signals
Complete
24 Oct 2024 10:00 - 25 Oct 2024 15:00
0.7
Details
Share
10
Cadent Gas logo
EMERGENCY
  
SANDOWN ROAD 
(1.0 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Footpath - Some carriageway incursion
In Progress
Since: 25 Oct 2024 10:00
(Scheduled: 25 Oct 2024 - 31 Oct 2024)
1.0
Details
Share
Follow