ROADWORKS SUMMARY
Chilwell, Beeston, NOTTINGHAM, NG9 5HA
Introduction

View current and future planned roadworks and road closures for NG9 5HA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Chilwell, Beeston, NOTTINGHAM, NG9 5HA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
23 Nov 2025
Nottingham City Council are carrying out Highway improvement works on Maid Marian Way, Nottingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2024 at 00:00 and could run through until 23 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 1 Sep 2025 at 12:45.
23 Nov 2025
Nottingham City Council are carrying out Highway improvement works on Upper Parliament Street, Nottingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2024 at 00:00 and could run through until 23 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 1 Sep 2025 at 12:44.
23 Nov 2025
Nottingham City Council are carrying out Highway improvement works on Derby Road, Nottingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2024 at 00:00 and could run through until 23 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 1 Sep 2025 at 12:44.
23 Nov 2025
Nottingham City Council are carrying out Highway improvement works on Tollhouse Hill, Nottingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2024 at 00:00 and could run through until 23 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 1 Sep 2025 at 12:44.
30 Mar 2026
National Highways are carrying out Works for road purposes on Long Lane, Kegworth.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 June 2024 at 13:03 and could run through until 30 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Jun 2025 at 13:05.
30 Apr 2026
National Highways are carrying out Works for road purposes on Wollaton Vale, Nottingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 20:00 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Mar 2025 at 15:54.
21 Oct 2024 and 23 Oct 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Nottingham Road, Stapleford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 12:28.
21 Jul and 17 Oct 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Coventry Lane, Bramcote.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Nottinghamshire County Council on 15 Jul 2025 at 10:17.
21 Nov 2025
Nottinghamshire County Council are carrying out Works for road purposes on Coventry Lane, Bramcote.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 12:09 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 1 Oct 2025 at 11:28.
18 Sep and 17 Oct 2025
Nottingham City Council are proposing to carry out Highway improvement works on Queens Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 11 Sep 2025 at 13:59.
18 Sep and 17 Oct 2025
Nottingham City Council are proposing to carry out Highway improvement works on Queens Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 19 Sep 2025 at 12:10.
18 Sep and 17 Oct 2025
Nottingham City Council are proposing to carry out Highway improvement works on Queens Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 11 Sep 2025 at 13:59.
18 Sep and 17 Oct 2025
Nottingham City Council are proposing to carry out Highway improvement works on Queens Road, Nottingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 19 Sep 2025 at 12:10.
22 Sep and 7 Nov 2025
Severn Trent Water were proposing to carry out Utility asset works on Tamworth Road, Lockington-hemington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 1 Jul 2025 at 08:38.
22 Sep and 17 Oct 2025
Nottingham City Council are proposing to carry out Highway improvement works on Wilford Crescent East, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Jul 2025 at 12:49.
17 Oct 2025
Nottingham City Council are carrying out Highway improvement works on Wilford Crescent East, Nottingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2025 at 08:56 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 22 Sep 2025 at 09:38.
24 Sep and 11 Nov 2025
Severn Trent Water were proposing to carry out Utility asset works on Tamworth Road, Lockington-hemington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 September 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Jul 2025 at 11:25.
28 Nov 2025
Nottinghamshire County Council are carrying out roadworks on Rugby Road, West Bridgford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 October 2025 at 08:10 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 2 Oct 2025 at 11:56.
15 Oct 2025
Western Power Distribution (Telecoms) are carrying out Utility asset works on Thane Road, Beeston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 September 2025 at 08:30 and could run through until 15 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 6 Oct 2025 at 16:12.
Tuesday
Western Power Distribution (Telecoms) were proposing to carry out Utility asset works on Thane Road, Beeston.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2025 and run through until 14 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 18 Sep 2025 at 09:48.
Tuesday
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Thane Road, Beeston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 22 Sep 2025 at 08:01.
Friday
Derbyshire County Council are carrying out Highway repair and maintenance works on College Street, Long Eaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 19:00 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 8 Oct 2025 at 07:23.
17 Oct 2025
Nottinghamshire County Council are carrying out Works for road purposes on The Rushes, Gotham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 07:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 6 Oct 2025 at 08:51.
17 Oct 2025
Nottinghamshire County Council are carrying out Works for road purposes on The Rushes, Gotham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 07:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 6 Oct 2025 at 08:52.
Today
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Dovedale Avenue, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 11 Jun 2025 at 10:10.
Today
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Dovedale Avenue, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 19 Aug 2025 at 15:50.
Today
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Thoresby Road, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 11 Jun 2025 at 10:53.
Today
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Thoresby Road, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 19 Aug 2025 at 11:25.
6 Oct and 28 Nov 2025
Nottinghamshire County Council are proposing to carry out Highway improvement works on Allison Gardens, Chilwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 27 Aug 2025 at 09:37.
28 Nov 2025
Nottinghamshire County Council are carrying out Highway improvement works on Allison Gardens, Chilwell.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 08:00 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 6 Oct 2025 at 08:01.
Friday
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Marl Road, Radcliffe On Trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Jul 2025 at 17:03.
Friday
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Marl Road, Radcliffe On Trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Jul 2025 at 15:52.
Friday
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Wilmot Street, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 11 Jun 2025 at 12:01.
Tuesday
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Wilmot Street, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 8 Oct 2025 at 07:52.
13 and 31 Oct 2025
Nottinghamshire County Council were proposing to carry out Works for road purposes on Nottingham Road, Stapleford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 9 Sep 2025 at 15:45.
13 and 17 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cow Lane, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Jul 2025 at 14:43.
13 and 17 Oct 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Cow Lane, Bramcote.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Oct 2025 at 16:10.
13 Oct and 9 Nov 2025
Derbyshire County Council are proposing to carry out roadworks on Lows Lane, Stanton By Dale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Derbyshire County Council on 23 Sep 2025 at 08:57.
13 Oct and 30 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Cossall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 08:06.
13 Oct and 30 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Cossall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 08:35.
14 and 16 Oct 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility repair and maintenance works on Landmere Lane, Ruddington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2025 and run through until 16 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Oct 2025 at 12:01.
14 and 22 Oct 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Abbey Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 2 Jul 2025 at 13:19.
15 Oct and 1 Nov 2025
Vodafone were proposing to carry out Utility asset works on A52 From M1 J25 To J A6005 W, Erewash.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2025 and run through until 1 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Vodafone on 24 Sep 2025 at 10:42.
20 Oct and 7 Nov 2025
UK Power Distribution are proposing to carry out New service connection on Tamworth Road, Lockington-hemington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Distribution on 7 Oct 2025 at 13:13.
20 and 22 Oct 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Easthorpe Street, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2025 at 14:18.
20 and 24 Oct 2025
Severn Trent Water were proposing to carry out Remedial works on Nottingham Road, Toton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 15 Jul 2025 at 11:29.
20 and 31 Oct 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Seaburn Road, Toton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 28 Jul 2025 at 11:48.
20 and 22 Oct 2025
Severn Trent Water are proposing to carry out Remedial works on Carlyle Road, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 09:15.
20 and 22 Oct 2025
Severn Trent Water are proposing to carry out Remedial works on Carlyle Road, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 10:36.
20 Oct and 7 Nov 2025
Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Pasture Road, Stapleford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 2 Oct 2025 at 09:53.
20 Oct and 7 Nov 2025
Nottingham City Council are proposing to carry out Highway improvement works on Woodhouse Way, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 25 Sep 2025 at 10:19.
20 Oct and 7 Nov 2025
Nottingham City Council are proposing to carry out Highway improvement works on Woodhouse Way, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 26 Sep 2025 at 11:34.
20 and 22 Oct 2025
Severn Trent Water are proposing to carry out New service connection on East Street, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 23 Jul 2025 at 12:18.
20 and 22 Oct 2025
Severn Trent Water are proposing to carry out New service connection on East Street, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 09:40.
20 Oct and 3 Nov 2025
Nottingham City Council are proposing to carry out Highway improvement works on Sherborne Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:21.
20 and 31 Oct 2025
Nottingham City Council are proposing to carry out Highway improvement works on Sherborne Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 25 Jul 2025 at 11:02.
21 and 25 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Douglas Road, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 23 Jul 2025 at 12:26.
21 and 25 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Douglas Road, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 31 Jul 2025 at 10:16.
22 and 24 Oct 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Thornhill Close, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2025 at 14:29.
24 and 27 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on The Wharf, Shardlow, Derby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 14 Aug 2025 at 10:50.
27 Oct and 12 Dec 2025
Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Pasture Road, Stapleford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 17 Jul 2025 at 12:37.
27 Oct and 21 Nov 2025
Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Pasture Road, Stapleford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 16 Jul 2025 at 07:47.
29 and 31 Oct 2025
Severn Trent Water are proposing to carry out New service connection on Anslow Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 29 Jul 2025 at 12:31.
29 and 31 Oct 2025
Severn Trent Water are proposing to carry out New service connection on Anslow Avenue, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Jul 2025 at 14:53.
29 Oct and 7 Dec 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Rivergreen Crescent, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 25 Sep 2025 at 12:18.
29 and 31 Oct 2025
Severn Trent Water are proposing to carry out New service connection on East Street, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 14:16.
31 Oct 2025 and 31 Mar 2026
Nottingham City Council are proposing to carry out Highway improvement works on Bobbers Mill Bridge, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottingham City Council on 31 Jul 2025 at 12:44.
3 and 7 Nov 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Loughborough Road, West Bridgford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 22 Jul 2025 at 09:36.
3 and 28 Nov 2025
Nottingham City Council are proposing to carry out Highway improvement works on Queens Drive, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 8 Sep 2025 at 13:52.
3 and 17 Nov 2025
Nottingham City Council are proposing to carry out Highway improvement works on Bastion Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:21.
3 and 7 Nov 2025
Nottingham City Council are proposing to carry out Highway improvement works on Bastion Street, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 25 Jul 2025 at 11:02.
4 and 13 Nov 2025
Nottingham City Council are proposing to carry out Highway improvement works on Woodkirk Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottingham City Council on 26 Sep 2025 at 14:53.
6 and 13 Nov 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Peatfield Road, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 11 Jul 2025 at 07:46.
6 and 13 Nov 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Peatfield Road, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 11 Jul 2025 at 09:42.
10 Nov and 7 Dec 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Denewood Avenue, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 25 Sep 2025 at 12:18.
10 Nov and 7 Dec 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Rivergreen Close, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 25 Sep 2025 at 12:18.
10 Nov and 7 Dec 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Totland Road, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 25 Sep 2025 at 12:18.
14 Nov and 10 Dec 2025
Vodafone were proposing to carry out Utility asset works on A52 From M1 J25 To J A6005 W, Erewash.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 November 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Vodafone on 24 Sep 2025 at 10:42.
17 and 23 Nov 2025
Severn Trent Water are proposing to carry out Remedial works on Sawley Road, Breaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 23 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 30 Sep 2025 at 08:48.
17 and 20 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Clarehaven, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Jul 2025 at 08:34.
17 and 20 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Clarehaven, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 27 Aug 2025 at 08:05.
17 and 19 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Cliffe Hill Avenue, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 08:50.
17 and 19 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Cliffe Hill Avenue, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 09:33.
17 and 19 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Cliffe Hill Avenue, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Sep 2025 at 11:21.
17 and 21 Nov 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Wilford Grove, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 8 Aug 2025 at 12:19.
17 Nov and 19 Dec 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Burnside Drive, Bramcote.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2025 at 13:25.
18 and 20 Nov 2025
BT are proposing to carry out Utility repair and maintenance works on Stapleford Lane, Toton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 26 Aug 2025 at 13:01.
19 and 23 Nov 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility repair and maintenance works on Bostocks Lane, Sandiacre.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 8 Sep 2025 at 15:37.
19 and 23 Nov 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility repair and maintenance works on Bostocks Lane, Sandiacre.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 15 Sep 2025 at 14:31.
19 and 21 Nov 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility repair and maintenance works on Bostocks Lane, Sandiacre.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 21 November 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 26 Aug 2025 at 16:18.
19 Nov and 4 Dec 2025
National Highways are proposing to carry out Works for road purposes on Woodside Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Sep 2025 at 15:29.
19 Nov and 4 Dec 2025
National Highways are proposing to carry out Works for road purposes on Wollaton Vale, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Sep 2025 at 15:27.
24 and 28 Nov 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on New Lawn Road, Ilkeston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Sep 2025 at 16:19.
25 Nov and 9 Dec 2025
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Redfield Road, Nottingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 25 Sep 2025 at 14:45.
25 Nov and 9 Dec 2025
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Redfield Road, Nottingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 30 Sep 2025 at 14:46.
25 Nov and 9 Dec 2025
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Redfield Road, Nottingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 1 Oct 2025 at 09:24.
26 and 28 Nov 2025
Severn Trent Water are proposing to carry out New service connection on East Street, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 13:54.
1 and 6 Dec 2025
Telefonica UK were proposing to carry out Utility repair and maintenance works on Stanton Road, Ilkeston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 6 December 2025. The works were due to impact the verge only.
This roadwork event was last updated by Telefonica UK on 4 Sep 2025 at 15:17.
1 and 6 Dec 2025
Telefonica UK were proposing to carry out Utility repair and maintenance works on Stanton Road, Ilkeston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 6 December 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Telefonica UK on 9 Sep 2025 at 14:34.
4 and 9 Dec 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Glebe Street, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 24 Sep 2025 at 13:03.
4 and 9 Dec 2025
Nottinghamshire County Council were proposing to carry out Works for road purposes on Glebe Street, Beeston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2025 and run through until 9 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 3 Oct 2025 at 11:27.
4 and 11 Dec 2025
National Highways are proposing to carry out Works for road purposes on Woodside Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Sep 2025 at 15:28.
4 and 11 Dec 2025
National Highways are proposing to carry out Works for road purposes on Wollaton Vale, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Sep 2025 at 15:28.
5 and 12 Dec 2025
Derbyshire County Council are proposing to carry out Section 50 on Oxford Street, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 30 Sep 2025 at 15:12.
6 and 8 Dec 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Town Street, Bramcote.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 December 2025 and run through until 8 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Sep 2025 at 11:14.
8 and 15 Dec 2025
Derbyshire County Council are proposing to carry out Section 50 on Oxford Street, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 7 Oct 2025 at 15:13.
8 and 20 Dec 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Stapleford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 20 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2025 at 12:36.
8 and 12 Dec 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Deddington Lane, Bramcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 29 Aug 2025 at 11:39.
8 and 23 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Kensington Gardens, Larklands, Ilkeston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 23 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2025 at 08:30.
10 and 17 Dec 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Cromwell Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 24 Sep 2025 at 13:03.
10 and 17 Dec 2025
Nottinghamshire County Council were proposing to carry out Works for road purposes on Cromwell Road, Beeston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2025 and run through until 17 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 3 Oct 2025 at 11:28.
29 and 31 Dec 2025
Severn Trent Water are proposing to carry out New service connection on Bennett Street, Long Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 December 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 24 Sep 2025 at 13:24.
5 Jan and 27 Feb 2026
Nottinghamshire County Council are proposing to carry out Highway improvement works on Pasture Road, Stapleford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 27 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 17 Jul 2025 at 14:50.
5 and 13 Jan 2026
National Highways are proposing to carry out Works for road purposes on Derby Road, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 13 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Sep 2025 at 08:27.
5 and 13 Jan 2026
National Highways are proposing to carry out Works for road purposes on Middleton Boulevard, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 13 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Sep 2025 at 08:27.
5 and 21 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Trowell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 21 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 08:02.
5 Jan and 2 Feb 2026
Cadent Gas are proposing to carry out Utility asset works on Waterloo Lane, Trowell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 2 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 08:03.
5 Jan and 2 Feb 2026
Cadent Gas are proposing to carry out Utility asset works on M1 From Trowell Services To J A609 S, Broxtowe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 2 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 09:48.
5 and 26 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Park Road, Ilkeston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 26 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2025 at 09:00.
5 and 20 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Doris Road, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 20 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2025 at 09:00.
5 and 20 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Millfield Road, Larklands, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 20 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 12:00.
Roadworks Map near to Chilwell, Beeston, NOTTINGHAM, NG9 5HA (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Chilwell, Beeston, NOTTINGHAM, NG9 5HA (16 Events)
(Scheduled Dates)
(miles)
(Scheduled: 7 Oct 2025 - 13 Oct 2025)
(Scheduled: 7 Oct 2025 - 10 Oct 2025)
(Scheduled: 29 Sep 2025 - 10 Oct 2025)
(Scheduled: 6 Oct 2025 - 28 Nov 2025)
Contains public sector information licensed under the Open Government Licence v3.0.