ROADWORKS SUMMARY
Southwark Street, NOTTINGHAM, NG6 0BN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Southwark Street, NG6 0BN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Southwark Street, NOTTINGHAM, NG6 0BN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Southwark Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Nottingham City Council logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Maid Marian Way

Nottingham City Council are carrying out Highway improvement works on Maid Marian Way, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 1 Sep 2025 at 12:45.

Nottingham City Council logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Upper Parliament Street

Nottingham City Council are carrying out Highway improvement works on Upper Parliament Street, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 1 Sep 2025 at 12:44.

Nottingham City Council logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Derby Road

Nottingham City Council are carrying out Highway improvement works on Derby Road, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 1 Sep 2025 at 12:44.

Nottingham City Council logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Tollhouse Hill

Nottingham City Council are carrying out Highway improvement works on Tollhouse Hill, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:00 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 1 Sep 2025 at 12:44.

National Highways logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
Wollaton Vale

National Highways are carrying out Works for road purposes on Wollaton Vale, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 20:00 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Mar 2025 at 15:54.

Severn Trent Water logo
LONG TERM
Between
21 Oct 2024 and 23 Oct 2025
Details
View Map
Share
Victoria Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 10:32.

Nottinghamshire County Council logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Shilo Way

Nottinghamshire County Council are carrying out Works for road purposes on Shilo Way, Cossall.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 08:00 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 19 Sep 2025 at 10:20.

Nottinghamshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Coventry Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Coventry Lane, Bramcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 15 Jul 2025 at 10:17.

Nottinghamshire County Council logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Coventry Lane

Nottinghamshire County Council are carrying out Works for road purposes on Coventry Lane, Bramcote.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 12:09 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 1 Oct 2025 at 11:28.

Nottinghamshire County Council logo
LONG TERM
Between
18 Aug and 25 Oct 2025
Details
View Map
Share
Follow
Maple Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Maple Drive, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 24 Apr 2025 at 10:40.

Nottinghamshire County Council logo
LONG TERM
Between
18 Aug and 25 Oct 2025
Details
View Map
Share
Follow
Elm Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Elm Avenue, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 24 Apr 2025 at 10:40.

Nottinghamshire County Council logo
LONG TERM
Between
18 Aug and 25 Oct 2025
Details
View Map
Share
Follow
Salterford Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Salterford Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 24 Apr 2025 at 10:40.

Nottinghamshire County Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Clifton Grove

Nottinghamshire County Council are carrying out Works for road purposes on Clifton Grove, Gedling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:30 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2025 at 13:13.

Nottinghamshire County Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Linby Close

Nottinghamshire County Council are carrying out Works for road purposes on Linby Close, Gedling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:30 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2025 at 13:42.

Nottinghamshire County Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Perlethorpe Crescent

Nottinghamshire County Council are carrying out Works for road purposes on Perlethorpe Crescent, Gedling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:30 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2025 at 14:02.

Nottinghamshire County Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Hucknall Crescent

Nottinghamshire County Council are carrying out Works for road purposes on Hucknall Crescent, Gedling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:30 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2025 at 13:21.

Nottinghamshire County Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Perlethorpe Drive

Nottinghamshire County Council are carrying out Works for road purposes on Perlethorpe Drive, Gedling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:30 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2025 at 14:03.

Nottinghamshire County Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Perlethorpe Close

Nottinghamshire County Council are carrying out Works for road purposes on Perlethorpe Close, Gedling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:30 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2025 at 13:30.

Nottingham City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Queens Road

Nottingham City Council are proposing to carry out Highway improvement works on Queens Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 11 Sep 2025 at 13:59.

Nottingham City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Queens Road

Nottingham City Council are proposing to carry out Highway improvement works on Queens Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Sep 2025 at 12:10.

Nottingham City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Queens Road

Nottingham City Council are proposing to carry out Highway improvement works on Queens Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 11 Sep 2025 at 13:59.

Nottingham City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Queens Road

Nottingham City Council are proposing to carry out Highway improvement works on Queens Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Sep 2025 at 12:10.

Nottingham City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wilford Crescent East

Nottingham City Council are proposing to carry out Highway improvement works on Wilford Crescent East, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 22 Jul 2025 at 12:49.

Nottingham City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wilford Crescent East

Nottingham City Council are carrying out Highway improvement works on Wilford Crescent East, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 08:56 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 22 Sep 2025 at 09:38.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Duchess Gardens

Cadent Gas are carrying out Utility asset works on Duchess Gardens, Nottingham.

These works are categorised as Major.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 26 September 2025 at 15:25 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 15:28.

Nottinghamshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Elm Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Elm Avenue, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 28 Apr 2025 at 11:55.

Nottinghamshire County Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Rugby Road

Nottinghamshire County Council are carrying out roadworks on Rugby Road, West Bridgford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2025 at 08:10 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 2 Oct 2025 at 11:56.

Finishing
Wednesday
Details
View Map
Share
Follow
Thane Road

Western Power Distribution (Telecoms) are carrying out Utility asset works on Thane Road, Beeston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:30 and could run through until 15 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 6 Oct 2025 at 16:12.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Tavistock Close

Cadent Gas are proposing to carry out Utility asset works on Tavistock Close, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 12:32.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Tavistock Close

Cadent Gas are carrying out Utility asset works on Tavistock Close, Hucknall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 08:29.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beacon Hill Drive

Cadent Gas are proposing to carry out Utility asset works on Beacon Hill Drive, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 12:37.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beacon Hill Drive

Cadent Gas are carrying out Utility asset works on Beacon Hill Drive, Hucknall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 08:24.

Cadent Gas logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Polperro Way

Cadent Gas are proposing to carry out Utility asset works on Polperro Way, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 14:46.

Cadent Gas logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Polperro Way

Cadent Gas are proposing to carry out Utility asset works on Polperro Way, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 15:32.

Cadent Gas logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Polperro Way

Cadent Gas are carrying out Utility asset works on Polperro Way, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 11:16.

Finishing
Tuesday
Details
View Map
Share
Thane Road

Western Power Distribution (Telecoms) were proposing to carry out Utility asset works on Thane Road, Beeston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2025 and run through until 14 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 18 Sep 2025 at 09:48.

Finishing
Tuesday
Details
View Map
Share
Follow
Thane Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Thane Road, Beeston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 22 Sep 2025 at 08:01.

Cadent Gas logo
Until
21 Oct 2025
Details
View Map
Share
Follow
Hoewood Road

Cadent Gas are carrying out Utility asset works on Hoewood Road, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 October 2025 at 12:40 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 13:10.

Nottingham City Council logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Daleside Road

Nottingham City Council are proposing to carry out Highway improvement works on Daleside Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:22.

Severn Trent Water logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Park Hill

Severn Trent Water are proposing to carry out Utility asset works on Park Hill, Awsworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2025 at 08:34.

Severn Trent Water logo
Until
2 Nov 2025
Details
View Map
Share
Follow
Park Hill

Severn Trent Water are carrying out Utility asset works on Park Hill, Awsworth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:59 and could run through until 2 November 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Severn Trent Water on 6 Oct 2025 at 14:13.

Cadent Gas logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Arch Hill

Cadent Gas are proposing to carry out Utility asset works on Arch Hill, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 14:11.

Cadent Gas logo
Until
24 Oct 2025
Details
View Map
Share
Follow
Arch Hill

Cadent Gas are carrying out Utility asset works on Arch Hill, Arnold.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 08:00 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 08:03.

Cadent Gas logo
LONG TERM
Between
6 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Nabbs Lane

Cadent Gas are proposing to carry out Utility asset works on Nabbs Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 13:16.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Shakespeare Street

Cadent Gas are carrying out Utility repair and maintenance works on Shakespeare Street, Nottingham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 17:36 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2025 at 08:42.

Cadent Gas logo
Until
6 Nov 2025
Details
View Map
Share
Follow
Hoewood Road

Cadent Gas are carrying out Utility asset works on Hoewood Road, Nottingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 October 2025 at 09:45 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2025 at 09:48.

Western Power Distribution (East Midlands) logo
Finishing
Monday
Details
View Map
Share
Watnall Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Watnall Road, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Oct 2025 at 14:24.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cow Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cow Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Jul 2025 at 14:43.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Cow Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Cow Lane, Bramcote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2025 at 16:10.

Cadent Gas logo
LONG TERM
Between
13 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Cossall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 08:06.

Cadent Gas logo
LONG TERM
Between
13 Oct and 30 Nov 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Cossall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 08:35.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Highfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Highfield Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Jul 2025 at 13:58.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Highfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Highfield Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Jul 2025 at 11:25.

Nottingham City Council logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Beckhampton Road

Nottingham City Council are proposing to carry out Highway improvement works on Beckhampton Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:22.

Nottingham City Council logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Beckhampton Road

Nottingham City Council are proposing to carry out Highway improvement works on Beckhampton Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 25 Jul 2025 at 11:03.

Nottinghamshire County Council logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Maple Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Maple Drive, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 28 Apr 2025 at 11:49.

Nottinghamshire County Council logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Maple Drive

Nottinghamshire County Council were proposing to carry out Works for road purposes on Maple Drive, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 22 Sep 2025 at 08:30.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Sandy Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Jul 2025 at 09:21.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Sandy Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Jul 2025 at 11:27.

Nottinghamshire County Council logo
Between
14 and 22 Oct 2025
Details
View Map
Share
Follow
Abbey Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Abbey Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 2 Jul 2025 at 13:19.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wollaton Street

Cadent Gas are proposing to carry out Utility asset works on Wollaton Street, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 14:45.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wollaton Street

Cadent Gas are proposing to carry out Utility asset works on Wollaton Street, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 10:31.

Western Power Distribution (East Midlands) logo
Between
18 and 20 Oct 2025
Details
View Map
Share
Watnall Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Watnall Road, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 October 2025 and run through until 20 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Oct 2025 at 15:02.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Carlyle Road

Severn Trent Water are proposing to carry out Remedial works on Carlyle Road, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 09:15.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Carlyle Road

Severn Trent Water are proposing to carry out Remedial works on Carlyle Road, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 10:36.

Western Power Distribution (East Midlands) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Peel Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Peel Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Aug 2025 at 15:28.

Western Power Distribution (East Midlands) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Peel Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Peel Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Sep 2025 at 08:21.

Vodafone logo
Between
20 and 28 Oct 2025
Details
View Map
Share
Follow
Oakdale Road

Vodafone are proposing to carry out Utility asset works on Oakdale Road, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 24 Mar 2025 at 10:27.

Vodafone logo
Between
20 and 28 Oct 2025
Details
View Map
Share
Follow
Oakdale Road

Vodafone are proposing to carry out Utility asset works on Oakdale Road, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 3 Apr 2025 at 16:06.

Nottingham City Council logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Woodhouse Way

Nottingham City Council are proposing to carry out Highway improvement works on Woodhouse Way, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 25 Sep 2025 at 10:19.

Nottingham City Council logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Woodhouse Way

Nottingham City Council are proposing to carry out Highway improvement works on Woodhouse Way, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 26 Sep 2025 at 11:34.

Cadent Gas logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ransom Drive

Cadent Gas are proposing to carry out Utility asset works on Ransom Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 11:52.

Cadent Gas logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ransom Drive

Cadent Gas are proposing to carry out Utility asset works on Ransom Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 08:51.

Cadent Gas logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ransom Road

Cadent Gas are proposing to carry out Utility asset works on Ransom Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 11:44.

Cadent Gas logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ransom Road

Cadent Gas are proposing to carry out Utility asset works on Ransom Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 08:51.

Cadent Gas logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Blyth Street

Cadent Gas are proposing to carry out Utility asset works on Blyth Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 11:48.

Cadent Gas logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Blyth Street

Cadent Gas are proposing to carry out Utility asset works on Blyth Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 08:51.

Nottingham City Council logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Sherborne Road

Nottingham City Council are proposing to carry out Highway improvement works on Sherborne Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:21.

Nottingham City Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Sherborne Road

Nottingham City Council are proposing to carry out Highway improvement works on Sherborne Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 25 Jul 2025 at 11:02.

Severn Trent Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Kersall Drive

Severn Trent Water are proposing to carry out Utility asset works on Kersall Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 27 Aug 2025 at 10:37.

Severn Trent Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Kersall Drive

Severn Trent Water are proposing to carry out Utility asset works on Kersall Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2025 at 09:03.

Cadent Gas logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Redhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 14:05.

Cadent Gas logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Redhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 09:22.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Emperors Way

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Emperors Way, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 8 Oct 2025 at 15:29.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Latin Grove

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Latin Grove, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 8 Oct 2025 at 15:28.

Nottinghamshire County Council logo
Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Emperors Way

Nottinghamshire County Council are proposing to carry out Section 50 on Emperors Way, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Oct 2025 at 14:14.

Nottinghamshire County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Emperors Way

Nottinghamshire County Council are proposing to carry out Section 50 on Emperors Way, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Oct 2025 at 14:43.

Cadent Gas logo
Between
21 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Wayford Walk

Cadent Gas are proposing to carry out Utility asset works on Wayford Walk, Nottingham.

These works are categorised as Major.

The works will start on or after 21 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 13:13.

Nottinghamshire County Council logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Thornhill Close

Nottinghamshire County Council are proposing to carry out Works for road purposes on Thornhill Close, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2025 at 14:29.

Western Power Distribution (East Midlands) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Woodborough Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Woodborough Road, Mapperley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 1 Oct 2025 at 10:48.

Western Power Distribution (East Midlands) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Storth Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Storth Avenue, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2025 at 15:08.

Western Power Distribution (East Midlands) logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Storth Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Storth Avenue, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Oct 2025 at 13:41.

Severn Trent Water logo
Between
26 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Jul 2025 at 09:39.

Severn Trent Water logo
Between
26 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Aug 2025 at 14:58.

Nottinghamshire County Council logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Cromford Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Cromford Road, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 1 Oct 2025 at 10:53.

Nottinghamshire County Council logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Cromford Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Cromford Road, West Bridgford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Oct 2025 at 11:50.

Nottinghamshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
First Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on First Avenue, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 8 Oct 2025 at 10:11.

Nottinghamshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
First Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on First Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 8 Oct 2025 at 10:48.

Severn Trent Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Highfield Road

Severn Trent Water were proposing to carry out Remedial works on Highfield Road, Nuthall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Jul 2025 at 10:28.

Cadent Gas logo
LONG TERM
Between
27 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Nabbs Lane

Cadent Gas are proposing to carry out Utility asset works on Nabbs Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 11:25.

Cadent Gas logo
Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Totnes Close

Cadent Gas are proposing to carry out Utility asset works on Totnes Close, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 13:18.

Severn Trent Water logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Mayfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mayfield Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Jul 2025 at 14:42.

Severn Trent Water logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Mayfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mayfield Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Aug 2025 at 08:29.

Severn Trent Water logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Anslow Avenue

Severn Trent Water are proposing to carry out New service connection on Anslow Avenue, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 29 Jul 2025 at 12:31.

Severn Trent Water logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Anslow Avenue

Severn Trent Water are proposing to carry out New service connection on Anslow Avenue, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Jul 2025 at 14:53.

Nottinghamshire County Council logo
LONG TERM
Between
29 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Rivergreen Crescent

Nottinghamshire County Council are proposing to carry out Works for road purposes on Rivergreen Crescent, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 25 Sep 2025 at 12:18.

Nottinghamshire County Council logo
LONG TERM
Between
29 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Drummond Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Drummond Drive, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 25 Sep 2025 at 14:25.

Nottinghamshire County Council logo
LONG TERM
Between
29 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Drummond Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Drummond Drive, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2025 at 14:40.

Western Power Distribution (East Midlands) logo
Between
30 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Watnall Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Watnall Road, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Oct 2025 at 14:47.

Nottingham City Council logo
LONG TERM
Between
31 Oct 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Bobbers Mill Bridge

Nottingham City Council are proposing to carry out Highway improvement works on Bobbers Mill Bridge, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottingham City Council on 31 Jul 2025 at 12:44.

Nottinghamshire County Council logo
LONG TERM
Between
1 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Holme Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Holme Road, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 3 Oct 2025 at 13:53.

Nottinghamshire County Council logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Holme Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Holme Road, West Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Aug 2025 at 11:32.

Nottingham City Council logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Queens Drive

Nottingham City Council are proposing to carry out Highway improvement works on Queens Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 8 Sep 2025 at 13:52.

Nottingham City Council logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Bastion Street

Nottingham City Council are proposing to carry out Highway improvement works on Bastion Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:21.

Nottingham City Council logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Bastion Street

Nottingham City Council are proposing to carry out Highway improvement works on Bastion Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 25 Jul 2025 at 11:02.

Nottingham City Council logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Colville Street

Nottingham City Council are proposing to carry out Highway improvement works on Colville Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:21.

Cornerstone Telecommunications Infrastructure logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
St Anns Valley

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility repair and maintenance works on St Anns Valley, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 6 Aug 2025 at 09:17.

Severn Trent Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Deep Furrow Avenue

Severn Trent Water were proposing to carry out Remedial works on Deep Furrow Avenue, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Oct 2025 at 14:20.

Severn Trent Water logo
LONG TERM
Between
3 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Seaton Crescent

Severn Trent Water are proposing to carry out Utility asset works on Seaton Crescent, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2025 at 14:51.

Severn Trent Water logo
LONG TERM
Between
3 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Seaton Crescent

Severn Trent Water are proposing to carry out Utility asset works on Seaton Crescent, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2025 at 13:54.

Severn Trent Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Sherborne Road

Severn Trent Water are proposing to carry out Utility asset works on Sherborne Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2025 at 14:36.

Severn Trent Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Sherborne Road

Severn Trent Water are proposing to carry out Utility asset works on Sherborne Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2025 at 13:55.

Nottinghamshire County Council logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Westdale Lane East

Nottinghamshire County Council are proposing to carry out Works for road purposes on Westdale Lane East, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Aug 2025 at 15:27.

Nottinghamshire County Council logo
Between
3 and 15 Nov 2025
Details
View Map
Share
Follow
Westdale Lane East

Nottinghamshire County Council are proposing to carry out Works for road purposes on Westdale Lane East, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Sep 2025 at 13:21.

Severn Trent Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Kersall Drive

Severn Trent Water were proposing to carry out Utility asset works on Kersall Drive, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Aug 2025 at 14:47.

Severn Trent Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Upminster Drive

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Upminster Drive, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 11 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2025 at 10:00.

Severn Trent Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Surgeys Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Surgeys Lane, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2025 at 10:05.

Cadent Gas logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Totnes Close

Cadent Gas are proposing to carry out Utility asset works on Totnes Close, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 15:27.

Cadent Gas logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Hillcrest Drive

Cadent Gas are proposing to carry out Utility asset works on Hillcrest Drive, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 13:18.

Cadent Gas logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Babbacombe Way

Cadent Gas are proposing to carry out Utility asset works on Babbacombe Way, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 13:18.

Cadent Gas logo
LONG TERM
Between
3 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Papplewick Lane

Cadent Gas are proposing to carry out Utility asset works on Papplewick Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 12:41.

Cadent Gas logo
LONG TERM
Between
3 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Papplewick Lane

Cadent Gas are proposing to carry out Utility asset works on Papplewick Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 11:14.

Western Power Distribution (East Midlands) logo
Between
6 and 22 Nov 2025
Details
View Map
Share
Follow
Lower Eldon Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lower Eldon Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Sep 2025 at 09:58.

Nottingham City Council logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Exeter Road

Nottingham City Council are proposing to carry out Highway improvement works on Exeter Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 25 Jul 2025 at 11:03.

Nottinghamshire County Council logo
Between
10 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Denewood Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Denewood Avenue, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 25 Sep 2025 at 12:18.

Nottinghamshire County Council logo
Between
10 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Rivergreen Close

Nottinghamshire County Council are proposing to carry out Works for road purposes on Rivergreen Close, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 25 Sep 2025 at 12:18.

Nottinghamshire County Council logo
Between
10 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Totland Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Totland Road, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 25 Sep 2025 at 12:18.

Nottingham City Council logo
Between
10 and 27 Nov 2025
Details
View Map
Share
Follow
Colville Street

Nottingham City Council are proposing to carry out Highway improvement works on Colville Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 27 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 26 Sep 2025 at 15:47.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Tulip Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Tulip Road, Awsworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Sep 2025 at 10:52.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Tulip Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Tulip Road, Awsworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Sep 2025 at 08:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Tulip Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Tulip Road, Awsworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Oct 2025 at 12:34.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Barlow Drive North

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Barlow Drive North, Awsworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Aug 2025 at 11:11.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Barlow Drive North

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Barlow Drive North, Awsworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Sep 2025 at 10:53.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Barlow Drive North

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Barlow Drive North, Awsworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Sep 2025 at 08:58.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Barlow Drive North

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Barlow Drive North, Awsworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Oct 2025 at 12:32.

Severn Trent Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Ashdale Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Ashdale Road, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Aug 2025 at 09:34.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Hillcrest Drive

Cadent Gas are proposing to carry out Utility asset works on Hillcrest Drive, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 15:27.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Babbacombe Way

Cadent Gas are proposing to carry out Utility asset works on Babbacombe Way, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 15:28.

Nottingham City Council logo
Between
11 and 25 Nov 2025
Details
View Map
Share
Follow
Exeter Road

Nottingham City Council are proposing to carry out Highway improvement works on Exeter Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:22.

Nottingham City Council logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Stoneycroft Road

Nottingham City Council are proposing to carry out Highway improvement works on Stoneycroft Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 26 Sep 2025 at 15:49.

Cornerstone Telecommunications Infrastructure logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Wilford Grove

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Wilford Grove, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 8 Aug 2025 at 12:19.

Severn Trent Water logo
LONG TERM
Between
17 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Burnside Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Burnside Drive, Bramcote.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Aug 2025 at 13:25.

Nottingham City Council logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Palmerston Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Palmerston Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 26 Sep 2025 at 15:05.

Nottingham City Council logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Stoneycroft Road

Nottingham City Council are proposing to carry out Highway improvement works on Stoneycroft Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:22.

Severn Trent Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Acton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Acton Road, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2025 at 10:05.

Severn Trent Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Acton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Acton Road, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2025 at 14:23.

Cadent Gas logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Common Lane

Cadent Gas are proposing to carry out Utility asset works on Common Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 13:17.

Cadent Gas logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Hayden Lane

Cadent Gas are proposing to carry out Utility asset works on Hayden Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 12:41.

Cadent Gas logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Hayden Lane

Cadent Gas are proposing to carry out Utility asset works on Hayden Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 11:13.

National Highways logo
Between
19 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Woodside Road

National Highways are proposing to carry out Works for road purposes on Woodside Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Sep 2025 at 15:29.

National Highways logo
Between
19 Nov and 4 Dec 2025
Details
View Map
Share
Follow
Wollaton Vale

National Highways are proposing to carry out Works for road purposes on Wollaton Vale, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Sep 2025 at 15:27.

Nottinghamshire County Council logo
Between
24 and 29 Nov 2025
Details
View Map
Share
Follow
Colwick Loop Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Colwick Loop Road, Colwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Aug 2025 at 16:05.

Nottinghamshire County Council logo
Between
24 and 29 Nov 2025
Details
View Map
Share
Follow
Colwick Loop Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Colwick Loop Road, Colwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Sep 2025 at 10:16.

Severn Trent Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Curzon Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Curzon Street, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Severn Trent Water on 26 Aug 2025 at 11:29.

Severn Trent Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Curzon Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Curzon Street, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Severn Trent Water on 28 Aug 2025 at 11:37.

Nottingham City Council logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Prendwick Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Prendwick Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 26 Sep 2025 at 15:50.

Nottingham City Council logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Prendwick Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Prendwick Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 29 Sep 2025 at 10:19.

Cadent Gas logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 10:56.

Between
25 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Redfield Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Redfield Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 25 Sep 2025 at 14:45.

Between
25 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Redfield Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Redfield Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 30 Sep 2025 at 14:46.

Between
25 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Redfield Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Redfield Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 1 Oct 2025 at 09:24.

Severn Trent Water logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Lady Bay Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Lady Bay Road, West Bridgford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2025 at 16:14.

Nottingham City Council logo
Between
1 and 15 Dec 2025
Details
View Map
Share
Follow
Palmerston Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Palmerston Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 23 Jul 2025 at 15:22.

BT logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Shilo Way

BT are proposing to carry out Utility asset works on Shilo Way, Cossall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Sep 2025 at 09:44.

BT logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Shilo Way

BT were proposing to carry out Utility asset works on Shilo Way, Cossall.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 13 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Sep 2025 at 10:05.

Cadent Gas logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Rosegarth Walk

Cadent Gas are proposing to carry out Utility asset works on Rosegarth Walk, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 10:10.

Severn Trent Water logo
Between
1 and 26 Dec 2025
Details
View Map
Share
Park Hill

Severn Trent Water were proposing to carry out Utility asset works on Park Hill, Awsworth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 26 December 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2025 at 15:17.

Nottinghamshire County Council logo
Between
4 and 9 Dec 2025
Details
View Map
Share
Follow
Glebe Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Glebe Street, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 24 Sep 2025 at 13:03.

Nottinghamshire County Council logo
Between
4 and 9 Dec 2025
Details
View Map
Share
Glebe Street

Nottinghamshire County Council were proposing to carry out Works for road purposes on Glebe Street, Beeston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2025 and run through until 9 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 3 Oct 2025 at 11:27.

National Highways logo
Between
4 and 11 Dec 2025
Details
View Map
Share
Follow
Woodside Road

National Highways are proposing to carry out Works for road purposes on Woodside Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Sep 2025 at 15:28.

National Highways logo
Between
4 and 11 Dec 2025
Details
View Map
Share
Follow
Wollaton Vale

National Highways are proposing to carry out Works for road purposes on Wollaton Vale, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Sep 2025 at 15:28.

Severn Trent Water logo
Between
6 and 8 Dec 2025
Details
View Map
Share
Town Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Town Street, Bramcote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2025 and run through until 8 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2025 at 11:14.

Nottinghamshire County Council logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Deddington Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Deddington Lane, Bramcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 29 Aug 2025 at 11:39.

Nottinghamshire County Council logo
Between
10 and 17 Dec 2025
Details
View Map
Share
Follow
Cromwell Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Cromwell Road, Beeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 24 Sep 2025 at 13:03.

Nottinghamshire County Council logo
Between
10 and 17 Dec 2025
Details
View Map
Share
Cromwell Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Cromwell Road, Beeston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2025 and run through until 17 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 3 Oct 2025 at 11:28.

Nottinghamshire County Council logo
LONG TERM
Between
4 Jan and 6 Feb 2026
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Nottingham Road, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2026 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2025 at 14:40.

Between
5 and 29 Jan 2026
Details
View Map
Share
Follow
Queens Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Queens Road, Beeston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 29 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 9 Oct 2025 at 12:24.

National Highways logo
Between
5 and 13 Jan 2026
Details
View Map
Share
Follow
Derby Road

National Highways are proposing to carry out Works for road purposes on Derby Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Sep 2025 at 08:27.

National Highways logo
Between
5 and 13 Jan 2026
Details
View Map
Share
Follow
Middleton Boulevard

National Highways are proposing to carry out Works for road purposes on Middleton Boulevard, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 13 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Sep 2025 at 08:27.

Nottingham City Council logo
LONG TERM
Between
5 Jan and 29 Mar 2026
Details
View Map
Share
Follow
Daleside Road

Nottingham City Council are proposing to carry out Highway improvement works on Daleside Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 29 March 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nottingham City Council on 15 Sep 2025 at 09:58.

Cadent Gas logo
Between
5 and 21 Jan 2026
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Trowell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 21 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 08:02.

Cadent Gas logo
Between
5 Jan and 2 Feb 2026
Details
View Map
Share
Follow
Waterloo Lane

Cadent Gas are proposing to carry out Utility asset works on Waterloo Lane, Trowell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 2 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 08:03.

Cadent Gas logo
Between
5 Jan and 2 Feb 2026
Details
View Map
Share
Follow
M1 From Trowell Services To J A609 S

Cadent Gas are proposing to carry out Utility asset works on M1 From Trowell Services To J A609 S, Broxtowe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 2 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 09:48.

Nottinghamshire County Council logo
LONG TERM
Between
5 Jan and 28 Feb 2026
Details
View Map
Share
Follow
Colwick Loop Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Colwick Loop Road, Netherfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Sep 2025 at 15:59.

Nottinghamshire County Council logo
LONG TERM
Between
5 Jan and 28 Feb 2026
Details
View Map
Share
Follow
Colwick Loop Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Colwick Loop Road, Netherfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Oct 2025 at 15:33.

Nottinghamshire County Council logo
LONG TERM
Between
5 Jan and 28 Feb 2026
Details
View Map
Share
Follow
Victoria Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Victoria Road, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 28 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Nottinghamshire County Council on 26 Sep 2025 at 16:05.

Nottinghamshire County Council logo
LONG TERM
Between
5 Jan and 28 Feb 2026
Details
View Map
Share
Follow
Victoria Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Victoria Road, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 28 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Nottinghamshire County Council on 9 Oct 2025 at 15:34.

BT logo
Between
5 and 17 Jan 2026
Details
View Map
Share
Follow
Shilo Way

BT are proposing to carry out Utility asset works on Shilo Way, Cossall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 17 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Sep 2025 at 12:43.

Nottingham City Council logo
LONG TERM
Between
5 Jan and 6 Feb 2026
Details
View Map
Share
Follow
Hucknall Road

Nottingham City Council are proposing to carry out Highway improvement works on Hucknall Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottingham City Council on 3 Sep 2025 at 11:51.

Nottingham City Council logo
LONG TERM
Between
5 Jan and 6 Feb 2026
Details
View Map
Share
Follow
Hucknall Road

Nottingham City Council are proposing to carry out Highway improvement works on Hucknall Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottingham City Council on 4 Sep 2025 at 15:26.

Cadent Gas logo
LONG TERM
Between
5 Jan and 6 Feb 2026
Details
View Map
Share
Follow
Acton Road

Cadent Gas are proposing to carry out Utility asset works on Acton Road, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 10:38.

Cadent Gas logo
Between
5 and 23 Jan 2026
Details
View Map
Share
Follow
Buckingham Avenue

Cadent Gas are proposing to carry out Utility asset works on Buckingham Avenue, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 12:41.

Cadent Gas logo
Between
5 and 23 Jan 2026
Details
View Map
Share
Follow
Buckingham Avenue

Cadent Gas are proposing to carry out Utility asset works on Buckingham Avenue, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2026 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 11:14.

BT logo
Between
6 and 16 Jan 2026
Details
View Map
Share
Follow
Pelham Street

BT are proposing to carry out Utility repair and maintenance works on Pelham Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Oct 2025 at 12:06.

BT logo
Between
6 and 16 Jan 2026
Details
View Map
Share
Follow
Pelham Street

BT are proposing to carry out Utility repair and maintenance works on Pelham Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2026 and could run through until 16 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Oct 2025 at 15:10.


Roadworks Map near to Southwark Street, NOTTINGHAM, NG6 0BN (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 11 Oct 2025 00:53
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Southwark Street, NOTTINGHAM, NG6 0BN (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Severn Trent Water logo
URGENT
  
SILVERDALE ROAD 
(0.6 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Give and take
Complete
10 Oct 2025 12:57 - 15:09
0.6
Details
Share
2
Western Power Distribution (East Midlands) logo
URGENT
  
KERSALL DRIVE 
(0.6 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 7 Oct 2025 14:45
(Scheduled: 7 Oct 2025 - 13 Oct 2025)
0.6
Details
Share
Follow
3
Western Power Distribution (East Midlands) logo
PERRY ROAD 
(0.6 miles)
Western Power Distribution (East Midlands)
New service connection - Footway - Some carriageway incursion
In Progress
Since: 7 Oct 2025 09:57
(Scheduled: 7 Oct 2025 - 11 Oct 2025)
0.6
Details
Share
Follow
4
Cadent Gas logo
MAJOR
  
HOLLYDENE CRESCENT 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 15 Sep 2025 08:30
(Scheduled: 15 Sep 2025 - 24 Oct 2025)
0.7
Details
Share
Follow
5
Cadent Gas logo
MAJOR
  
MOLLINGTON SQUARE 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 29 Sep 2025 08:00
(Scheduled: 29 Sep 2025 - 17 Oct 2025)
0.7
Details
Share
Follow
6
BT logo
NESTON DRIVE 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
10 Oct 2025 09:21 - 13:57
0.8
Details
Share
7
Severn Trent Water logo
URGENT
  
COVENTRY ROAD 
(1.0 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 10 Oct 2025 23:45
(Scheduled: 10 Oct 2025 - 14 Oct 2025)
1.0
Details
Share
Follow