ROADWORKS SUMMARY
Hermes Way, SLEAFORD, NG34 7WH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hermes Way, NG34 7WH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hermes Way, SLEAFORD, NG34 7WH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hermes Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lincolnshire County Council logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Elmtree Road

Lincolnshire County Council are carrying out Highway improvement works on Elmtree Road, Ruskington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 00:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 24 Oct 2024 at 09:18.

Anglian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Park Lane

Anglian Water are carrying out Utility repair and maintenance works on Park Lane, Ewerby.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 12:44 and could run through until 25 November 2024. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 14:14.

Lincolnshire County Council logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Ruskington Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Ruskington Road, Leasingham Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 29 Oct 2024 at 09:42.

Lincolnshire County Council logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Ruskington Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Ruskington Road, Leasingham Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 28 Oct 2024 at 12:59.

Lincolnshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Village Street

Lincolnshire County Council are proposing to carry out Highway improvement works on Village Street, Oasby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 2 Aug 2024 at 13:17.

Lincolnshire County Council logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
East Road

Lincolnshire County Council are proposing to carry out Highway improvement works on East Road, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 29 Oct 2024 at 09:42.

Lincolnshire County Council logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
East Road

Lincolnshire County Council are proposing to carry out Highway improvement works on East Road, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 28 Oct 2024 at 12:59.

Network Rail logo
Between
8 and 13 Dec 2024
Details
View Map
Share
Follow
King Edward Street

Network Rail are proposing to carry out Works for Rail Purposes on King Edward Street, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 10:36.

Network Rail logo
Between
8 and 13 Dec 2024
Details
View Map
Share
Follow
King Edward Street

Network Rail are proposing to carry out Works for Rail Purposes on King Edward Street, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Apr 2024 at 10:05.

Network Rail logo
Between
8 and 13 Dec 2024
Details
View Map
Share
Follow
Castle Causeway

Network Rail are proposing to carry out Works for Rail Purposes on Castle Causeway, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 10:35.

Network Rail logo
Between
8 and 13 Dec 2024
Details
View Map
Share
Follow
Castle Causeway

Network Rail are proposing to carry out Works for Rail Purposes on Castle Causeway, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Apr 2024 at 10:05.

Lincolnshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Ewerby Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Ewerby Road, Kirkby La Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 14 Nov 2024 at 12:59.

Anglian Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Southgate

Anglian Water are proposing to carry out Utility repair and maintenance works on Southgate, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 24 Sep 2024 at 10:07.

Western Power Distribution (East Midlands) logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Gorse Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Gorse Lane, Silk Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2024 at 15:44.

Western Power Distribution (East Midlands) logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Gorse Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Gorse Lane, Silk Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Oct 2024 at 09:00.

Western Power Distribution (East Midlands) logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Gorse Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Gorse Lane, Silk Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Oct 2024 at 11:16.

Lincolnshire County Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Woodbridge Road

Lincolnshire County Council were proposing to carry out Highway improvement works on Woodbridge Road, Sleaford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 29 Oct 2024 at 11:57.

Lincolnshire County Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Woodbridge Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Woodbridge Road, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 29 Oct 2024 at 13:13.

Lincolnshire County Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Woodbridge Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Woodbridge Road, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 30 Oct 2024 at 15:53.

Lincolnshire County Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Woodbridge Road

Lincolnshire County Council were proposing to carry out Highway improvement works on Woodbridge Road, Sleaford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 11 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 29 Oct 2024 at 11:57.

Lincolnshire County Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Woodbridge Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Woodbridge Road, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 29 Oct 2024 at 13:13.

Lincolnshire County Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Woodbridge Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Woodbridge Road, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 30 Oct 2024 at 15:53.

Anglian Water logo
Between
12 and 15 Jan 2025
Details
View Map
Share
Follow
Southgate

Anglian Water are proposing to carry out Utility repair and maintenance works on Southgate, Sleaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2024 at 13:19.

Lincolnshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Main Street

Lincolnshire County Council are proposing to carry out Highway improvement works on Main Street, Wilsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 12 Nov 2024 at 15:02.

Lincolnshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Main Street

Lincolnshire County Council are proposing to carry out Highway improvement works on Main Street, Wilsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 13 Nov 2024 at 13:47.

Anglian Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Mareham Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Mareham Lane, Spanby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Oct 2024 at 13:36.

Lincolnshire County Council logo
Between
20 Jan and 5 Feb 2025
Details
View Map
Share
Follow
C336 A15 To Mareham Lane

Lincolnshire County Council are proposing to carry out Highway improvement works on C336 A15 To Mareham Lane, Aswarby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 1 Nov 2024 at 11:29.

Lincolnshire County Council logo
Between
20 Jan and 5 Feb 2025
Details
View Map
Share
Follow
C336 A15 To Mareham Lane

Lincolnshire County Council are proposing to carry out Highway improvement works on C336 A15 To Mareham Lane, Aswarby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 31 Oct 2024 at 13:52.

Anglian Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Mareham Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Mareham Lane, Spanby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 13:54.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
The Drove

Anglian Water were proposing to carry out New service connection on The Drove, Osbournby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 14:48.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
The Drove

Anglian Water are proposing to carry out New service connection on The Drove, Osbournby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 7 Nov 2024 at 11:48.


Roadworks Map near to Hermes Way, SLEAFORD, NG34 7WH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hermes Way, SLEAFORD, NG34 7WH (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nexfibre Networks Limited logo
SHELDRAKE ROAD 
(0.2 miles)
Nexfibre Networks Limited
Remedial works - Footway - Some carriageway incursion
Complete
21 Nov 2024 08:00 - 09:39
0.2
Details
Share
2
Cadent Gas logo
ALEXANDRA ROAD 
(0.7 miles)
Cadent Gas
Disconnection or alteration of supply - Footway - No carriageway incursion
In Progress
Since: 21 Nov 2024 08:50
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.7
Details
Share
Follow
3
Quickline Commucations logo
MURRAYFIELD AVENUE 
(0.9 miles)
Quickline Commucations
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.9
Details
Share
Follow
4
Western Power Distribution (East Midlands) logo
WESTGATE 
(0.9 miles)
Western Power Distribution (East Midlands)
New service connection - Footway - No carriageway incursion
Complete
15 Nov 2024 07:42 - 20 Nov 2024 12:22
0.9
Details
Share
5
Quickline Commucations logo
GLENGARRY WAY 
(0.9 miles)
Quickline Commucations
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.9
Details
Share
Follow
6
Quickline Commucations logo
HAMPDEN WAY 
(1.0 miles)
Quickline Commucations
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 19 Nov 2024 12:00
(Scheduled: 18 Nov 2024 - 21 Nov 2024)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.