ROADWORKS SUMMARY
Kelham Road, GRANTHAM, NG31 8NE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Kelham Road, NG31 8NE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Kelham Road, GRANTHAM, NG31 8NE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kelham Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Western Power Distribution (East Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Great North Road

Western Power Distribution (East Midlands) are carrying out New service connection on Great North Road, Grantham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 09:28 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Mar 2025 at 19:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Great North Road

Western Power Distribution (East Midlands) are carrying out New service connection on Great North Road, Grantham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:58 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Mar 2025 at 19:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Great North Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Great North Road, Grantham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 February 2025 at 08:25 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Mar 2025 at 19:56.

Western Power Distribution (East Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
South Parade

Western Power Distribution (East Midlands) are carrying out Utility asset works on South Parade, Grantham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 February 2025 at 08:37 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Mar 2025 at 19:56.

Western Power Distribution (East Midlands) logo
Finishing
Friday
Details
View Map
Share
Follow
South Parade

Western Power Distribution (East Midlands) are carrying out Utility asset works on South Parade, Grantham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 March 2025 at 08:09 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Mar 2025 at 19:56.

Lincolnshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Edward Street

Lincolnshire County Council are proposing to carry out Highway improvement works on Edward Street, Grantham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 4 Oct 2024 at 17:31.

Lincolnshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Unclassified Road From A607 To Main Street Syston

Lincolnshire County Council are proposing to carry out Highway improvement works on Unclassified Road From A607 To Main Street Syston, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Lincolnshire County Council on 22 Jan 2025 at 13:30.

Lincolnshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Unclassified Road From A607 To Main Street Syston

Lincolnshire County Council are proposing to carry out Highway improvement works on Unclassified Road From A607 To Main Street Syston, Syston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Lincolnshire County Council on 21 Jan 2025 at 13:56.

Lincolnshire County Council logo
LONG TERM
Between
31 Mar and 31 May 2025
Details
View Map
Share
Follow
Great North Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Great North Road, Grantham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 31 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Lincolnshire County Council on 20 Feb 2025 at 15:42.

Lincolnshire County Council logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Barrowby Road

Lincolnshire County Council were proposing to carry out Remedial works on Barrowby Road, Grantham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 9 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 21 Mar 2025 at 09:59.

Lincolnshire County Council logo
LONG TERM
Between
7 Apr and 9 May 2025
Details
View Map
Share
Follow
Green Hill Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Green Hill Road, Grantham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 20 Mar 2025 at 10:11.

Anglian Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Gorse Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Gorse Lane, Grantham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 16 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 27 Jan 2025 at 15:41.

Anglian Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Gorse Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Gorse Lane, Grantham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 16 Jan 2025 at 14:39.

Quickline Commucations logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Church Lane

Quickline Commucations are proposing to carry out Utility asset works on Church Lane, Welby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 23 Dec 2024 at 10:47.

Quickline Commucations logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Church Lane

Quickline Commucations are proposing to carry out Utility asset works on Church Lane, Welby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 30 Dec 2024 at 10:00.

Quickline Commucations logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Church Lane

Quickline Commucations are proposing to carry out Utility asset works on Church Lane, Welby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 27 Jan 2025 at 07:58.

Anglian Water logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Gorse Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Gorse Lane, Grantham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Feb 2025 at 11:46.

Leicestershire County Council logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Muston, Bottesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 30 Jan 2025 at 08:56.

Leicestershire County Council logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Muston, Bottesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 28 Jan 2025 at 09:36.

Quickline Commucations logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Hough Road

Quickline Commucations are proposing to carry out Utility asset works on Hough Road, Honington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 19 Feb 2025 at 10:42.

Quickline Commucations logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Hough Road

Quickline Commucations are proposing to carry out Utility asset works on Hough Road, Honington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 26 Feb 2025 at 10:28.

Quickline Commucations logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
West Street

Quickline Commucations are proposing to carry out Utility asset works on West Street, Barkston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 5 Mar 2025 at 13:31.

Quickline Commucations logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
West Street

Quickline Commucations are proposing to carry out Utility asset works on West Street, Barkston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 19 Feb 2025 at 10:42.

Lincolnshire County Council logo
Between
12 and 20 May 2025
Details
View Map
Share
Barrowby Road

Lincolnshire County Council were proposing to carry out Remedial works on Barrowby Road, Grantham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 21 Mar 2025 at 10:11.

Lincolnshire County Council logo
Between
12 and 20 May 2025
Details
View Map
Share
Follow
Barrowby Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Barrowby Road, Grantham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lincolnshire County Council on 21 Mar 2025 at 10:11.

Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
Trent Road

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Trent Road, Grantham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 23 Oct 2024 at 08:02.

Between
26 and 31 May 2025
Details
View Map
Share
Follow
Trent Road

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Trent Road, Grantham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 26 Feb 2025 at 08:08.

Anglian Water logo
Between
26 and 28 May 2025
Details
View Map
Share
Gelston Road

Anglian Water were proposing to carry out Remedial works on Gelston Road, Hougham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 28 May 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 17 Feb 2025 at 15:00.

Anglian Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Gelston Road

Anglian Water are proposing to carry out Remedial works on Gelston Road, Hougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 18 Feb 2025 at 08:18.

Anglian Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Gelston Road

Anglian Water are proposing to carry out Remedial works on Gelston Road, Hougham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 18 Feb 2025 at 15:49.

Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Buckminster Gardens

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Buckminster Gardens, Grantham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 26 Feb 2025 at 08:08.

LONG TERM
Between
6 Jun and 14 Aug 2025
Details
View Map
Share
Follow
Springfield Road

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Springfield Road, Grantham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 26 Feb 2025 at 08:08.

Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Harlaxton Road

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Harlaxton Road, Grantham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 23 Oct 2024 at 08:02.

LONG TERM
Between
16 Jun and 19 Sep 2025
Details
View Map
Share
Follow
Springfield Road

Advanced Electricty Networks Ltd are proposing to carry out Utility asset works on Springfield Road, Grantham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 23 Oct 2024 at 08:02.


Roadworks Map near to Kelham Road, GRANTHAM, NG31 8NE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Mar 2025 06:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Kelham Road, GRANTHAM, NG31 8NE (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (East Midlands) logo
URGENT
  
ARNOLD AVENUE 
(0.4 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 5 Mar 2025 11:00
(Scheduled: 5 Mar 2025 - 1 Apr 2025)
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.