ROADWORKS SUMMARY
Guildhall Street, NEWARK, NG24 1UH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Guildhall Street, NG24 1UH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Guildhall Street, NEWARK, NG24 1UH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Guildhall Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Nottinghamshire County Council logo
LONG TERM
Between
15 Mar 2024 and 14 Mar 2029
Details
View Map
Share
Follow
Hollowdyke Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hollowdyke Lane, Fernwood, Newark.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2024 and could run through until 14 March 2029. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 15 Dec 2023 at 09:49.

Nottinghamshire County Council logo
LONG TERM
Between
8 Jul 2024 and 7 Mar 2025
Details
View Map
Share
Follow
Sleaford Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Sleaford Road, Coddington, Newark.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 7 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 5 Jun 2024 at 09:30.

Nottinghamshire County Council logo
LONG TERM
Between
16 Sep 2024 and 30 Mar 2026
Details
View Map
Share
Follow
Hollowdyke Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hollowdyke Lane, Fernwood, Newark.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 30 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 22 Aug 2024 at 15:41.

Nottinghamshire County Council logo
LONG TERM
Between
16 Sep 2024 and 30 Mar 2026
Details
View Map
Share
Follow
Hollowdyke Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hollowdyke Lane, Fernwood, Newark.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 30 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 22 Aug 2024 at 15:40.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Gainsborough Road

Cadent Gas are carrying out Utility asset works on Gainsborough Road, Langford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:00 and could run through until 13 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:06.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Barnby Lane

Network Rail were proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Oct 2024 at 12:58.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2024 at 13:41.

BT logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Main Road

BT are carrying out Utility asset works on Main Road, Hockerton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 20:00 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 12 Nov 2024 at 08:18.

BT logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Main Street

BT are carrying out Utility asset works on Main Street, North Of Southwell, Upton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 20:00 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 12 Nov 2024 at 08:18.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Pelham Street

Cityfibre Metro Networks are carrying out Utility repair and maintenance works on Pelham Street, Newark On Trent.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Nov 2024 at 09:13.

Cityfibre Metro Networks logo
LONG TERM
Between
11 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Pelham Street

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Pelham Street, Newark On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 14:10.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Pelham Street

Cityfibre Metro Networks were proposing to carry out Utility repair and maintenance works on Pelham Street, Newark On Trent.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 15:42.

Cityfibre Metro Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Pelham Street

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Pelham Street, Newark On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 09:15.

Network Rail logo
Between
17 and 22 Nov 2024
Details
View Map
Share
Barnby Lane

Network Rail were proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Oct 2024 at 13:00.

Network Rail logo
Between
17 and 22 Nov 2024
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2024 at 12:53.

Nottinghamshire County Council logo
Between
24 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Lincoln Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Lincoln Street, Newark On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Sep 2024 at 11:56.

Nottinghamshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Lincoln Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Lincoln Street, Newark On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Nov 2024 at 11:55.

Cadent Gas logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Carrgate Lane

Cadent Gas are proposing to carry out Utility asset works on Carrgate Lane, Elston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 15:28.

BT logo
Between
11 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Main Street

BT were proposing to carry out Utility asset works on Main Street, North Of Southwell, Upton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 8 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 18 Sep 2024 at 11:51.

BT logo
Between
11 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Main Road

BT were proposing to carry out Utility asset works on Main Road, Hockerton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 8 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 18 Sep 2024 at 11:59.

Network Rail logo
Between
16 and 17 Dec 2024
Details
View Map
Share
Follow
Access To Mill Farm

Network Rail are proposing to carry out Works for Rail Purposes on Access To Mill Farm, Station Road, Rolleston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Nov 2024 at 08:35.

Network Rail logo
Between
16 and 17 Dec 2024
Details
View Map
Share
Follow
Access To Mill Farm

Network Rail are proposing to carry out Works for Rail Purposes on Access To Mill Farm, Station Road, Rolleston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Aug 2024 at 16:20.

Cadent Gas logo
Between
3 and 24 Jan 2025
Details
View Map
Share
Follow
Toad Lane

Cadent Gas are proposing to carry out Utility asset works on Toad Lane, Elston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 15:30.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
George Street

Cadent Gas were proposing to carry out Disconnection or alteration of supply on George Street, Newark On Trent.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 10:26.

BT logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Main Street

BT are proposing to carry out Utility asset works on Main Street, North Of Southwell, Upton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 18 Sep 2024 at 13:52.

BT logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Main Road

BT are proposing to carry out Utility asset works on Main Road, Averham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Sep 2024 at 15:15.

BT logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Main Road

BT are proposing to carry out Utility asset works on Main Road, Hockerton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Oct 2024 at 10:33.

BT logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Main Road

BT are proposing to carry out Utility asset works on Main Road, Averham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Sep 2024 at 15:38.

BT logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Main Road

BT are proposing to carry out Utility asset works on Main Road, Kelham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Sep 2024 at 15:38.

Nottinghamshire County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Micklebarrow Hill

Nottinghamshire County Council are proposing to carry out Works for road purposes on Micklebarrow Hill, Averham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 29 Oct 2024 at 15:44.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Marsh Lane

Severn Trent Water are proposing to carry out New service connection on Marsh Lane, Farndon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 11:58.

Nottinghamshire County Council logo
Between
21 and 30 Jan 2025
Details
View Map
Share
Follow
Newark Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Newark Road, Brough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 8 Nov 2024 at 11:19.

Nottinghamshire County Council logo
Between
21 and 30 Jan 2025
Details
View Map
Share
Follow
Newark Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Newark Road, Brough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 5 Sep 2024 at 16:51.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Marsh Lane

Severn Trent Water are proposing to carry out New service connection on Marsh Lane, Farndon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 14:36.

BT logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lincoln Road

BT are proposing to carry out Utility asset works on Lincoln Road, Newark On Trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 10 Oct 2024 at 16:05.

BT logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lincoln Road

BT are proposing to carry out Utility asset works on Lincoln Road, Newark On Trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 10 Oct 2024 at 16:06.

BT logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
A46 J A1/a17/b6166 From Roundabout West Of A1 To Roundabout East Of A1 Ne

BT are proposing to carry out Utility asset works on A46 J A1/a17/b6166 From Roundabout West Of A1 To Roundabout East Of A1 Ne, Newark And Sherwood.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 14 Oct 2024 at 16:08.

BT logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
A46 From J A1/a17/b6166 To J A1138 Ne

BT are proposing to carry out Utility asset works on A46 From J A1/a17/b6166 To J A1138 Ne, Newark And Sherwood.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 14 Oct 2024 at 16:08.

BT logo
Between
24 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Fosse Road

BT are proposing to carry out Utility asset works on Fosse Road, Brough.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 10 Oct 2024 at 12:26.

Lincolnshire County Council logo
Between
29 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Barnby Lane

Lincolnshire County Council are proposing to carry out Highway improvement works on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 14 Oct 2024 at 14:45.

Lincolnshire County Council logo
Between
29 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Barnby Lane

Lincolnshire County Council are proposing to carry out Highway improvement works on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 18 Oct 2024 at 09:58.


Roadworks Map near to Guildhall Street, NEWARK, NG24 1UH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Guildhall Street, NEWARK, NG24 1UH (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nottinghamshire County Council logo
EMERGENCY
  
ST MARKS PLACE 
(0.2 miles)
Nottinghamshire County Council
Works for road purposes - Footpath - Some carriageway incursion
In Progress
Since: 4 Nov 2024 11:15
(Scheduled: 4 Nov 2024 - 22 Nov 2024)
0.2
Details
Share
Follow
2
Nottinghamshire County Council logo
MARKET PLACE 
(0.2 miles)
Nottinghamshire County Council
Works for road purposes - Footway - No carriageway incursion
Planned
Scheduled: 13 Nov 2024
0.2
Details
Share
Follow
3
Nottinghamshire County Council logo
STODMAN STREET 
(0.2 miles)
Nottinghamshire County Council
Works for road purposes - Footway - No carriageway incursion
Planned
Scheduled: 13 Nov 2024
0.2
Details
Share
Follow
4
Cityfibre Metro Networks logo
PELHAM CLOSE 
(0.4 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 11 Nov 2024 09:00
(Scheduled: 11 Nov 2024 - 13 Nov 2024)
0.4
Details
Share
Follow
5
Cityfibre Metro Networks logo
MAJOR
  
PELHAM STREET 
(0.4 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 11 Nov 2024 - 10 Jan 2025
0.4
Details
Share
Follow
6
Cityfibre Metro Networks logo
MAJOR
  
PELHAM STREET 
(0.4 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 11 Nov 2024 - 15 Nov 2024)
0.4
Details
Share
7
Cityfibre Metro Networks logo
MAJOR
  
PELHAM STREET 
(0.4 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 11 Nov 2024 - 15 Nov 2024
0.4
Details
Share
Follow
8
Cityfibre Metro Networks logo
MAJOR
  
PELHAM STREET 
(0.4 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 11 Nov 2024 09:00
(Scheduled: 11 Nov 2024 - 15 Nov 2024)
0.4
Details
Share
Follow
9
Cityfibre Metro Networks logo
PELHAM STREET 
(0.4 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 11 Nov 2024 - 15 Nov 2024)
0.4
Details
Share
10
Cityfibre Metro Networks logo
MILL GATE 
(0.4 miles)
Cityfibre Metro Networks
Utility repair and maintenance works - Footway - Road closure
Cancelled
(Scheduled: 11 Nov 2024 - 15 Nov 2024)
0.4
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.