ROADWORKS SUMMARY
Guildhall Street, NEWARK, NG24 1UH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Guildhall Street, NG24 1UH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Guildhall Street, NEWARK, NG24 1UH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Guildhall Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Nottinghamshire County Council logo
LONG TERM
Until
3 Nov 2024
Details
View Map
Share
Follow
Farndon Lane

Nottinghamshire County Council are carrying out Works for road purposes on Farndon Lane, Hawton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 February 2024 at 09:00 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 28 Aug 2024 at 11:52.

Nottinghamshire County Council logo
LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Follow
Cotham Lane

Nottinghamshire County Council are carrying out Works for road purposes on Cotham Lane, Hawton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 March 2024 at 11:00 and could run through until 31 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 12 Mar 2024 at 12:48.

Nottinghamshire County Council logo
LONG TERM
Between
15 Mar 2024 and 14 Mar 2029
Details
View Map
Share
Follow
Hollowdyke Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hollowdyke Lane, Fernwood, Newark.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2024 and could run through until 14 March 2029. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 15 Dec 2023 at 09:49.

Nottinghamshire County Council logo
LONG TERM
Until
29 Sep 2024
Details
View Map
Share
Follow
Great North Road

Nottinghamshire County Council are carrying out Works for road purposes on Great North Road, Balderton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:00 and could run through until 29 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 3 Sep 2024 at 15:37.

Nottinghamshire County Council logo
LONG TERM
Between
8 Jul 2024 and 7 Mar 2025
Details
View Map
Share
Follow
Sleaford Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Sleaford Road, Coddington, Newark.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 7 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 5 Jun 2024 at 09:30.

Nottinghamshire County Council logo
LONG TERM
Between
31 Aug and 3 Nov 2024
Details
View Map
Share
Follow
Hawton Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hawton Road, Newark On Trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 3 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 28 Aug 2024 at 12:50.

Nottinghamshire County Council logo
LONG TERM
Between
31 Aug and 3 Nov 2024
Details
View Map
Share
Follow
Hawton Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hawton Road, Newark On Trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 3 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 28 Aug 2024 at 12:31.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Main Road

BT are proposing to carry out Utility asset works on Main Road, Averham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Sep 2024 at 16:11.

BT logo
Finishing
Friday
Details
View Map
Share
Main Road

BT were proposing to carry out Utility asset works on Main Road, Averham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 27 September 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Sep 2024 at 11:53.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Main Road

BT are proposing to carry out Utility asset works on Main Road, Averham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 15 Aug 2024 at 08:57.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Main Road

BT are proposing to carry out Utility asset works on Main Road, Averham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Sep 2024 at 16:13.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Main Road

BT are proposing to carry out Utility asset works on Main Road, Kelham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Sep 2024 at 16:14.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Main Road

BT are proposing to carry out Utility asset works on Main Road, Kelham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 15 Aug 2024 at 08:57.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Boundary Road

Nottinghamshire County Council are carrying out Works for road purposes on Boundary Road, Newark On Trent.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 09:00 and could run through until 27 September 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nottinghamshire County Council on 9 Sep 2024 at 09:03.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Street

Nottinghamshire County Council are carrying out Works for road purposes on Victoria Street, Newark On Trent.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 09:00 and could run through until 27 September 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Nottinghamshire County Council on 9 Sep 2024 at 09:02.

Nottinghamshire County Council logo
LONG TERM
Between
16 Sep 2024 and 30 Mar 2026
Details
View Map
Share
Follow
Hollowdyke Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hollowdyke Lane, Fernwood, Newark.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 30 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Aug 2024 at 15:40.

Nottinghamshire County Council logo
LONG TERM
Between
16 Sep 2024 and 30 Mar 2026
Details
View Map
Share
Follow
Hollowdyke Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Hollowdyke Lane, Fernwood, Newark.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 30 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Aug 2024 at 15:41.

BT logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Main Road

BT are carrying out Utility asset works on Main Road, Averham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 20:00 and could run through until 4 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Sep 2024 at 08:06.

BT logo
Between
16 Sep and 4 Oct 2024
Details
View Map
Share
Main Road

BT were proposing to carry out Utility asset works on Main Road, Averham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 4 October 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Sep 2024 at 15:05.

BT logo
Between
16 Sep and 4 Oct 2024
Details
View Map
Share
Main Road

BT were proposing to carry out Utility asset works on Main Road, Averham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 4 October 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Sep 2024 at 15:02.

BT logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Main Road

BT are carrying out Utility asset works on Main Road, Averham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 20:00 and could run through until 4 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Sep 2024 at 08:06.

BT logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Main Road

BT are carrying out Utility asset works on Main Road, Kelham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 20:00 and could run through until 4 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Sep 2024 at 08:07.

BT logo
Between
16 Sep and 4 Oct 2024
Details
View Map
Share
Main Road

BT were proposing to carry out Utility asset works on Main Road, Kelham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 4 October 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Sep 2024 at 15:04.

Nottinghamshire County Council logo
Until
1 Oct 2024
Details
View Map
Share
Follow
Gainsborough Road

Nottinghamshire County Council are carrying out Works for road purposes on Gainsborough Road, Winthorpe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 07:49 and could run through until 1 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Sep 2024 at 08:37.

Nottinghamshire County Council logo
Between
30 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Mill Gate

Nottinghamshire County Council are proposing to carry out Works for road purposes on Mill Gate, Newark On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 19 Jul 2024 at 10:27.

Network Rail logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Main Street

Network Rail are proposing to carry out Works for Rail Purposes on Main Street, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Aug 2024 at 15:57.

Network Rail logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Main Street

Network Rail are proposing to carry out Works for Rail Purposes on Main Street, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Jun 2024 at 11:26.

Network Rail logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Stubton Road

Network Rail are proposing to carry out Works for Rail Purposes on Stubton Road, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Aug 2024 at 15:57.

Network Rail logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Stubton Road

Network Rail are proposing to carry out Works for Rail Purposes on Stubton Road, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Jun 2024 at 11:38.

Western Power Distribution (East Midlands) logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Newark Road

Western Power Distribution (East Midlands) are proposing to carry out Utility repair and maintenance works on Newark Road, Brough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Jul 2024 at 12:16.

Western Power Distribution (East Midlands) logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Newark Road

Western Power Distribution (East Midlands) are proposing to carry out Utility repair and maintenance works on Newark Road, Brough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Sep 2024 at 15:15.

Network Rail logo
Between
4 and 10 Oct 2024
Details
View Map
Share
Follow
Stubton Road

Network Rail are proposing to carry out Works for Rail Purposes on Stubton Road, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 10 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Jun 2024 at 15:28.

Network Rail logo
Between
4 and 10 Oct 2024
Details
View Map
Share
Follow
Stubton Road

Network Rail are proposing to carry out Works for Rail Purposes on Stubton Road, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 10 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 13:52.

Network Rail logo
Between
4 and 10 Oct 2024
Details
View Map
Share
Follow
Main Street

Network Rail are proposing to carry out Works for Rail Purposes on Main Street, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 10 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Sep 2024 at 13:52.

Network Rail logo
Between
4 and 10 Oct 2024
Details
View Map
Share
Follow
Main Street

Network Rail are proposing to carry out Works for Rail Purposes on Main Street, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 10 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Jun 2024 at 15:28.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
7 and 31 Oct 2024
Details
View Map
Share
Follow
A46 From J A1138 To J A1/a17/b6166 Sw

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on A46 From J A1138 To J A1/a17/b6166 Sw, Newark And Sherwood.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 18 Jul 2024 at 12:28.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
7 and 31 Oct 2024
Details
View Map
Share
Follow
A46 J A1/a17/b6166 From Roundabout West Of A1 To Roundabout East Of A1 Ne

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on A46 J A1/a17/b6166 From Roundabout West Of A1 To Roundabout East Of A1 Ne, Newark And Sherwood.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 18 Jul 2024 at 12:29.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
7 and 31 Oct 2024
Details
View Map
Share
Follow
A46 From J A1/a17/b6166 To J A1138 Ne

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on A46 From J A1/a17/b6166 To J A1138 Ne, Newark And Sherwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 31 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 18 Jul 2024 at 12:28.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
7 and 31 Oct 2024
Details
View Map
Share
Follow
A46 From J A1138 To J A1/a17/b6166 Sw

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on A46 From J A1138 To J A1/a17/b6166 Sw, Newark And Sherwood.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 31 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 18 Jul 2024 at 12:29.

Western Power Distribution (East Midlands) logo
Between
7 and 10 Oct 2024
Details
View Map
Share
Follow
George Street

Western Power Distribution (East Midlands) are proposing to carry out Utility repair and maintenance works on George Street, Newark On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Sep 2024 at 15:12.

Western Power Distribution (East Midlands) logo
Between
7 and 9 Oct 2024
Details
View Map
Share
Follow
George Street

Western Power Distribution (East Midlands) are proposing to carry out Utility repair and maintenance works on George Street, Newark On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Sep 2024 at 09:38.

Cadent Gas logo
LONG TERM
Between
7 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Gainsborough Road

Cadent Gas are proposing to carry out Utility asset works on Gainsborough Road, Langford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:49.

Network Rail logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Sep 2024 at 13:01.

Network Rail logo
Between
14 and 18 Oct 2024
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Jul 2024 at 10:09.

Severn Trent Water logo
Between
15 and 17 Oct 2024
Details
View Map
Share
Follow
Grove Street

Severn Trent Water are proposing to carry out New service connection on Grove Street, Balderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Jul 2024 at 11:45.

Network Rail logo
Between
15 and 23 Oct 2024
Details
View Map
Share
Follow
Stubton Road

Network Rail are proposing to carry out Works for Rail Purposes on Stubton Road, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Sep 2024 at 14:12.

Network Rail logo
Between
15 and 23 Oct 2024
Details
View Map
Share
Follow
Stubton Road

Network Rail are proposing to carry out Works for Rail Purposes on Stubton Road, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Jun 2024 at 15:28.

Network Rail logo
Between
15 and 23 Oct 2024
Details
View Map
Share
Follow
Main Street

Network Rail are proposing to carry out Works for Rail Purposes on Main Street, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Jun 2024 at 15:28.

Network Rail logo
Between
15 and 23 Oct 2024
Details
View Map
Share
Follow
Main Street

Network Rail are proposing to carry out Works for Rail Purposes on Main Street, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Sep 2024 at 13:12.

Nottinghamshire County Council logo
Between
16 and 29 Oct 2024
Details
View Map
Share
Follow
Main Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Main Street, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 29 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Jul 2024 at 15:06.

Network Rail logo
Between
27 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2024 at 13:07.

Network Rail logo
Between
27 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Sep 2024 at 16:30.

Cadent Gas logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Middleton Road

Cadent Gas are proposing to carry out Utility asset works on Middleton Road, Newark On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 09:16.

Network Rail logo
Between
3 and 8 Nov 2024
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2024 at 13:07.

Network Rail logo
Between
3 and 8 Nov 2024
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Sep 2024 at 14:00.

Severn Trent Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Caunton Road

Severn Trent Water are proposing to carry out New service connection on Caunton Road, Norwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Aug 2024 at 16:07.

Severn Trent Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Caunton Road

Severn Trent Water are proposing to carry out New service connection on Caunton Road, Norwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Aug 2024 at 08:50.

Network Rail logo
Between
10 and 15 Nov 2024
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2024 at 13:41.

Network Rail logo
Between
17 and 22 Nov 2024
Details
View Map
Share
Follow
Barnby Lane

Network Rail are proposing to carry out Works for Rail Purposes on Barnby Lane, Claypole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jul 2024 at 12:53.

Nottinghamshire County Council logo
Between
24 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Lincoln Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Lincoln Street, Newark On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Sep 2024 at 11:56.

Cadent Gas logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Carrgate Lane

Cadent Gas are proposing to carry out Utility asset works on Carrgate Lane, Elston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 15:28.

BT logo
Between
11 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Main Road

BT were proposing to carry out Utility asset works on Main Road, Hockerton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 8 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 18 Sep 2024 at 11:59.

BT logo
Between
11 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Main Street

BT were proposing to carry out Utility asset works on Main Street, North Of Southwell, Upton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 8 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 18 Sep 2024 at 11:51.

Network Rail logo
Between
16 and 17 Dec 2024
Details
View Map
Share
Follow
Access To Mill Farm

Network Rail are proposing to carry out Works for Rail Purposes on Access To Mill Farm, Station Road, Rolleston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Aug 2024 at 16:20.


Roadworks Map near to Guildhall Street, NEWARK, NG24 1UH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Sep 2024 03:06
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Guildhall Street, NEWARK, NG24 1UH (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
APPLETON GATE, NOTTINGHAMSHIRE 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 20 Sep 2024 08:30
(Scheduled: 19 Sep 2024 - 24 Sep 2024)
0.4
Details
Share
Follow
2
Severn Trent Water logo
MATHER ROAD 
(0.5 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Give and take
Complete
20 Sep 2024 14:21 - 16:00
0.5
Details
Share
3
Nottinghamshire County Council logo
MAJOR
  
BOUNDARY ROAD 
(0.6 miles)
Nottinghamshire County Council
Works for road purposes - Footway, Carriageway, Footpath - Road closure
In Progress
Since: 9 Sep 2024 09:00
(Scheduled: 9 Sep 2024 - 27 Sep 2024)
0.6
Details
Share
Follow
4
Nottinghamshire County Council logo
MAJOR
  
VICTORIA STREET 
(0.6 miles)
Nottinghamshire County Council
Works for road purposes - Footway, Carriageway, Footpath - Multi-way signals
In Progress
Since: 9 Sep 2024 09:00
(Scheduled: 9 Sep 2024 - 27 Sep 2024)
0.6
Details
Share
Follow
5
Nottinghamshire County Council logo
EMERGENCY
  
BEECH AVENUE 
(0.6 miles)
Nottinghamshire County Council
Works for road purposes - Verge - No carriageway incursion
Complete
12 Sep 2024 17:50 - 17 Sep 2024 16:11
0.6
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.