ROADWORKS SUMMARY
The Drive, MANSFIELD, NG21 9EE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Drive, NG21 9EE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Drive, MANSFIELD, NG21 9EE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Radmanthwaite Road

Severn Trent Water are carrying out Utility asset works on Radmanthwaite Road, Pleasley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:01 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Mar 2025 at 08:14.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Kingsway

Severn Trent Water are proposing to carry out Utility asset works on Kingsway, Mansfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 21:43.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Kingsway

Severn Trent Water are carrying out Utility asset works on Kingsway, Mansfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 10:30 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 12:20.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Saffron Street

Severn Trent Water were proposing to carry out Utility asset works on Saffron Street, Mansfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 20 Dec 2024 at 12:13.

Severn Trent Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ossington Close

Severn Trent Water are proposing to carry out Utility asset works on Ossington Close, Meden Vale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 21:46.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Dundee Drive

Severn Trent Water are proposing to carry out Utility asset works on Dundee Drive, Mansfield Woodhouse.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 1 Nov 2024 at 13:45.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Clipstone Road West

Cadent Gas are proposing to carry out Utility asset works on Clipstone Road West, Mansfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 13 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 12:57.

Derbyshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Derbyshire County Council are carrying out Highway improvement works on Station Road, Shirebrook.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:30 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 7 Mar 2025 at 14:35.

Derbyshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Derbyshire County Council are proposing to carry out Highway improvement works on Station Road, Shirebrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 21 Jan 2025 at 15:46.

Derbyshire County Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Portland Drive

Derbyshire County Council are proposing to carry out Section 50 on Portland Drive, Shirebrook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 21 Nov 2024 at 10:18.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mansfield Road

Nottinghamshire County Council are carrying out Works for road purposes on Mansfield Road, Clipstone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 March 2025 at 21:00 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Mar 2025 at 22:53.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mansfield Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Mansfield Road, Clipstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Dec 2024 at 09:17.

Nottinghamshire County Council logo
Between
10 and 25 Mar 2025
Details
View Map
Share
Follow
Elkesley Road

Nottinghamshire County Council are proposing to carry out Section 50 on Elkesley Road, Meden Vale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 25 Feb 2025 at 14:51.

Nottinghamshire County Council logo
Between
10 and 25 Mar 2025
Details
View Map
Share
Follow
Elkesley Road

Nottinghamshire County Council are proposing to carry out Section 50 on Elkesley Road, Meden Vale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 24 Feb 2025 at 13:09.

BT logo
Between
12 and 28 Mar 2025
Details
View Map
Share
Follow
Old Rufford Road

BT are proposing to carry out Utility asset works on Old Rufford Road, Farnsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Dec 2024 at 10:54.

Severn Trent Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Maltby Road

Severn Trent Water are proposing to carry out Remedial works on Maltby Road, Mansfield, Mansfield Town.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Jan 2025 at 13:57.

Cadent Gas logo
Between
17 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Burma Road

Cadent Gas are proposing to carry out Utility asset works on Burma Road, Blidworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 12:33.

Cadent Gas logo
Between
17 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Blidworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 12:33.

Cadent Gas logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Warsop Lane

Cadent Gas are proposing to carry out Utility asset works on Warsop Lane, Rainworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 12:33.

Nottinghamshire County Council logo
Between
25 and 30 Mar 2025
Details
View Map
Share
Follow
Clipstone Road East

Nottinghamshire County Council are proposing to carry out Works for road purposes on Clipstone Road East, Mansfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 5 Feb 2025 at 14:20.

Nottinghamshire County Council logo
Between
25 and 30 Mar 2025
Details
View Map
Share
Follow
Clipstone Road East

Nottinghamshire County Council are proposing to carry out Works for road purposes on Clipstone Road East, Mansfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 5 Feb 2025 at 14:25.

Nottinghamshire County Council logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Walesby Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Walesby Lane, Ollerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Jan 2025 at 15:04.

Nottinghamshire County Council logo
Between
6 and 10 May 2025
Details
View Map
Share
Follow
Old Rufford Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Old Rufford Road, Farnsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Feb 2025 at 12:49.

Nottinghamshire County Council logo
Between
6 and 10 May 2025
Details
View Map
Share
Follow
Clipstone Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Clipstone Road, Kings Clipstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 4 Feb 2025 at 15:48.

Severn Trent Water logo
Between
12 and 20 May 2025
Details
View Map
Share
Follow
Robin Hood Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Robin Hood Avenue, Edwinstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 15:58.

Severn Trent Water logo
Between
12 and 20 May 2025
Details
View Map
Share
Follow
Robin Hood Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Robin Hood Avenue, Edwinstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Jan 2025 at 15:37.

Severn Trent Water logo
On
12 May 2025
Details
View Map
Share
Poplar Grove

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Poplar Grove, Mansfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 12 May 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 14:17.

Nottinghamshire County Council logo
Between
20 and 23 May 2025
Details
View Map
Share
Follow
Ricket Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Ricket Lane, Blidworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 12 Feb 2025 at 14:27.

Cadent Gas logo
Between
26 May and 24 Jun 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Blidworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 08:35.

Cadent Gas logo
Between
26 May and 23 Jun 2025
Details
View Map
Share
Follow
Burma Road

Cadent Gas are proposing to carry out Utility asset works on Burma Road, Blidworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 08:35.

Nottinghamshire County Council logo
Between
29 May and 3 Jun 2025
Details
View Map
Share
Follow
Darricott Close

Nottinghamshire County Council are proposing to carry out Works for road purposes on Darricott Close, Rainworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 28 Feb 2025 at 09:37.


Roadworks Map near to The Drive, MANSFIELD, NG21 9EE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Mar 2025 03:52
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Drive, MANSFIELD, NG21 9EE (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nottinghamshire County Council logo
SOUTH CRESCENT 
(0.0 miles)
Nottinghamshire County Council
Works for road purposes - Footway - Some carriageway incursion
In Progress
Since: 28 Feb 2025 09:30
(Scheduled: 28 Feb 2025 - 13 Mar 2025)
0.0
Details
Share
Follow
2
Nottinghamshire County Council logo
URGENT
  
CHURCH ROAD 
(0.2 miles)
Nottinghamshire County Council
Works for road purposes - Footway - No carriageway incursion
In Progress
Since: 6 Mar 2025 13:45
(Scheduled: 6 Mar 2025 - 28 Mar 2025)
0.2
Details
Share
Follow
3
Western Power Distribution (East Midlands) logo
VICARS COURT 
(0.4 miles)
Western Power Distribution (East Midlands)
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 11 Mar 2025 - 13 Mar 2025
0.4
Details
Share
Follow
4
Nottinghamshire County Council logo
MAJOR
  
MANSFIELD ROAD 
(1.0 miles)
Nottinghamshire County Council
Works for road purposes - Carriageway - Road closure
Planned
Scheduled: 9 Mar 2025 - 14 Mar 2025
1.0
Details
Share
Follow
5
Nottinghamshire County Council logo
MAJOR
  
MANSFIELD ROAD 
(1.0 miles)
Nottinghamshire County Council
Works for road purposes - Carriageway - Road closure
In Progress
Since: 9 Mar 2025 21:00
(Scheduled: 9 Mar 2025 - 14 Mar 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.