ROADWORKS SUMMARY
Festus Street, NOTTINGHAM, NG17 7DP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Festus Street, NG17 7DP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Festus Street, NOTTINGHAM, NG17 7DP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Festus Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Nottinghamshire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Watnall Road

Nottinghamshire County Council are carrying out Works for road purposes on Watnall Road, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 25 Oct 2024 at 16:20.

Nottinghamshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Moor Road

Nottinghamshire County Council are carrying out Highway repair and maintenance works on Moor Road, Brinsley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Nov 2024 at 08:19.

Cadent Gas logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
Chapel Lane

Cadent Gas are carrying out Utility asset works on Chapel Lane, Ravenshead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 11:11 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 12:12.

Derbyshire County Council logo
LONG TERM
Between
21 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Birchwood Lane

Derbyshire County Council are proposing to carry out Section 50 on Birchwood Lane, Somercotes, Alfreton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 30 Sep 2024 at 14:11.

Severn Trent Water logo
LONG TERM
Between
22 Oct 2024 and 23 Oct 2025
Details
View Map
Share
Forest Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Forest Road, Sutton In Ashfield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 23 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 09:03.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Sandringham Place

Nottinghamshire County Council are carrying out Highway improvement works on Sandringham Place, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:10.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Windsor Close

Nottinghamshire County Council are carrying out Highway improvement works on Windsor Close, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:11.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Buckingham Avenue

Nottinghamshire County Council are carrying out Highway improvement works on Buckingham Avenue, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:10.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Balmoral Grove

Nottinghamshire County Council are carrying out Highway improvement works on Balmoral Grove, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:11.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
William Street

Nottinghamshire County Council are carrying out Highway improvement works on William Street, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:05.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Windmill Avenue

Nottinghamshire County Council are carrying out Highway improvement works on Windmill Avenue, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:05.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Windmill Grove

Nottinghamshire County Council are carrying out Highway improvement works on Windmill Grove, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:06.

Cadent Gas logo
LONG TERM
Between
30 Oct and 11 Dec 2024
Details
View Map
Share
Follow
Farleys Lane

Cadent Gas are proposing to carry out Utility asset works on Farleys Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 15:31.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Castleton Close

Nottinghamshire County Council are carrying out Highway improvement works on Castleton Close, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:02.

Nottinghamshire County Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Hartington Avenue

Nottinghamshire County Council are carrying out Highway improvement works on Hartington Avenue, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:01.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Cator Road

Severn Trent Water are proposing to carry out Utility asset works on Cator Road, Pleasley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Oct 2024 at 16:52.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Crompton Road

Severn Trent Water are proposing to carry out Utility asset works on Crompton Road, Pleasley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Oct 2024 at 16:48.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Crompton Road

Severn Trent Water are proposing to carry out Utility asset works on Crompton Road, Pleasley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 15:15.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Crompton Road

Severn Trent Water were proposing to carry out Utility asset works on Crompton Road, Pleasley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 11:52.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Radmanthwaite Road

Severn Trent Water are proposing to carry out Utility asset works on Radmanthwaite Road, Pleasley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 14:38.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Radmanthwaite Road

Severn Trent Water were proposing to carry out Utility asset works on Radmanthwaite Road, Pleasley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 11:02.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Radmanthwaite Road

Severn Trent Water are proposing to carry out Utility asset works on Radmanthwaite Road, Pleasley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 23 Oct 2024 at 16:46.

Nottinghamshire County Council logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are carrying out Works for road purposes on Wighay Road, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:30 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 4 Nov 2024 at 07:38.

Nottinghamshire County Council logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 23 Sep 2024 at 15:16.

Nottinghamshire County Council logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Wighay Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 18 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 23 Sep 2024 at 14:41.

Nottinghamshire County Council logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Wighay Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 18 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 20 Sep 2024 at 12:28.

Nottinghamshire County Council logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 20 Sep 2024 at 10:53.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Cator Road

Severn Trent Water are proposing to carry out Utility asset works on Cator Road, Pleasley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Oct 2024 at 15:24.

Severn Trent Water logo
LONG TERM
Between
4 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Cator Road

Severn Trent Water were proposing to carry out Utility asset works on Cator Road, Pleasley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 11:16.

Nottinghamshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Leeming Lane South

Nottinghamshire County Council are carrying out Works for road purposes on Leeming Lane South, Mansfield Woodhouse.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 20:00 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 15:50.

Nottinghamshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Butt Lane

Nottinghamshire County Council are carrying out Works for road purposes on Butt Lane, Mansfield Woodhouse.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 20:00 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 15:50.

Severn Trent Water logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Radmanthwaite Road

Severn Trent Water are carrying out Utility asset works on Radmanthwaite Road, Pleasley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:01 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 10:39.

Cadent Gas logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Farleys Lane

Cadent Gas are carrying out Utility asset works on Farleys Lane, Hucknall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:33 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:39.

Severn Trent Water logo
LONG TERM
Until
20 Jan 2025
Details
View Map
Share
Follow
Crompton Road

Severn Trent Water are carrying out Utility asset works on Crompton Road, Pleasley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:01 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 10:46.

Severn Trent Water logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Cator Road

Severn Trent Water are carrying out Utility asset works on Cator Road, Pleasley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:01 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 10:47.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 14 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Cadent Gas are proposing to carry out Utility asset works on Chapel Lane, Ravenshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 10:23.

Severn Trent Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Kirkby Road

Severn Trent Water are carrying out Utility repair and maintenance works on Kirkby Road, Sutton In Ashfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:14 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 12:23.

Nottinghamshire County Council logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Skerry Hill

Nottinghamshire County Council are proposing to carry out Highway improvement works on Skerry Hill, Mansfield, Mansfield Town.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 30 Oct 2024 at 08:36.

Nottinghamshire County Council logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Skerry Hill

Nottinghamshire County Council are proposing to carry out Highway improvement works on Skerry Hill, Mansfield, Mansfield Town.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 4 Jun 2024 at 09:27.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
West Hill

Nottinghamshire County Council are carrying out Highway repair and maintenance works on West Hill, Skegby, Sutton In Ashfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 10:19.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mansfield Road

Nottinghamshire County Council are carrying out Highway repair and maintenance works on Mansfield Road, Skegby, Sutton In Ashfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 20:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:34.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Crescent Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Crescent Road, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Jun 2024 at 13:24.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Newboundmill Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Newboundmill Lane, Pleasley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Sep 2024 at 10:42.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Newboundmill Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Newboundmill Lane, Pleasley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2024 at 11:51.

Energy Assets Pipelines logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
High View Road

Energy Assets Pipelines are proposing to carry out Utility asset works on High View Road, South Normanton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 10 Sep 2024 at 15:21.

Nottinghamshire County Council logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Green Farm Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Green Farm Road, Selston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 15:55.

Nottinghamshire County Council logo
Between
4 and 9 Dec 2024
Details
View Map
Share
Follow
Ricket Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Ricket Lane, Blidworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 5 Aug 2024 at 11:45.

Nottinghamshire County Council logo
Between
4 and 9 Dec 2024
Details
View Map
Share
Ricket Lane

Nottinghamshire County Council were proposing to carry out Works for road purposes on Ricket Lane, Blidworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 9 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 16:09.

Severn Trent Water logo
LONG TERM
Between
9 Dec 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Crow Hill Lane

Severn Trent Water are proposing to carry out Utility asset works on Crow Hill Lane, Mansfield Woodhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 15:30.

ESP Electricity logo
LONG TERM
Between
9 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

ESP Electricity are proposing to carry out Utility asset works on Alfreton Road, Sutton In Ashfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 16 Sep 2024 at 15:25.

Nottinghamshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Little Ricket Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Little Ricket Lane, Ravenshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 23 Aug 2024 at 13:34.

Severn Trent Water logo
LONG TERM
Between
16 Dec 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Crow Hill Lane

Severn Trent Water are proposing to carry out Utility asset works on Crow Hill Lane, Mansfield Woodhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 17:19.

Netomnia logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Chesterfield Road North

Netomnia were proposing to carry out Utility repair and maintenance works on Chesterfield Road North, Pleasleyhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Netomnia on 12 Sep 2024 at 10:23.

Nottinghamshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Little Ricket Lane

Nottinghamshire County Council were proposing to carry out Works for road purposes on Little Ricket Lane, Ravenshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 16 Aug 2024 at 10:41.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Gladstone Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Gladstone Street, Kirkby In Ashfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 12:55.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Bright Street

Severn Trent Water are proposing to carry out New service connection on Bright Street, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 10:09.

Nottinghamshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Little Ricket Lane

Nottinghamshire County Council were proposing to carry out Works for road purposes on Little Ricket Lane, Ravenshead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Nov 2024 at 14:41.

Nottinghamshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Little Ricket Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Little Ricket Lane, Ravenshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 1 Oct 2024 at 16:20.

Nottinghamshire County Council logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Langton Hollow

Nottinghamshire County Council were proposing to carry out Works for road purposes on Langton Hollow, Selston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Nov 2024 at 11:28.

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:46.

Severn Trent Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
The Hamlet

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Hamlet, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 16:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Oak Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Lane, Mansfield, Mansfield Town.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 12:58.

Cadent Gas logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Oak Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Lane, Mansfield, Mansfield Town.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 08:57.

Cadent Gas logo
Between
10 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 20:40.

Network Rail logo
Between
18 and 20 Jan 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 14:55.

Network Rail logo
Between
18 and 20 Jan 2025
Details
View Map
Share
Park Lane

Network Rail were proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 15:20.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Birchwood Lane

Severn Trent Water are proposing to carry out Utility asset works on Birchwood Lane, Somercotes, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 17:26.

Cadent Gas logo
Between
20 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Church Drive

Cadent Gas are proposing to carry out Utility asset works on Church Drive, Ravenshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 10:27.

Cadent Gas logo
LONG TERM
Between
24 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Ravenshead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:02.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Sep 2024 at 12:43.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Aug 2024 at 16:32.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:56.

Nottinghamshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mansfield Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Mansfield Road, Underwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2024 at 12:43.

Derbyshire County Council logo
LONG TERM
Between
28 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Birchwood Lane

Derbyshire County Council are proposing to carry out Section 50 on Birchwood Lane, Somercotes, Alfreton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 18 Oct 2024 at 11:31.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Bright Street

Severn Trent Water are proposing to carry out New service connection on Bright Street, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 12:10.

Cadent Gas logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Linby Road

Cadent Gas are proposing to carry out Utility asset works on Linby Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:56.

Cadent Gas logo
Between
3 and 19 Feb 2025
Details
View Map
Share
Follow
Longdale Lane

Cadent Gas are proposing to carry out Utility asset works on Longdale Lane, Ravenshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 10:31.

Cadent Gas logo
Between
6 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Ravenshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:30.

Cadent Gas logo
LONG TERM
Between
6 Feb and 19 May 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Ravenshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 15:30.

Nottinghamshire County Council logo
Between
7 and 17 Feb 2025
Details
View Map
Share
Follow
Cherry Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Cherry Avenue, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 24 Oct 2024 at 13:59.

Nottinghamshire County Council logo
Between
7 and 17 Feb 2025
Details
View Map
Share
Follow
Cherry Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Cherry Avenue, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Oct 2024 at 21:11.

Network Rail logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Nov 2024 at 11:18.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Central Avenue

Severn Trent Water are proposing to carry out Utility asset works on Central Avenue, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 09:15.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Station Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Station Road, Sutton In Ashfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 15:54.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Central Avenue

Severn Trent Water were proposing to carry out Utility asset works on Central Avenue, Kirkby In Ashfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 09:14.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
The Hamlet

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Hamlet, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 10:57.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Ravenshead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 10:25.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Woodside

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodside, Sutton In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 12:46.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Woodside

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodside, Sutton In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 15:07.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Eakring Road

Cadent Gas are proposing to carry out Utility asset works on Eakring Road, Mansfield, Mansfield Town.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 09:00.


Roadworks Map near to Festus Street, NOTTINGHAM, NG17 7DP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 13:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Festus Street, NOTTINGHAM, NG17 7DP (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nottinghamshire County Council logo
EMERGENCY
  
KINGSWAY 
(0.3 miles)
Nottinghamshire County Council
Works for road purposes - Footway - No carriageway incursion
In Progress
Since: 14 Oct 2024 15:00
(Scheduled: 14 Oct 2024 - 29 Nov 2024)
0.3
Details
Share
Follow
2
Nottinghamshire County Council logo
OCCUPATION LANE 
(0.6 miles)
Nottinghamshire County Council
Works for road purposes - Footway - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 23 Nov 2024
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.