ROADWORKS SUMMARY
Nottingham Road, NOTTINGHAM, NG16 6BU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Nottingham Road, NG16 6BU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Nottingham Road, NOTTINGHAM, NG16 6BU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Nottingham Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Between
21 Oct and 28 Dec 2024
Details
View Map
Share
Follow
Cromford Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cromford Road, Langley Mill, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 20 Sep 2024 at 10:58.

Nottinghamshire County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 20 Sep 2024 at 10:53.

Nottinghamshire County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Wighay Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 18 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 20 Sep 2024 at 12:28.

Nottinghamshire County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Wighay Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 18 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 23 Sep 2024 at 14:41.

Nottinghamshire County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wighay Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 23 Sep 2024 at 15:16.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Farleys Lane

Cadent Gas are carrying out Utility asset works on Farleys Lane, Hucknall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:33 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 12:36.

Severn Trent Water logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Cromford Road

Severn Trent Water are carrying out Utility repair and maintenance works on Cromford Road, Langley Mill, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 16:30.

Severn Trent Water logo
LONG TERM
Between
15 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Argyle Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Argyle Street, Langley Mill, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 09:36.

Severn Trent Water logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Argyle Street

Severn Trent Water are carrying out Utility repair and maintenance works on Argyle Street, Langley Mill, Heanor.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 18:00 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 15:02.

Murphy Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Birchwood Lane

Murphy Gas Networks are carrying out Utility asset works on Birchwood Lane, Somercotes, Alfreton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 07:54 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 11 Dec 2024 at 15:42.

Energy Assets Pipelines logo
Finishing
Friday
Details
View Map
Share
Follow
High View Road

Energy Assets Pipelines are proposing to carry out Utility asset works on High View Road, South Normanton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 10 Sep 2024 at 15:21.

Nottinghamshire County Council logo
LONG TERM
Between
2 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Annesley Road

Nottinghamshire County Council are proposing to carry out Section 50 on Annesley Road, Linby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 2 Dec 2024 at 16:27.

Nottinghamshire County Council logo
LONG TERM
Between
2 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Annesley Road

Nottinghamshire County Council are proposing to carry out Section 50 on Annesley Road, Linby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 2 Dec 2024 at 16:30.

ESP Electricity logo
Finishing
Friday
Details
View Map
Share
Alfreton Road

ESP Electricity were proposing to carry out Utility asset works on Alfreton Road, Sutton In Ashfield.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 10 Dec 2024 at 08:59.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
8 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, Tibshelf.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Dec 2024 at 11:51.

ESP Electricity logo
LONG TERM
Between
9 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

ESP Electricity are proposing to carry out Utility asset works on Alfreton Road, Sutton In Ashfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 16 Sep 2024 at 15:25.

Nottinghamshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Trent Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Trent Drive, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 5 Aug 2024 at 17:02.

Nottinghamshire County Council logo
Finishing
Today
Details
View Map
Share
Trent Drive

Nottinghamshire County Council were proposing to carry out Works for road purposes on Trent Drive, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 15:16.

Western Power Distribution (East Midlands) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
South Street

Western Power Distribution (East Midlands) are carrying out Utility repair and maintenance works on South Street, Riddings, Alfreton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 13:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Dec 2024 at 09:06.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Preston Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Preston Avenue, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Sep 2024 at 11:01.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Preston Avenue

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Preston Avenue, Alfreton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 10:23.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
Follow
Bright Street

Severn Trent Water are carrying out New service connection on Bright Street, South Normanton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 09:23 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 16 Dec 2024 at 09:23.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
Gladstone Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Gladstone Street, Kirkby In Ashfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 12:55.

Nottinghamshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Langton Hollow

Nottinghamshire County Council were proposing to carry out Works for road purposes on Langton Hollow, Selston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Nov 2024 at 11:28.

Severn Trent Water logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Main Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Road, Ripley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Sep 2024 at 11:54.

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:46.

Western Power Distribution (East Midlands) logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Newton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Newton Road, Tibshelf.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Dec 2024 at 11:53.

Western Power Distribution (East Midlands) logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
Newton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Newton Road, Tibshelf.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Dec 2024 at 11:42.

Western Power Distribution (East Midlands) logo
Between
3 and 20 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, Tibshelf.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Dec 2024 at 11:52.

Western Power Distribution (East Midlands) logo
Between
3 and 20 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, Tibshelf.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Dec 2024 at 13:41.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Newthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 15:07.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Newthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 15:54.

Severn Trent Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
The Hamlet

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Hamlet, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 16:00.

ESP Electricity logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

ESP Electricity are proposing to carry out Utility asset works on Alfreton Road, Sutton In Ashfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 16 Dec 2024 at 15:44.

ESP Electricity logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

ESP Electricity are proposing to carry out Utility asset works on Alfreton Road, Sutton In Ashfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 16 Dec 2024 at 16:08.

Western Power Distribution (East Midlands) logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, Tibshelf.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Dec 2024 at 13:42.

Western Power Distribution (East Midlands) logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, Tibshelf.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Dec 2024 at 11:52.

Western Power Distribution (East Midlands) logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, Tibshelf.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Dec 2024 at 13:38.

Western Power Distribution (East Midlands) logo
Between
9 and 27 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, Tibshelf.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Dec 2024 at 11:51.

Western Power Distribution (East Midlands) logo
Between
9 and 27 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, Tibshelf.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Dec 2024 at 13:43.

Cadent Gas logo
Between
10 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 20:40.

Derbyshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Main Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Main Road, Pentrich, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 3 Dec 2024 at 11:01.

Severn Trent Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Central Avenue

Severn Trent Water are proposing to carry out Utility asset works on Central Avenue, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 16:10.

Between
15 and 31 Jan 2025
Details
View Map
Share
Follow
Tibshelf Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Tibshelf Road, Westhouses.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 13 Dec 2024 at 15:11.

Between
15 and 31 Jan 2025
Details
View Map
Share
Follow
Tibshelf Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Tibshelf Road, Westhouses.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 17 Dec 2024 at 12:45.

Western Power Distribution (East Midlands) logo
Between
16 and 30 Jan 2025
Details
View Map
Share
Follow
Alfreton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Alfreton Road, Westhouses.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Dec 2024 at 11:48.

Network Rail logo
Between
18 and 20 Jan 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 14:55.

Network Rail logo
Between
18 and 20 Jan 2025
Details
View Map
Share
Park Lane

Network Rail were proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 15:20.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lynncroft

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 15:23.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lynncroft

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 09:56.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Birchwood Lane

Severn Trent Water are proposing to carry out Utility asset works on Birchwood Lane, Somercotes, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 17:26.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Aug 2024 at 16:32.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Sep 2024 at 12:43.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Dec 2024 at 14:30.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:56.

Nottinghamshire County Council logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Main Street

Nottinghamshire County Council are proposing to carry out Highway improvement works on Main Street, Linby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Nottinghamshire County Council on 29 Nov 2024 at 10:05.

Severn Trent Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Lowes Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lowes Hill, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 12:11.

Severn Trent Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Lowes Hill

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Lowes Hill, Ripley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 16:16.

Nottinghamshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mansfield Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Mansfield Road, Underwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2024 at 12:43.

Derbyshire County Council logo
LONG TERM
Between
28 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Birchwood Lane

Derbyshire County Council are proposing to carry out Section 50 on Birchwood Lane, Somercotes, Alfreton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 18 Oct 2024 at 11:31.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Bright Street

Severn Trent Water are proposing to carry out New service connection on Bright Street, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 12:10.

Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Tibshelf Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Tibshelf Road, Westhouses.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 13 Dec 2024 at 15:09.

Between
30 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Tibshelf Road

Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Tibshelf Road, Westhouses.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (Telecoms) on 17 Dec 2024 at 12:50.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Peel Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Peel Street, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 15:27.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Peel Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Peel Street, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 14:34.

Cadent Gas logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Linby Road

Cadent Gas are proposing to carry out Utility asset works on Linby Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:56.

Severn Trent Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Midland Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Midland Road, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:55.

Severn Trent Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Midland Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Midland Road, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 15:28.

Nottinghamshire County Council logo
Between
7 and 17 Feb 2025
Details
View Map
Share
Follow
Cherry Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Cherry Avenue, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 13 Dec 2024 at 11:48.

Nottinghamshire County Council logo
Between
7 and 17 Feb 2025
Details
View Map
Share
Follow
Cherry Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Cherry Avenue, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 17 Dec 2024 at 10:36.

Nottinghamshire County Council logo
Between
7 and 17 Feb 2025
Details
View Map
Share
Follow
Cherry Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Cherry Avenue, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Oct 2024 at 21:11.

Nottinghamshire County Council logo
Between
7 and 17 Feb 2025
Details
View Map
Share
Cherry Avenue

Nottinghamshire County Council were proposing to carry out Works for road purposes on Cherry Avenue, Kirkby In Ashfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 26 Nov 2024 at 13:26.

Network Rail logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Nov 2024 at 11:18.

Network Rail logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Nov 2024 at 12:22.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Park Street

Severn Trent Water are proposing to carry out New service connection on Park Street, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 13:25.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
A611 Hucknall By-pass

Nottinghamshire County Council are proposing to carry out Works for road purposes on A611 Hucknall By-pass, Hucknall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 9 Dec 2024 at 09:47.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
A611 Hucknall By-pass

Nottinghamshire County Council were proposing to carry out Works for road purposes on A611 Hucknall By-pass, Hucknall.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 10 Dec 2024 at 14:04.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
A611 Hucknall By-pass

Nottinghamshire County Council are proposing to carry out Works for road purposes on A611 Hucknall By-pass, Hucknall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 16 Dec 2024 at 13:03.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Annesley Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Annesley Road, Linby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 16 Dec 2024 at 13:02.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Annesley Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Annesley Road, Annesley Woodhouse.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 10 Dec 2024 at 14:02.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Annesley Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Annesley Road, Annesley Woodhouse.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 9 Dec 2024 at 09:30.

Severn Trent Water logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Eachwell Lane

Severn Trent Water were proposing to carry out Utility asset works on Eachwell Lane, Alfreton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 14:38.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Central Avenue

Severn Trent Water were proposing to carry out Utility asset works on Central Avenue, Kirkby In Ashfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 09:14.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Central Avenue

Severn Trent Water are proposing to carry out Utility asset works on Central Avenue, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 15:05.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
The Hamlet

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Hamlet, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 10:57.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Station Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Station Road, Sutton In Ashfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 15:54.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Lowes Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lowes Hill, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 17:14.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Lowes Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lowes Hill, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 15:50.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Main Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Road, Ripley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 10:43.

Nottinghamshire County Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Kingsway

Nottinghamshire County Council are proposing to carry out Works for road purposes on Kingsway, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 16 Dec 2024 at 12:14.

Nottinghamshire County Council logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Hardwick Lane

Nottinghamshire County Council are proposing to carry out Section 50 on Hardwick Lane, Sutton In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 11 Dec 2024 at 09:54.

Nottinghamshire County Council logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Hardwick Lane

Nottinghamshire County Council are proposing to carry out Section 50 on Hardwick Lane, Sutton In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 11 Dec 2024 at 12:06.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Philip Avenue

Severn Trent Water are proposing to carry out New service connection on Philip Avenue, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 14:35.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Philip Avenue

Severn Trent Water are proposing to carry out New service connection on Philip Avenue, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 08:46.

Network Rail logo
Between
22 and 24 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 May 2024 at 13:20.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Pinfold Road

BT are proposing to carry out Utility repair and maintenance works on Pinfold Road, Newthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Dec 2024 at 07:53.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Street, Newthorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 13:46.

LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Church Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Church Street, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Nov 2024 at 12:14.

LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Kelham Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Kelham Way, Eastwood.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Nov 2024 at 12:14.

Cadent Gas logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Blatherwick Close

Cadent Gas are proposing to carry out Utility asset works on Blatherwick Close, Hucknall.

These works are categorised as Major.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 15:31.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Birchwood Lane

Severn Trent Water are proposing to carry out Utility asset works on Birchwood Lane, Somercotes, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:46.

Severn Trent Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Main Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Road, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 14:43.

Severn Trent Water logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Eachwell Lane

Severn Trent Water were proposing to carry out Utility asset works on Eachwell Lane, Alfreton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 February 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 15:01.

Network Rail logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2024 at 13:38.

ESP Electricity logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Carter Lane East

ESP Electricity are proposing to carry out Utility asset works on Carter Lane East, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ESP Electricity on 5 Dec 2024 at 15:45.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Sep 2024 at 14:45.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 16:39.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Pinxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Sep 2024 at 11:25.

BT logo
Between
17 and 25 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

BT are proposing to carry out Utility repair and maintenance works on Mansfield Road, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 9 Dec 2024 at 14:58.

ESP Electricity logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

ESP Electricity are proposing to carry out Utility asset works on Mansfield Road, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ESP Electricity on 9 Dec 2024 at 09:33.

BT logo
Between
17 and 25 Mar 2025
Details
View Map
Share
Follow
Berristow Lane

BT are proposing to carry out Utility repair and maintenance works on Berristow Lane, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Dec 2024 at 14:54.


Roadworks Map near to Nottingham Road, NOTTINGHAM, NG16 6BU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Nottingham Road, NOTTINGHAM, NG16 6BU (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nottinghamshire County Council logo
MAJOR
  
LANGTON HOLLOW 
(0.5 miles)
Nottinghamshire County Council
Works for road purposes - Carriageway - Road closure
Cancelled
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.5
Details
Share
2
Severn Trent Water logo
LOWER BAGTHORPE 
(0.8 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 18 Dec 2024
0.8
Details
Share
Follow
3
Nottinghamshire County Council logo
CHURCH LANE 
(0.9 miles)
Nottinghamshire County Council
Section 50 - Footway, Verge - Two-way signals
Planned
Scheduled: 9 Dec 2024 - 20 Dec 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.