ROADWORKS SUMMARY
Perry Gardens, NOTTINGHAM, NG16 5BF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Perry Gardens, NG16 5BF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Perry Gardens, NOTTINGHAM, NG16 5BF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Perry Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
Derby Road

Severn Trent Water are carrying out Utility asset works on Derby Road, Denby, Ripley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 09:30 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 13 Jan 2025 at 14:35.

Severn Trent Water logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Cromford Road

Severn Trent Water are carrying out Utility repair and maintenance works on Cromford Road, Langley Mill, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Jan 2025 at 09:27.

Nottinghamshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Annesley Road

Nottinghamshire County Council are proposing to carry out Section 50 on Annesley Road, Linby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 2 Dec 2024 at 16:27.

Nottinghamshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Annesley Road

Nottinghamshire County Council are proposing to carry out Section 50 on Annesley Road, Linby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 2 Dec 2024 at 16:30.

Derbyshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Windmill Rise

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Rise, Somercotes, Alfreton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 23 Jan 2025 at 16:53.

Cadent Gas logo
LONG TERM
Until
26 Feb 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are carrying out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 09:00 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Jan 2025 at 15:51.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:56.

Nottinghamshire County Council logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Main Street

Nottinghamshire County Council are proposing to carry out Highway improvement works on Main Street, Linby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Nottinghamshire County Council on 29 Nov 2024 at 10:05.

Nottinghamshire County Council logo
LONG TERM
Between
27 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Main Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Main Street, Linby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 20 Dec 2024 at 13:08.

Nottinghamshire County Council logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Main Street

Nottinghamshire County Council are carrying out Works for road purposes on Main Street, Linby.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 11:00 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 27 Jan 2025 at 12:56.

Derbyshire County Council logo
LONG TERM
Between
28 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Birchwood Lane

Derbyshire County Council are proposing to carry out Section 50 on Birchwood Lane, Somercotes, Alfreton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 18 Oct 2024 at 11:31.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Kimberley Road

Cadent Gas are proposing to carry out Utility asset works on Kimberley Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:54.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Kimberley Road

Cadent Gas are proposing to carry out Utility asset works on Kimberley Road, Nuthall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:04.

Cadent Gas logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Kimberley Road

Cadent Gas are carrying out Utility asset works on Kimberley Road, Nuthall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 09:31.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:46.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Nuthall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:05.

Cadent Gas logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are carrying out Utility asset works on Nottingham Road, Nuthall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:30 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 09:30.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Watnall Road

Cadent Gas are proposing to carry out Utility asset works on Watnall Road, Nuthall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 07:57.

Cadent Gas logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Watnall Road

Cadent Gas are carrying out Utility asset works on Watnall Road, Nuthall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:30 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 09:31.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Peel Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Peel Street, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 15:27.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Peel Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Peel Street, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 14:34.

Cadent Gas logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Linby Road

Cadent Gas are proposing to carry out Utility asset works on Linby Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:56.

Cadent Gas logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Linby Road

Cadent Gas are proposing to carry out Utility asset works on Linby Road, Hucknall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 08:34.

Derbyshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Nottingham Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Nottingham Road, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 17 Jan 2025 at 10:25.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Midland Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Midland Road, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:55.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Midland Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Midland Road, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 15:28.

Derbyshire County Council logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
Derby Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Derby Road, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 17 Jan 2025 at 09:52.

Derbyshire County Council logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
Oakwell Drive

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Oakwell Drive, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 17 Jan 2025 at 09:50.

Network Rail logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Nov 2024 at 11:18.

Network Rail logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Nov 2024 at 12:22.

Network Rail logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Dec 2024 at 09:55.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 19 May 2025
Details
View Map
Share
Follow
Shilo Way

Nottinghamshire County Council are proposing to carry out Works for road purposes on Shilo Way, Cossall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 16 Jan 2025 at 09:32.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Fairfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Fairfield Road, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 12:03.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Fairfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Fairfield Road, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 11:03.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Park Street

Severn Trent Water are proposing to carry out New service connection on Park Street, Heanor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 13:25.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
A611 Hucknall By-pass

Nottinghamshire County Council are proposing to carry out Works for road purposes on A611 Hucknall By-pass, Hucknall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 9 Dec 2024 at 09:47.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
A611 Hucknall By-pass

Nottinghamshire County Council were proposing to carry out Works for road purposes on A611 Hucknall By-pass, Hucknall.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 10 Dec 2024 at 14:04.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
A611 Hucknall By-pass

Nottinghamshire County Council are proposing to carry out Works for road purposes on A611 Hucknall By-pass, Hucknall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 16 Dec 2024 at 13:03.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
A611 Hucknall By-pass

Nottinghamshire County Council are proposing to carry out Works for road purposes on A611 Hucknall By-pass, Hucknall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 19 Dec 2024 at 09:52.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Annesley Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Annesley Road, Linby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 16 Dec 2024 at 13:02.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Annesley Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Annesley Road, Linby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 23 Dec 2024 at 13:43.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Annesley Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Annesley Road, Annesley Woodhouse.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 10 Dec 2024 at 14:02.

Nottinghamshire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Annesley Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Annesley Road, Annesley Woodhouse.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 9 Dec 2024 at 09:30.

Severn Trent Water logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Eachwell Lane

Severn Trent Water were proposing to carry out Utility asset works on Eachwell Lane, Alfreton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 14:38.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Central Avenue

Severn Trent Water were proposing to carry out Utility asset works on Central Avenue, Kirkby In Ashfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 09:14.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Central Avenue

Severn Trent Water are proposing to carry out Utility asset works on Central Avenue, Kirkby In Ashfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 15:05.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
The Hamlet

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Hamlet, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 10:57.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
The Glebe

Severn Trent Water were proposing to carry out Utility asset works on The Glebe, Cossall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 13:18.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Westby Lane

Severn Trent Water were proposing to carry out Utility asset works on Westby Lane, Awsworth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 13:06.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Awsworth Lane

Severn Trent Water were proposing to carry out Utility asset works on Awsworth Lane, Cossall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 13:06.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Newtons Lane

Severn Trent Water were proposing to carry out Utility asset works on Newtons Lane, Cossall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 13:07.

Nottinghamshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Main Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Main Street, Linby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Dec 2024 at 14:08.

Nottinghamshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Main Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Main Street, Linby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Jan 2025 at 14:52.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Lowes Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lowes Hill, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 17:14.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Lowes Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lowes Hill, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 15:50.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Main Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Road, Ripley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 10:43.

Derbyshire County Council logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Cotmanhay Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Cotmanhay Road, Cotmanhay, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 17 Jan 2025 at 10:31.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Philip Avenue

Severn Trent Water are proposing to carry out New service connection on Philip Avenue, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 14:35.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Philip Avenue

Severn Trent Water are proposing to carry out New service connection on Philip Avenue, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 08:46.

Network Rail logo
Between
22 and 24 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 May 2024 at 13:20.

Network Rail logo
Between
22 and 24 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jan 2025 at 08:58.

Network Rail logo
Between
22 and 24 Feb 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 31 Jan 2025 at 08:14.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Pinfold Road

BT are proposing to carry out Utility repair and maintenance works on Pinfold Road, Newthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Dec 2024 at 07:53.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Street, Newthorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 13:46.

LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Church Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Church Street, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Nov 2024 at 12:14.

LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Kelham Way

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Kelham Way, Eastwood.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Jan 2025 at 10:22.

Cadent Gas logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Blatherwick Close

Cadent Gas are proposing to carry out Utility asset works on Blatherwick Close, Hucknall.

These works are categorised as Major.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 15:31.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Birchwood Lane

Severn Trent Water are proposing to carry out Utility asset works on Birchwood Lane, Somercotes, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:46.

Severn Trent Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Main Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Road, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 14:43.

Severn Trent Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Main Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Road, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Dec 2024 at 15:52.

Severn Trent Water logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Eachwell Lane

Severn Trent Water were proposing to carry out Utility asset works on Eachwell Lane, Alfreton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 February 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 15:01.

Network Rail logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2024 at 13:38.

Network Rail logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Jan 2025 at 13:42.

Severn Trent Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Stamford Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stamford Street, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 14:19.

Severn Trent Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Stamford Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stamford Street, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Nov 2024 at 11:21.

Severn Trent Water logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Westby Lane

Severn Trent Water are proposing to carry out Utility asset works on Westby Lane, Awsworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 07:52.

Severn Trent Water logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Awsworth Lane

Severn Trent Water are proposing to carry out Utility asset works on Awsworth Lane, Cossall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 07:53.

Severn Trent Water logo
LONG TERM
Between
3 Mar and 19 Jun 2025
Details
View Map
Share
Follow
Newtons Lane

Severn Trent Water are proposing to carry out Utility asset works on Newtons Lane, Cossall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 07:53.

Nottinghamshire County Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Gin Close Way

Nottinghamshire County Council were proposing to carry out Works for road purposes on Gin Close Way, Awsworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 16 Jan 2025 at 14:37.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Peasehill

Cadent Gas are proposing to carry out Utility asset works on Peasehill, Ripley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 15:40.

Derbyshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Princess Avenue

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Princess Avenue, South Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 21 Jan 2025 at 15:42.

Cadent Gas logo
Between
7 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Farleys Lane

Cadent Gas are proposing to carry out Utility asset works on Farleys Lane, Hucknall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 14:45.

Derbyshire County Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Nottingham Road, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 29 Jan 2025 at 14:07.

Nottinghamshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Bailey Grove Road

Nottinghamshire County Council are proposing to carry out Section 50 on Bailey Grove Road, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 14 Jan 2025 at 12:00.

Nottinghamshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Bailey Grove Road

Nottinghamshire County Council are proposing to carry out Section 50 on Bailey Grove Road, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nottinghamshire County Council on 15 Jan 2025 at 14:11.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Sep 2024 at 14:45.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 16:39.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Jan 2025 at 11:01.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Pinxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Sep 2024 at 11:25.

Network Rail logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Pinxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Jan 2025 at 11:02.

Derbyshire County Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Nottingham Road, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Jan 2025 at 14:00.

Derbyshire County Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Derby Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Derby Road, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 30 Jan 2025 at 16:30.

Derbyshire County Council logo
Between
14 and 17 Mar 2025
Details
View Map
Share
Follow
Derby Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Derby Road, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Jan 2025 at 14:08.

Nottinghamshire County Council logo
Between
14 and 16 Mar 2025
Details
View Map
Share
Follow
Gin Close Way

Nottinghamshire County Council are proposing to carry out Works for road purposes on Gin Close Way, Awsworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 17 Jan 2025 at 11:35.

Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Derby Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Derby Road, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Jan 2025 at 12:57.

Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Derby Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Derby Road, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Jan 2025 at 15:15.

Nottinghamshire County Council logo
Between
17 and 22 Mar 2025
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wighay Road, Linby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 6 Jan 2025 at 16:57.

Nottinghamshire County Council logo
Between
17 and 22 Mar 2025
Details
View Map
Share
Follow
Wighay Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wighay Road, Linby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 29 Jan 2025 at 10:56.

Severn Trent Water logo
LONG TERM
Between
18 Mar and 8 May 2025
Details
View Map
Share
Follow
The Glebe

Severn Trent Water are proposing to carry out Utility asset works on The Glebe, Cossall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 09:04.

Severn Trent Water logo
Between
18 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Westby Lane

Severn Trent Water are proposing to carry out Utility asset works on Westby Lane, Awsworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 09:05.

Severn Trent Water logo
Between
18 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Awsworth Lane

Severn Trent Water are proposing to carry out Utility asset works on Awsworth Lane, Cossall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 09:07.

Nottinghamshire County Council logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Green Farm Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Green Farm Road, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 23 Dec 2024 at 10:53.

Derbyshire County Council logo
Between
23 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Heanor Road

Derbyshire County Council are proposing to carry out Highway improvement works on Heanor Road, Ilkeston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Derbyshire County Council on 30 Jan 2025 at 14:10.

Severn Trent Water logo
LONG TERM
Between
24 Mar and 10 Jul 2025
Details
View Map
Share
Follow
Newtons Lane

Severn Trent Water are proposing to carry out Utility asset works on Newtons Lane, Cossall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 09:06.

Derbyshire County Council logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Cotmanhay Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Cotmanhay Road, Cotmanhay, Ilkeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Jan 2025 at 14:59.

Nottinghamshire County Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Langton Hollow

Nottinghamshire County Council are proposing to carry out Works for road purposes on Langton Hollow, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 23 Dec 2024 at 10:48.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 21 May 2025
Details
View Map
Share
Follow
The Glebe

Severn Trent Water are proposing to carry out Utility asset works on The Glebe, Cossall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 07:52.

Cadent Gas logo
Between
31 Mar and 16 Apr 2025
Details
View Map
Share
Follow
Snape Wood Road

Cadent Gas are proposing to carry out Utility asset works on Snape Wood Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 11:44.

Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Woodland Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Woodland Way, Eastwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Jan 2025 at 09:19.

Derbyshire County Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Birchwood Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Birchwood Road, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Jan 2025 at 14:50.

Derbyshire County Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Birchwood Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Birchwood Road, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 28 Jan 2025 at 13:56.

Derbyshire County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Abbott Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Abbott Road, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 15 Jan 2025 at 15:25.

Derbyshire County Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Abbott Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Abbott Road, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 28 Jan 2025 at 13:56.

Derbyshire County Council logo
Between
2 and 5 Apr 2025
Details
View Map
Share
Follow
Abbott Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Abbott Road, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 16 Jan 2025 at 09:46.

Severn Trent Water logo
On
7 Apr 2025
Details
View Map
Share
Stone Avenue

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Stone Avenue, Heanor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 7 April 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 15:02.

Cadent Gas logo
Between
21 Apr and 13 May 2025
Details
View Map
Share
Low Wood Road

Cadent Gas were proposing to carry out Utility asset works on Low Wood Road, Nottingham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 13 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 14:08.

BT logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Commonside

BT are proposing to carry out Utility repair and maintenance works on Commonside, Selston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Jan 2025 at 09:23.

Derbyshire County Council logo
Between
22 and 29 Apr 2025
Details
View Map
Share
Abbott Road

Derbyshire County Council were proposing to carry out Highway repair and maintenance works on Abbott Road, Alfreton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 30 Jan 2025 at 10:13.

Severn Trent Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Maws Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Maws Lane, Kimberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 10:11.

Severn Trent Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Maws Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Maws Lane, Kimberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Jan 2025 at 08:11.

Cadent Gas logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Follow
Sellers Wood Drive

Cadent Gas are proposing to carry out Utility asset works on Sellers Wood Drive, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 10:59.

Cadent Gas logo
Between
28 Apr and 19 May 2025
Details
View Map
Share
Follow
Spindle Gardens

Cadent Gas are proposing to carry out Utility asset works on Spindle Gardens, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 08:22.

Cadent Gas logo
Between
28 Apr and 15 May 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Pentrich, Ripley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 15:40.

Cadent Gas logo
Between
28 Apr and 15 May 2025
Details
View Map
Share
Follow
Asher Lane

Cadent Gas are proposing to carry out Utility asset works on Asher Lane, Pentrich, Ripley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 15:39.

Severn Trent Water logo
Between
28 Apr and 19 May 2025
Details
View Map
Share
Follow
Eachwell Lane

Severn Trent Water are proposing to carry out Utility asset works on Eachwell Lane, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2025 at 08:32.

Severn Trent Water logo
Between
29 Apr and 2 May 2025
Details
View Map
Share
Watnall Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Watnall Road, Hucknall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Jan 2025 at 14:03.


Roadworks Map near to Perry Gardens, NOTTINGHAM, NG16 5BF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 3 Feb 2025 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Perry Gardens, NOTTINGHAM, NG16 5BF (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Severn Trent Water logo
MAJOR
  
CROMFORD ROAD, LANGLEY MILL 
(0.9 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 11 Nov 2024 10:00
(Scheduled: 11 Nov 2024 - 30 Apr 2025)
0.9
Details
Share
Follow
2
Severn Trent Water logo
URGENT
  
MANSFIELD ROAD 
(1.0 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 31 Jan 2025 15:02
(Scheduled: 31 Jan 2025 - 4 Feb 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.