ROADWORKS SUMMARY
Harold Avenue, NOTTINGHAM, NG16 4DZ
Introduction
View current and future planned roadworks and road closures for Harold Avenue, NG16 4DZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Harold Avenue, NOTTINGHAM, NG16 4DZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Harold Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
10 Jan 2025
Severn Trent Water are carrying out roadworks on Derby Road, Lower Kilburn, Belper.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2024 at 09:38.
10 Jan 2025
Severn Trent Water are carrying out roadworks on Derby Road, Denby, Ripley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2024 at 09:38.
10 Jan 2025
Severn Trent Water are carrying out roadworks on Derby Road, Denby, Ripley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2024 at 09:39.
10 Jan 2025
Severn Trent Water are carrying out roadworks on Derby Road, Denby, Ripley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2024 at 09:38.
10 Jan 2025
Severn Trent Water are carrying out Utility asset works on Derby Road, Marehay, Ripley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2024 at 09:39.
10 Jan 2025
Severn Trent Water are carrying out Utility asset works on Derby Road, Denby, Ripley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2024 at 09:38.
10 Jan 2025
Severn Trent Water are carrying out roadworks on Derby Road, Lower Kilburn, Belper.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2024 at 09:37.
10 Jan 2025
Severn Trent Water are carrying out roadworks on Derby Road, Lower Kilburn, Belper.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 14:39.
10 Jan 2025
Severn Trent Water are carrying out Utility asset works on Derby Road, Lower Kilburn, Belper.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2024 at 09:37.
10 Jan 2025
Severn Trent Water are carrying out roadworks on Derby Road, Denby, Ripley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2024 at 09:38.
20 Dec 2024
Nottinghamshire County Council are carrying out Works for road purposes on Watnall Road, Hucknall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 25 Oct 2024 at 16:20.
12 Aug 2024 and 27 Jan 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Shilo Way, Cossall.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Nottinghamshire County Council on 24 Jul 2024 at 12:30.
29 Nov 2024
Severn Trent Water are carrying out Utility asset works on Derby Road, Denby, Ripley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 17:22.
29 Nov 2024
Severn Trent Water are carrying out Utility asset works on Derby Road, Lower Kilburn, Belper.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 17:14.
6 Dec 2024
Nottinghamshire County Council are carrying out Highway repair and maintenance works on Moor Road, Brinsley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 20 Nov 2024 at 08:19.
21 Oct and 2 Dec 2024
Derbyshire County Council are proposing to carry out Section 50 on Birchwood Lane, Somercotes, Alfreton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 30 Sep 2024 at 14:11.
21 Oct and 28 Dec 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cromford Road, Langley Mill, Nottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Sep 2024 at 10:58.
30 Nov 2024
Nottinghamshire County Council are carrying out Highway improvement works on Castleton Close, Hucknall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:02.
30 Nov 2024
Nottinghamshire County Council are carrying out Highway improvement works on Hartington Avenue, Hucknall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 21 Nov 2024 at 12:01.
4 Dec 2024
Derbyshire County Council are carrying out roadworks on Pentrich Road, Ripley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 12:40 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Derbyshire County Council on 19 Nov 2024 at 15:17.
11 and 29 Nov 2024
Last Mile Gas are proposing to carry out Permanent reinstatement on Lynncroft, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 21 Aug 2024 at 07:38.
Tomorrow
Derbyshire County Council are carrying out Highway repair and maintenance works on Moss Lane, Ripley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:00 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 11 Nov 2024 at 09:56.
Tomorrow
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Moss Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 9 Aug 2024 at 14:52.
11 and 29 Nov 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Aug 2024 at 07:37.
20 Jan 2025
Severn Trent Water are carrying out Utility repair and maintenance works on Cromford Road, Langley Mill, Nottingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:00 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 10:02.
15 Nov 2024 and 20 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Argyle Street, Langley Mill, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 14:32.
15 Nov 2024 and 20 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Argyle Street, Langley Mill, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 09:36.
18 Nov and 6 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Aug 2024 at 09:00.
6 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Lynncroft, Eastwood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Nov 2024 at 09:36.
Saturday
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Derby Road, Swanwick, Alfreton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 30 Sep 2024 at 11:41.
6 Dec 2024
Last Mile Gas are carrying out Permanent reinstatement on Lynncroft, Eastwood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 18 Nov 2024 at 09:40.
18 Nov and 6 Dec 2024
Nottinghamshire County Council are proposing to carry out Section 50 on Lynncroft, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 16 Oct 2024 at 11:10.
6 Dec 2024
Nottinghamshire County Council are carrying out Section 50 on Lynncroft, Eastwood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 14:23.
Saturday
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Derby Road, Swanwick, Alfreton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 7 Oct 2024 at 14:10.
21 and 29 Nov 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Crescent Road, Selston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 26 Jun 2024 at 13:24.
2 and 4 Dec 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brickyard Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 10:11.
2 and 5 Dec 2024
Nottinghamshire County Council were proposing to carry out Works for road purposes on Green Farm Road, Selston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 15:55.
2 and 4 Dec 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brickyard Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Sep 2024 at 15:07.
2 and 6 Dec 2024
Derbyshire County Council are proposing to carry out Highway improvement works on Quarry Road, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 25 Oct 2024 at 16:05.
9 and 13 Dec 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Over Lane, Openwoodgate, Belper.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 21 Oct 2024 at 16:27.
9 and 13 Dec 2024
Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Over Lane, Openwoodgate, Belper.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 30 Sep 2024 at 10:57.
11 and 18 Dec 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Trent Drive, Hucknall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 5 Aug 2024 at 17:02.
11 and 18 Dec 2024
Nottinghamshire County Council were proposing to carry out Works for road purposes on Trent Drive, Hucknall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 15:16.
16 and 18 Dec 2024
Severn Trent Water are proposing to carry out New service connection on Park Street, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 16:36.
17 and 19 Dec 2024
Nottinghamshire County Council are proposing to carry out Works for road purposes on Langton Hollow, Selston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 10 Jul 2024 at 12:19.
23 and 27 Dec 2024
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Road, Ripley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 23 Sep 2024 at 11:54.
6 and 10 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Newthorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 15:07.
18 and 20 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Nov 2024 at 14:55.
18 and 20 Jan 2025
Network Rail were proposing to carry out Works for Rail Purposes on Park Lane, Selston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 30 Oct 2024 at 15:20.
20 and 23 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gregory Street, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 10:09.
20 and 23 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gregory Street, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 09:34.
20 and 24 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 09:56.
20 and 24 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lynncroft, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 15:23.
25 and 27 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Sep 2024 at 12:43.
25 and 27 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Aug 2024 at 16:32.
27 and 30 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lowes Hill, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 12:11.
27 and 30 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Lowes Hill, Ripley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 16:16.
27 and 29 Jan 2025
BT are proposing to carry out Utility asset works on Elm Tree Avenue, Kilburn, Belper.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by BT on 8 Nov 2024 at 13:07.
27 and 31 Jan 2025
Nottinghamshire County Council are proposing to carry out Highway improvement works on Mansfield Road, Underwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 10 Oct 2024 at 12:43.
27 and 29 Jan 2025
BT are proposing to carry out Utility asset works on Elm Tree Avenue, Kilburn, Belper.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by BT on 4 Nov 2024 at 15:38.
28 Jan and 28 Feb 2025
Derbyshire County Council are proposing to carry out Section 50 on Birchwood Lane, Somercotes, Alfreton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 18 Oct 2024 at 11:31.
3 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Peel Street, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 15:27.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Kimberley Road, Nuthall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:54.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Kimberley Road, Nuthall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:04.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Nuthall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:46.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Nuthall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:05.
3 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Watnall Road, Nuthall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 07:57.
3 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Peel Street, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 14:34.
5 and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Midland Road, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:55.
8 and 10 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Selston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Nov 2024 at 11:18.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Fairfield Road, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 12:03.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Fairfield Road, Ilkeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 12:48.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Park Street, Heanor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 13:25.
Roadworks Map near to Harold Avenue, NOTTINGHAM, NG16 4DZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Harold Avenue, NOTTINGHAM, NG16 4DZ (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 11 Nov 2024 - 20 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.