ROADWORKS SUMMARY
Old Epperstone Road, NOTTINGHAM, NG14 7BZ
Introduction

View current and future planned roadworks and road closures for Old Epperstone Road, NG14 7BZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Old Epperstone Road, NOTTINGHAM, NG14 7BZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Old Epperstone Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
21 Oct 2024 and 23 Oct 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 10:32.
6 Apr 2025
Nottinghamshire County Council are carrying out Works for road purposes on Nottingham Road, Bulcote.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 February 2025 at 08:50 and could run through until 6 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 28 Feb 2025 at 10:09.
6 Apr 2025
Nottinghamshire County Council are carrying out Works for road purposes on Old Main Road, Bulcote.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 February 2025 at 08:46 and could run through until 6 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 28 Feb 2025 at 10:09.
24 Feb and 6 Apr 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Bulcote.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 18 Dec 2024 at 09:11.
24 Feb and 6 Apr 2025
Nottinghamshire County Council are proposing to carry out Highway improvement works on Nottingham Road, Bulcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Nottinghamshire County Council on 12 Dec 2024 at 10:08.
24 Feb and 6 Apr 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Old Main Road, Bulcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 18 Dec 2024 at 09:10.
Sunday
Nottinghamshire County Council were proposing to carry out Highway improvement works on Shelford Road, Radcliffe On Trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 23 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 7 Mar 2025 at 15:57.
3 and 28 Mar 2025
Nottinghamshire County Council are proposing to carry out Highway improvement works on Main Street, Newton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 25 Feb 2025 at 11:49.
3 and 28 Mar 2025
Nottinghamshire County Council are proposing to carry out Highway improvement works on Main Street, Newton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 30 Jan 2025 at 11:21.
28 Mar 2025
Nottinghamshire County Council are carrying out Works for road purposes on Wellington Avenue, Newton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 14:00 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 3 Mar 2025 at 15:13.
Sunday
Nottinghamshire County Council were proposing to carry out Highway improvement works on Park Road, Radcliffe On Trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 23 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 7 Mar 2025 at 15:57.
Sunday
Nottinghamshire County Council were proposing to carry out Highway improvement works on Wakefield Avenue, Radcliffe On Trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 23 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 7 Mar 2025 at 15:58.
3 and 28 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wellington Avenue, Newton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 31 Jan 2025 at 13:55.
3 Apr 2025
Nottinghamshire County Council are carrying out Highway improvement works on Main Street, Newton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2025 at 06:40 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 12 Mar 2025 at 06:43.
10 and 28 Mar 2025
Nottinghamshire County Council are proposing to carry out Utility asset works on Lowdham Road, Epperstone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the verge only.
This roadwork event was last updated by Nottinghamshire County Council on 25 Feb 2025 at 11:16.
10 and 28 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Lowdham Road, Epperstone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the verge only.
This roadwork event was last updated by Nottinghamshire County Council on 14 Mar 2025 at 11:52.
10 Mar and 4 Apr 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Station Road, Carlton.
These works are categorised as Major.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 4 Mar 2025 at 15:03.
4 Apr 2025
ESP Electricity are carrying out Utility asset works on Woodborough Road, Mapperley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 March 2025 at 08:30 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 10 Mar 2025 at 08:42.
10 Mar and 4 Apr 2025
ESP Electricity are proposing to carry out Utility asset works on Woodborough Road, Mapperley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 17 Jan 2025 at 11:53.
10 Mar and 4 Apr 2025
ESP Electricity were proposing to carry out Utility asset works on Woodborough Road, Mapperley.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 15 Jan 2025 at 11:29.
10 Mar and 4 Apr 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Station Road, Carlton.
These works are categorised as Major.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 28 Feb 2025 at 13:56.
4 Apr 2025
Nottinghamshire County Council are carrying out Works for road purposes on Station Road, Carlton.
These works are categorised as Major.
The works started on 10 March 2025 at 09:30 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 10 Mar 2025 at 14:13.
Thursday
Nottinghamshire County Council are carrying out Works for road purposes on Wardle Grove, Arnold.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 March 2025 at 09:00 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 13 Mar 2025 at 09:02.
Thursday
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wardle Grove, Arnold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 20 Jan 2025 at 16:13.
Saturday
Nottinghamshire County Council are proposing to carry out Works for road purposes on Southwell Road, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 3 Feb 2025 at 15:58.
Saturday
Nottinghamshire County Council are proposing to carry out Works for road purposes on Oxton Hill, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 3 Feb 2025 at 15:58.
24 and 29 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Oxton Hill, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 11 Feb 2025 at 08:33.
24 and 29 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Southwell Road, Oxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 11 Feb 2025 at 08:33.
24 and 28 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Somersby Road, Woodthorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 30 Dec 2024 at 12:00.
25 and 27 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Arnold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 12 Mar 2025 at 15:18.
31 Mar and 8 Apr 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Worrall Avenue, Arnold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 17 Jan 2025 at 14:05.
31 Mar and 8 Apr 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Worrall Avenue, Arnold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 21 Jan 2025 at 12:30.
7 and 10 Apr 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 10 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 11:04.
8 Apr and 6 Jun 2025
Severn Trent Water were proposing to carry out Utility asset works on Leapool Roundabout, Redhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 April 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 21 Jan 2025 at 10:51.
9 and 15 Apr 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Needham Road, Arnold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 17 Jan 2025 at 13:55.
9 and 15 Apr 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Needham Road, Arnold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 21 Jan 2025 at 12:29.
14 Apr and 12 Jun 2025
Severn Trent Water were proposing to carry out Utility asset works on Leapool Roundabout, Redhill.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 12 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 23 Jan 2025 at 15:48.
28 Apr and 4 Jul 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Burton Road, Gedling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 10 Mar 2025 at 14:12.
28 Apr and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Saxondale Drive, Upper Saxondale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:01.
28 Apr and 2 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, Burton Joyce.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 22 Jan 2025 at 15:14.
28 Apr and 2 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, Burton Joyce.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 20 Jan 2025 at 16:03.
13 and 15 May 2025
Severn Trent Water were proposing to carry out Remedial works on South View Road, Carlton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 May 2025 and run through until 15 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Feb 2025 at 14:40.
13 and 15 May 2025
Severn Trent Water are proposing to carry out Remedial works on South View Road, Carlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Feb 2025 at 15:57.
13 and 15 May 2025
Severn Trent Water are proposing to carry out Remedial works on South View Road, Carlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Mar 2025 at 09:45.
19 and 21 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Greaves Lane, Edingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 20 Feb 2025 at 16:30.
19 and 21 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Greaves Lane, Edingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 28 Feb 2025 at 08:38.
19 and 21 May 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Waterhouse Lane, Gedling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 15:51.
19 and 21 May 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Waterhouse Lane, Gedling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 14:44.
26 May and 3 Jun 2025
BT are proposing to carry out Utility asset works on High Cross, Goverton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 6 Feb 2025 at 16:48.
27 and 29 May 2025
Severn Trent Water are proposing to carry out New service connection on St Albans Road, Arnold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Mar 2025 at 14:40.
27 and 29 May 2025
Severn Trent Water are proposing to carry out New service connection on St Albans Road, Arnold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Mar 2025 at 16:06.
27 and 30 May 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Spring Lane, Mapperley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 15:00.
2 and 6 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Bleasby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Jan 2025 at 08:45.
4 and 6 Jun 2025
Severn Trent Water are proposing to carry out New service connection on St Albans Road, Arnold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Mar 2025 at 11:09.
13 and 30 Jun 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Manor Lane, Shelford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 5 Mar 2025 at 15:57.
Roadworks Map near to Old Epperstone Road, NOTTINGHAM, NG14 7BZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Old Epperstone Road, NOTTINGHAM, NG14 7BZ (2 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.