ROADWORKS SUMMARY
Hawthorn Close, NOTTINGHAM, NG14 6BZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hawthorn Close, NG14 6BZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hawthorn Close, NOTTINGHAM, NG14 6BZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hawthorn Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are carrying out Utility asset works on Mansfield Road, Woodthorpe.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:15 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:04.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Woodthorpe Drive

Cadent Gas are proposing to carry out Utility asset works on Woodthorpe Drive, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:51.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 22 Jul 2024 at 08:35.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Villiers Road

Cadent Gas are proposing to carry out Utility asset works on Villiers Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:04.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Albemarle Road

Cadent Gas are proposing to carry out Utility asset works on Albemarle Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:01.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Egerton Road

Cadent Gas are proposing to carry out Utility asset works on Egerton Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 12:23.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Marlborough Road

Cadent Gas are proposing to carry out Utility asset works on Marlborough Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 12:55.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Woodthorpe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:06.

Severn Trent Water logo
LONG TERM
Between
21 Oct 2024 and 23 Oct 2025
Details
View Map
Share
Victoria Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 10:32.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Carlton Hill

Western Power Distribution (East Midlands) are carrying out Utility asset works on Carlton Hill, Carlton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:30 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Feb 2025 at 09:45.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Standhill Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Standhill Road, Carlton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 09:30 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Jan 2025 at 11:28.

Cadent Gas logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Villiers Road

Cadent Gas are carrying out Utility asset works on Villiers Road, Woodthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 09:40 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 09:45.

Cadent Gas logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Albemarle Road

Cadent Gas are carrying out Utility asset works on Albemarle Road, Woodthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 09:40 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 09:47.

Cadent Gas logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Egerton Road

Cadent Gas are carrying out Utility asset works on Egerton Road, Woodthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 09:40 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 09:46.

Cadent Gas logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Marlborough Road

Cadent Gas are carrying out Utility asset works on Marlborough Road, Woodthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 09:40 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 09:44.

Nottingham City Council logo
LONG TERM
Between
13 Jan and 2 Jun 2025
Details
View Map
Share
Follow
Oxclose Lane

Nottingham City Council are proposing to carry out Highway improvement works on Oxclose Lane, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottingham City Council on 15 Nov 2024 at 09:51.

Nottingham City Council logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Oxclose Lane

Nottingham City Council are carrying out Highway improvement works on Oxclose Lane, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 00:00 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 14 Jan 2025 at 08:16.

Nottingham City Council logo
LONG TERM
Between
13 Jan and 2 Jun 2025
Details
View Map
Share
Follow
Arnold Road

Nottingham City Council are proposing to carry out Highway improvement works on Arnold Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottingham City Council on 15 Nov 2024 at 09:51.

Nottingham City Council logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Arnold Road

Nottingham City Council are carrying out Highway improvement works on Arnold Road, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 00:00 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 14 Jan 2025 at 08:16.

Nottingham City Council logo
LONG TERM
Between
13 Jan and 2 Jun 2025
Details
View Map
Share
Follow
Edwards Lane

Nottingham City Council are proposing to carry out Highway improvement works on Edwards Lane, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottingham City Council on 15 Nov 2024 at 09:51.

Nottingham City Council logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Edwards Lane

Nottingham City Council are carrying out Highway improvement works on Edwards Lane, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 00:00 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 14 Jan 2025 at 08:16.

Western Power Distribution (East Midlands) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
First Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on First Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Jan 2025 at 14:39.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Church Road

Severn Trent Water were proposing to carry out Utility asset works on Church Road, Burton Joyce.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 15:34.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Church Road

Severn Trent Water are proposing to carry out Utility asset works on Church Road, Burton Joyce.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 09:13.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Church Road

Severn Trent Water were proposing to carry out Utility asset works on Church Road, Burton Joyce.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Jan 2025 at 14:35.

Western Power Distribution (East Midlands) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Besecar Avenue

Western Power Distribution (East Midlands) are carrying out Utility asset works on Besecar Avenue, Gedling.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 09:00 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Feb 2025 at 14:25.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Manor Lane

Nottinghamshire County Council were proposing to carry out Works for road purposes on Manor Lane, Shelford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 4 Feb 2025 at 08:29.

Western Power Distribution (East Midlands) logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Albert Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Albert Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Feb 2025 at 16:02.

Western Power Distribution (East Midlands) logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Mayfield Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Feb 2025 at 16:02.

Western Power Distribution (East Midlands) logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Cornhill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Cornhill Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Feb 2025 at 15:59.

Severn Trent Water logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Woodthorpe Road

Severn Trent Water are proposing to carry out Utility asset works on Woodthorpe Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 14:00.

Severn Trent Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lime Tree Gardens

Severn Trent Water are carrying out Utility repair and maintenance works on Lime Tree Gardens, Lowdham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 12:13 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Feb 2025 at 13:31.

Western Power Distribution (East Midlands) logo
Until
23 Feb 2025
Details
View Map
Share
Follow
Albert Avenue

Western Power Distribution (East Midlands) are carrying out Utility asset works on Albert Avenue, Carlton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 11:00 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Feb 2025 at 13:19.

Western Power Distribution (East Midlands) logo
Until
23 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Mayfield Road, Carlton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 11:00 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Feb 2025 at 13:09.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Orlando Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Orlando Drive, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 14 Jan 2025 at 10:37.

Nottinghamshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Orlando Drive

Nottinghamshire County Council are proposing to carry out Works for road purposes on Orlando Drive, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 15 Jan 2025 at 15:28.

Severn Trent Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Victoria Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:32.

Nottingham City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mildenhall Crescent

Nottingham City Council are proposing to carry out Highway improvement works on Mildenhall Crescent, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Nov 2024 at 14:09.

Nottingham City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mildenhall Crescent

Nottingham City Council are proposing to carry out Highway improvement works on Mildenhall Crescent, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 2 Dec 2024 at 09:00.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cross Street

Severn Trent Water are proposing to carry out Remedial works on Cross Street, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 14:08.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cross Street

Severn Trent Water are proposing to carry out Remedial works on Cross Street, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 14:17.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Cross Street

Severn Trent Water are proposing to carry out Remedial works on Cross Street, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 13:43.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Street, Burton Joyce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 15:56.

Western Power Distribution (East Midlands) logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Buntings Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Buntings Lane, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Feb 2025 at 14:02.

Western Power Distribution (East Midlands) logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Buntings Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Buntings Lane, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Feb 2025 at 12:04.

Nottinghamshire County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Ranmoor Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Ranmoor Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Dec 2024 at 13:31.

Nottinghamshire County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Ranmoor Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Ranmoor Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 2 Jan 2025 at 13:03.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Mansfield Street

Cadent Gas are proposing to carry out Utility asset works on Mansfield Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:08.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Mansfield Street

Cadent Gas are proposing to carry out Utility asset works on Mansfield Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 09:35.

Nottinghamshire County Council logo
LONG TERM
Between
24 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Old Main Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Old Main Road, Bulcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Dec 2024 at 09:10.

Nottinghamshire County Council logo
LONG TERM
Between
24 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Highway improvement works on Nottingham Road, Bulcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Nottinghamshire County Council on 12 Dec 2024 at 10:08.

Nottinghamshire County Council logo
LONG TERM
Between
24 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Bulcote.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 18 Dec 2024 at 09:11.

Nottinghamshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Bonner Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Bonner Lane, Calverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 2 Dec 2024 at 11:18.

Nottinghamshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Bonner Lane

Nottinghamshire County Council are proposing to carry out Works for road purposes on Bonner Lane, Calverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Dec 2024 at 16:12.

Nottinghamshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 27 Dec 2024 at 10:01.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Water Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Water Lane, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 10:48.

Nottinghamshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Epperstone Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Epperstone Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 13 Jan 2025 at 12:44.

Severn Trent Water logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mayfield Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 09:30.

Nottinghamshire County Council logo
Between
28 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Dale Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Dale Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Dec 2024 at 12:37.

Nottinghamshire County Council logo
Between
28 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Dale Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Dale Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 2 Jan 2025 at 13:04.

Cadent Gas logo
LONG TERM
Between
2 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Daybrook.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:47.

Cadent Gas logo
LONG TERM
Between
2 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Daybrook.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 12:09.

Cadent Gas logo
LONG TERM
Between
2 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Daybrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:50.

Cadent Gas logo
LONG TERM
Between
2 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Nottingham Road

Cadent Gas are proposing to carry out Utility asset works on Nottingham Road, Daybrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 10:05.

Severn Trent Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Second Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Second Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 09:47.

Nottingham City Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Brewsters Road

Nottingham City Council are proposing to carry out Highway improvement works on Brewsters Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 19 Nov 2024 at 14:07.

Nottingham City Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Brewsters Road

Nottingham City Council are proposing to carry out Highway improvement works on Brewsters Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 2 Dec 2024 at 09:14.

Nottinghamshire County Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Main Street

Nottinghamshire County Council are proposing to carry out Highway improvement works on Main Street, Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 30 Jan 2025 at 11:21.

Cadent Gas logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Ransom Road

Cadent Gas are proposing to carry out Utility asset works on Ransom Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:36.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Sherwood Vale

Cadent Gas are proposing to carry out Utility asset works on Sherwood Vale, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 10:34.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Sherwood Vale

Cadent Gas are proposing to carry out Utility asset works on Sherwood Vale, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Feb 2025 at 12:57.

Cadent Gas logo
Between
3 and 19 Mar 2025
Details
View Map
Share
Follow
Winchester Street

Cadent Gas are proposing to carry out Utility asset works on Winchester Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 10:34.

Cadent Gas logo
Between
3 and 19 Mar 2025
Details
View Map
Share
Follow
Winchester Street

Cadent Gas are proposing to carry out Utility asset works on Winchester Street, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 14:05.

Western Power Distribution (East Midlands) logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Oxclose Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Oxclose Lane, Arnold.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Nov 2024 at 14:15.

Western Power Distribution (East Midlands) logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Oxclose Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Oxclose Lane, Arnold.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Dec 2024 at 16:04.

Western Power Distribution (East Midlands) logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Oxclose Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Oxclose Lane, Arnold.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Jan 2025 at 14:43.

Nottinghamshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 28 Nov 2024 at 15:15.

Nottinghamshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Epperstone Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Epperstone Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 28 Nov 2024 at 15:15.

Nottinghamshire County Council logo
Between
5 and 12 Mar 2025
Details
View Map
Share
Follow
Dale Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Dale Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 3 Jan 2025 at 09:30.

Nottinghamshire County Council logo
Between
5 and 12 Mar 2025
Details
View Map
Share
Follow
Dale Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Dale Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 7 Jan 2025 at 12:44.

Nottinghamshire County Council logo
Between
6 and 12 Mar 2025
Details
View Map
Share
Follow
Bleasby Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Bleasby Road, Goverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Jan 2025 at 10:39.

Nottinghamshire County Council logo
Between
6 and 12 Mar 2025
Details
View Map
Share
Follow
Bleasby Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Bleasby Road, Goverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 10 Jan 2025 at 11:05.

Cadent Gas logo
Between
10 and 25 Mar 2025
Details
View Map
Share
Follow
Caunton Avenue

Cadent Gas are proposing to carry out Utility asset works on Caunton Avenue, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:36.

ESP Electricity logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Woodborough Road

ESP Electricity were proposing to carry out Utility asset works on Woodborough Road, Mapperley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 15 Jan 2025 at 11:29.

ESP Electricity logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Woodborough Road

ESP Electricity are proposing to carry out Utility asset works on Woodborough Road, Mapperley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 17 Jan 2025 at 11:53.

ESP Electricity logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Woodborough Road

ESP Electricity are proposing to carry out Utility asset works on Woodborough Road, Mapperley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 22 Jan 2025 at 15:47.

Network Rail logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Gonalston Lane

Network Rail are proposing to carry out Works for Rail Purposes on Gonalston Lane, Hoveringham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 19 Dec 2024 at 15:13.

Network Rail logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Gonalston Lane

Network Rail are proposing to carry out Works for Rail Purposes on Gonalston Lane, Hoveringham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Jan 2025 at 15:27.

Network Rail logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Gonalston Lane

Network Rail are proposing to carry out Works for Rail Purposes on Gonalston Lane, Hoveringham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Jan 2025 at 08:28.

Network Rail logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Hoveringham Lane

Network Rail are proposing to carry out Works for Rail Purposes on Hoveringham Lane, Gonalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 19 Dec 2024 at 15:14.

Network Rail logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Hoveringham Lane

Network Rail are proposing to carry out Works for Rail Purposes on Hoveringham Lane, Gonalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Jan 2025 at 15:27.

Network Rail logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Hoveringham Lane

Network Rail are proposing to carry out Works for Rail Purposes on Hoveringham Lane, Gonalston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Jan 2025 at 08:28.

Nottingham City Council logo
Between
11 and 14 Mar 2025
Details
View Map
Share
Follow
Elmbridge

Nottingham City Council are proposing to carry out Highway improvement works on Elmbridge, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 3 Feb 2025 at 13:32.

Nottingham City Council logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Cottam Drive

Nottingham City Council are proposing to carry out Highway improvement works on Cottam Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 3 Feb 2025 at 13:30.

Network Rail logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Stoke Lane

Network Rail are proposing to carry out Works for Rail Purposes on Stoke Lane, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Nov 2024 at 10:25.

Network Rail logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Stoke Lane

Network Rail are proposing to carry out Works for Rail Purposes on Stoke Lane, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Jan 2025 at 11:18.

Network Rail logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Stoke Lane

Network Rail are proposing to carry out Works for Rail Purposes on Stoke Lane, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Jan 2025 at 10:55.

Nottinghamshire County Council logo
Between
13 and 20 Mar 2025
Details
View Map
Share
Follow
Wardle Grove

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wardle Grove, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Jan 2025 at 16:13.

Nottinghamshire County Council logo
Between
13 and 20 Mar 2025
Details
View Map
Share
Follow
Wardle Grove

Nottinghamshire County Council are proposing to carry out Works for road purposes on Wardle Grove, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Jan 2025 at 12:29.

Nottingham City Council logo
Between
16 and 19 Mar 2025
Details
View Map
Share
Follow
Woodlane Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Woodlane Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 3 Feb 2025 at 13:31.

Nottingham City Council logo
Between
16 and 18 Mar 2025
Details
View Map
Share
Follow
Boynton Drive

Nottingham City Council are proposing to carry out Highway improvement works on Boynton Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 3 Feb 2025 at 13:32.

Nottingham City Council logo
Between
16 and 18 Mar 2025
Details
View Map
Share
Follow
Eaton Street

Nottingham City Council are proposing to carry out Highway improvement works on Eaton Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 3 Feb 2025 at 13:31.

BT logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Edern Gardens

BT are proposing to carry out Utility asset works on Edern Gardens, Nottingham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Dec 2024 at 10:30.

Nottinghamshire County Council logo
Between
17 and 22 Mar 2025
Details
View Map
Share
Follow
Southwell Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Southwell Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 3 Feb 2025 at 15:58.

Nottinghamshire County Council logo
Between
17 and 22 Mar 2025
Details
View Map
Share
Follow
Oxton Hill

Nottinghamshire County Council are proposing to carry out Works for road purposes on Oxton Hill, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 3 Feb 2025 at 15:58.

Nottingham City Council logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Elmbridge

Nottingham City Council are proposing to carry out Highway improvement works on Elmbridge, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 13:22.

Nottingham City Council logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Cottam Drive

Nottingham City Council are proposing to carry out Highway improvement works on Cottam Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 13:24.

Nottingham City Council logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Cottam Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Cottam Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 09:08.

Nottingham City Council logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Cottam Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Cottam Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 12:46.

Nottingham City Council logo
Between
19 and 25 Mar 2025
Details
View Map
Share
Follow
Valley Road

Nottingham City Council are proposing to carry out Highway improvement works on Valley Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 09:08.

Nottingham City Council logo
Between
19 and 25 Mar 2025
Details
View Map
Share
Follow
Valley Road

Nottingham City Council are proposing to carry out Highway improvement works on Valley Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 13:22.

Nottingham City Council logo
Between
23 and 26 Mar 2025
Details
View Map
Share
Follow
Woodlane Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Woodlane Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 12:44.

Nottingham City Council logo
Between
23 and 25 Mar 2025
Details
View Map
Share
Follow
Boynton Drive

Nottingham City Council are proposing to carry out Highway improvement works on Boynton Drive, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 13:19.

Nottingham City Council logo
Between
23 and 25 Mar 2025
Details
View Map
Share
Follow
Eaton Street

Nottingham City Council are proposing to carry out Highway improvement works on Eaton Street, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 13:24.

Severn Trent Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Woodthorpe Road

Severn Trent Water are proposing to carry out New service connection on Woodthorpe Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Dec 2024 at 11:15.

Severn Trent Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Woodthorpe Road

Severn Trent Water are proposing to carry out New service connection on Woodthorpe Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Dec 2024 at 12:54.

Nottinghamshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Somersby Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Somersby Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 30 Dec 2024 at 12:00.

Nottinghamshire County Council logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Southwell Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Southwell Road, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Feb 2025 at 08:33.

Nottinghamshire County Council logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Oxton Hill

Nottinghamshire County Council are proposing to carry out Works for road purposes on Oxton Hill, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Feb 2025 at 08:33.

Nottingham City Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Dale View Road

Nottingham City Council are proposing to carry out Highway improvement works on Dale View Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 09:04.

Nottingham City Council logo
Between
25 and 27 Mar 2025
Details
View Map
Share
Follow
Dale View Road

Nottingham City Council are proposing to carry out Highway improvement works on Dale View Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 13:21.

Nottinghamshire County Council logo
Between
31 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Worrall Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Worrall Avenue, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 17 Jan 2025 at 14:05.

Nottinghamshire County Council logo
Between
31 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Worrall Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Worrall Avenue, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Jan 2025 at 12:30.

Nottingham City Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Springwood Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Springwood Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 4 Feb 2025 at 11:22.

Nottingham City Council logo
Between
1 and 3 Apr 2025
Details
View Map
Share
Follow
Springwood Gardens

Nottingham City Council are proposing to carry out Highway improvement works on Springwood Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottingham City Council on 12 Feb 2025 at 11:16.

Severn Trent Water logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Victoria Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 10 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 11:04.

Cadent Gas logo
LONG TERM
Between
7 Apr and 17 May 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Woodthorpe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 14:30.

Cadent Gas logo
LONG TERM
Between
7 Apr and 17 May 2025
Details
View Map
Share
Mansfield Road

Cadent Gas were proposing to carry out Utility asset works on Mansfield Road, Nottingham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 17 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 15:28.

Cadent Gas logo
LONG TERM
Between
7 Apr and 17 May 2025
Details
View Map
Share
Follow
Thackerays Lane

Cadent Gas are proposing to carry out Utility asset works on Thackerays Lane, Daybrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 12:21.

Cadent Gas logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Thackerays Lane

Cadent Gas are proposing to carry out Utility asset works on Thackerays Lane, Daybrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 10:15.

Cadent Gas logo
LONG TERM
Between
7 Apr and 17 May 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Daybrook.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 14:21.

Severn Trent Water logo
LONG TERM
Between
8 Apr and 6 Jun 2025
Details
View Map
Share
Leapool Roundabout

Severn Trent Water were proposing to carry out Utility asset works on Leapool Roundabout, Redhill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 21 Jan 2025 at 10:51.

Nottinghamshire County Council logo
Between
9 and 15 Apr 2025
Details
View Map
Share
Follow
Needham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Needham Road, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 17 Jan 2025 at 13:55.

Nottinghamshire County Council logo
Between
9 and 15 Apr 2025
Details
View Map
Share
Follow
Needham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Needham Road, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Jan 2025 at 12:29.

Severn Trent Water logo
LONG TERM
Between
14 Apr and 12 Jun 2025
Details
View Map
Share
Leapool Roundabout

Severn Trent Water were proposing to carry out Utility asset works on Leapool Roundabout, Redhill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 12 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 23 Jan 2025 at 15:48.

Nottinghamshire County Council logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Byron Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Byron Street, Daybrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Jan 2025 at 16:17.

Nottinghamshire County Council logo
Between
22 Apr and 6 May 2025
Details
View Map
Share
Follow
Byron Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Byron Street, Daybrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 21 Jan 2025 at 12:43.

Severn Trent Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 20 Jan 2025 at 16:03.

Severn Trent Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 22 Jan 2025 at 15:14.

BT logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Edern Gardens

BT are proposing to carry out Utility asset works on Edern Gardens, Nottingham.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Jan 2025 at 15:21.

BT logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Edern Gardens

BT were proposing to carry out Utility asset works on Edern Gardens, Nottingham.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 07:31.

Cadent Gas logo
LONG TERM
Between
5 May and 16 Jun 2025
Details
View Map
Share
Follow
Valley Road

Cadent Gas are proposing to carry out Utility asset works on Valley Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 15:00.

Cadent Gas logo
LONG TERM
Between
5 May and 16 Jun 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 15:09.

Severn Trent Water logo
Between
13 and 15 May 2025
Details
View Map
Share
South View Road

Severn Trent Water were proposing to carry out Remedial works on South View Road, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 May 2025 and run through until 15 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Feb 2025 at 14:40.

Severn Trent Water logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
South View Road

Severn Trent Water are proposing to carry out Remedial works on South View Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Feb 2025 at 15:57.


Roadworks Map near to Hawthorn Close, NOTTINGHAM, NG14 6BZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Feb 2025 18:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hawthorn Close, NOTTINGHAM, NG14 6BZ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.