ROADWORKS SUMMARY
Wellington Road, NOTTINGHAM, NG14 5GQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wellington Road, NG14 5GQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wellington Road, NOTTINGHAM, NG14 5GQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wellington Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are carrying out Utility asset works on Mansfield Road, Woodthorpe.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:15 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:04.

Nottinghamshire County Council logo
LONG TERM
Between
30 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Shelford Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Shelford Road, Radcliffe On Trent.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2024 at 14:25.

Cadent Gas logo
LONG TERM
Between
30 Sep and 1 Dec 2024
Details
View Map
Share
Follow
Elmswood Gardens

Cadent Gas are proposing to carry out Utility asset works on Elmswood Gardens, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 13:35.

Cadent Gas logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Elmswood Gardens

Cadent Gas are carrying out Utility asset works on Elmswood Gardens, Nottingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:15 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:50.

Cadent Gas logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Woodthorpe Drive

Cadent Gas are carrying out Utility asset works on Woodthorpe Drive, Woodthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:15 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:01.

Cadent Gas logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are carrying out Utility asset works on Mansfield Road, Nottingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:15 and could run through until 1 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 14:44.

Nottinghamshire County Council logo
LONG TERM
Between
14 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Radcliffe On Trent.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 2 Oct 2024 at 13:46.

Nottinghamshire County Council logo
LONG TERM
Between
14 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Radcliffe On Trent.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nottinghamshire County Council on 7 Oct 2024 at 14:40.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Woodthorpe Drive

Cadent Gas are proposing to carry out Utility asset works on Woodthorpe Drive, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:51.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Nottingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 22 Jul 2024 at 08:35.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Villiers Road

Cadent Gas are proposing to carry out Utility asset works on Villiers Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:04.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Albemarle Road

Cadent Gas are proposing to carry out Utility asset works on Albemarle Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:01.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Egerton Road

Cadent Gas are proposing to carry out Utility asset works on Egerton Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 12:23.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Marlborough Road

Cadent Gas are proposing to carry out Utility asset works on Marlborough Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 12:55.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Mansfield Road

Cadent Gas are proposing to carry out Utility asset works on Mansfield Road, Woodthorpe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:06.

Severn Trent Water logo
LONG TERM
Between
21 Oct 2024 and 23 Oct 2025
Details
View Map
Share
Victoria Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 10:32.

Severn Trent Water logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out Utility asset works on Main Street, Burton Joyce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 15:17.

Severn Trent Water logo
LONG TERM
Between
21 Oct 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility asset works on Main Street, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 09:04.

Severn Trent Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are carrying out Utility asset works on Main Street, Burton Joyce.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 09:06.

Western Power Distribution (East Midlands) logo
Finishing
Today
Details
View Map
Share
Follow
St Lawrence Boulevard

Western Power Distribution (East Midlands) are carrying out New service connection on St Lawrence Boulevard, Radcliffe On Trent.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:28 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 14:26.

Nottinghamshire County Council logo
LONG TERM
Between
4 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Bulcote Farm Access Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Bulcote Farm Access Road, Old Main Road, Bulcote.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 11 Nov 2024 at 16:12.

Nottinghamshire County Council logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Bulcote Farm Access Road

Nottinghamshire County Council are carrying out Works for road purposes on Bulcote Farm Access Road, Old Main Road, Bulcote.

These works are categorised as Major.

The works started on 4 November 2024 at 09:30 and could run through until 4 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nottinghamshire County Council on 11 Nov 2024 at 16:13.

Cadent Gas logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Thomas Avenue

Cadent Gas are proposing to carry out Utility asset works on Thomas Avenue, Radcliffe On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:29.

Cadent Gas logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Thomas Avenue

Cadent Gas are carrying out Utility asset works on Thomas Avenue, Radcliffe On Trent.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 12:50 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 15:26.

Western Power Distribution (East Midlands) logo
Finishing
Today
Details
View Map
Share
Follow
St Bartholomews Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on St Bartholomews Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Sep 2024 at 13:45.

Murphy Power Distribution logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Butt Lane

Murphy Power Distribution are proposing to carry out Utility asset works on Butt Lane, East Bridgford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 10 Sep 2024 at 10:26.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Sherwood Vale

Cadent Gas were proposing to carry out Utility asset works on Sherwood Vale, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:18.

Nottinghamshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on High Street, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 11 Sep 2024 at 13:49.

Nottinghamshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
High Street

Nottinghamshire County Council are carrying out Works for road purposes on High Street, Arnold.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 20:00 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 08:20.

Severn Trent Water logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Meadow Lane

Severn Trent Water are carrying out Utility asset works on Meadow Lane, Burton Joyce.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 08:52.

Severn Trent Water logo
Between
14 and 29 Nov 2024
Details
View Map
Share
Follow
Foxhill Road Central

Severn Trent Water are proposing to carry out Utility asset works on Foxhill Road Central, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 16:12.

Severn Trent Water logo
Between
14 and 29 Nov 2024
Details
View Map
Share
Foxhill Road Central

Severn Trent Water were proposing to carry out Utility asset works on Foxhill Road Central, Carlton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 13:10.

Severn Trent Water logo
Until
3 Dec 2024
Details
View Map
Share
Follow
Foxhill Road Central

Severn Trent Water are carrying out Utility asset works on Foxhill Road Central, Carlton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:54.

Western Power Distribution (East Midlands) logo
Between
15 and 30 Nov 2024
Details
View Map
Share
Follow
Forester Grove

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Forester Grove, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Oct 2024 at 11:41.

Western Power Distribution (East Midlands) logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Forester Grove

Western Power Distribution (East Midlands) are carrying out Utility asset works on Forester Grove, Carlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:55 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Nov 2024 at 15:13.

Nottinghamshire County Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Tithby Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Tithby Road, Bingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Oct 2024 at 15:09.

Nottinghamshire County Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Tithby Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Tithby Road, Bingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Aug 2024 at 16:58.

Nottinghamshire County Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Nottingham Road, Bingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Oct 2024 at 15:08.

Nottinghamshire County Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Bingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Aug 2024 at 16:56.

Nottinghamshire County Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Long Acre

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Long Acre, Bingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 27 Sep 2024 at 16:04.

Nottinghamshire County Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Long Acre

Nottinghamshire County Council are proposing to carry out Works for road purposes on Long Acre, Bingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Aug 2024 at 16:57.

Nottinghamshire County Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Fairfield Street

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Street, Bingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Oct 2024 at 15:09.

Nottinghamshire County Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Fairfield Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Fairfield Street, Bingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Aug 2024 at 16:57.

Western Power Distribution (East Midlands) logo
Finishing
Today
Details
View Map
Share
Forester Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Forester Road, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Oct 2024 at 11:30.

Western Power Distribution (East Midlands) logo
Finishing
Today
Details
View Map
Share
Follow
Forester Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Forester Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2024 at 09:54.

Western Power Distribution (East Midlands) logo
Finishing
Today
Details
View Map
Share
Follow
Forester Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Forester Road, Carlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:55 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 09:20.

Severn Trent Water logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Church Road

Severn Trent Water were proposing to carry out Utility asset works on Church Road, Burton Joyce.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 29 Aug 2024 at 12:22.

Severn Trent Water logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Meadow Lane

Severn Trent Water were proposing to carry out Utility asset works on Meadow Lane, Burton Joyce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Sep 2024 at 15:09.

Severn Trent Water logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Meadow Lane

Severn Trent Water were proposing to carry out Utility asset works on Meadow Lane, Burton Joyce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 29 Aug 2024 at 12:22.

Cadent Gas logo
Between
19 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Meadow End

Cadent Gas are proposing to carry out Utility asset works on Meadow End, Radcliffe On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:30.

Nottinghamshire County Council logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Tithby Road

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Tithby Road, Bingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 12 Nov 2024 at 12:43.

Nottinghamshire County Council logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Nottingham Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Nottingham Road, Bingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 12 Nov 2024 at 12:48.

Nottinghamshire County Council logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Long Acre

Nottinghamshire County Council are proposing to carry out Works for road purposes on Long Acre, Bingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 12 Nov 2024 at 12:49.

Nottinghamshire County Council logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Fairfield Street

Nottinghamshire County Council are proposing to carry out Works for road purposes on Fairfield Street, Bingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 12 Nov 2024 at 12:49.

Western Power Distribution (East Midlands) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Thorneywood Rise

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Thorneywood Rise, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Sep 2024 at 13:45.

Western Power Distribution (East Midlands) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Standhill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Standhill Road, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Oct 2024 at 14:25.

Western Power Distribution (East Midlands) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Standhill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Standhill Road, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 11:12.

Western Power Distribution (East Midlands) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Besecar Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Besecar Avenue, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Oct 2024 at 09:54.

Western Power Distribution (East Midlands) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Besecar Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Besecar Avenue, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 11:59.

Severn Trent Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Water Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Water Lane, Oxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 16:13.

Severn Trent Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Flintham Lane

Severn Trent Water are proposing to carry out New service connection on Flintham Lane, Screveton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2024 at 12:14.

Western Power Distribution (East Midlands) logo
Between
28 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Thorneywood Mount

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Thorneywood Mount, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Sep 2024 at 13:43.

Nottinghamshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Stoke Lane

Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Stoke Lane, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 29 Oct 2024 at 14:11.

Severn Trent Water logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Trent Lane

Severn Trent Water were proposing to carry out Utility asset works on Trent Lane, Burton Joyce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Sep 2024 at 15:09.

Cadent Gas logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Shaftesbury Avenue

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Shaftesbury Avenue, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:14.

Cadent Gas logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Shaftesbury Avenue

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Shaftesbury Avenue, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 13:01.

Severn Trent Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Arnot Hill Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Arnot Hill Road, Arnold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 15:15.

Severn Trent Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Arnot Hill Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Arnot Hill Road, Arnold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 16:34.

Nottinghamshire County Council logo
Between
3 and 10 Dec 2024
Details
View Map
Share
Follow
Dale Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Dale Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Jul 2024 at 10:20.

Nottinghamshire County Council logo
Between
3 and 10 Dec 2024
Details
View Map
Share
Dale Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Dale Road, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 10 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Nov 2024 at 14:15.

Western Power Distribution (East Midlands) logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Thorneywood Rise

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Thorneywood Rise, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Sep 2024 at 12:16.

Western Power Distribution (East Midlands) logo
Between
5 and 18 Dec 2024
Details
View Map
Share
St Bartholomews Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on St Bartholomews Road, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Sep 2024 at 12:14.

Western Power Distribution (East Midlands) logo
Between
5 and 11 Dec 2024
Details
View Map
Share
Buntings Lane

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Buntings Lane, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Sep 2024 at 14:25.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
5 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Thorneywood Mount

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Thorneywood Mount, Nottingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Sep 2024 at 12:10.

Western Power Distribution (East Midlands) logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Carnarvon Grove

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Carnarvon Grove, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Oct 2024 at 11:32.

Western Power Distribution (East Midlands) logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Carnarvon Grove

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Carnarvon Grove, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 13:05.

Severn Trent Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Arnot Hill Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Arnot Hill Road, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 12:58.

Severn Trent Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
George Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on George Street, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 12:58.

Nottinghamshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Dale Avenue

Nottinghamshire County Council are proposing to carry out Works for road purposes on Dale Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 18 Jul 2024 at 11:10.

Nottinghamshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Dale Avenue

Nottinghamshire County Council were proposing to carry out Works for road purposes on Dale Avenue, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Nov 2024 at 12:47.

Nottinghamshire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Ranmoor Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Ranmoor Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 9 Sep 2024 at 17:11.

Nottinghamshire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Ranmoor Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Ranmoor Road, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 19 Nov 2024 at 14:48.

Cadent Gas logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Shaftesbury Avenue

Cadent Gas are proposing to carry out New service connection on Shaftesbury Avenue, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 16:18.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out New service connection on Main Street, Calverton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:52.

Cadent Gas logo
Between
17 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Caunton Avenue

Cadent Gas are proposing to carry out Utility asset works on Caunton Avenue, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:42.

Network Rail logo
Between
3 and 6 Jan 2025
Details
View Map
Share
Follow
Bulcote Farm Access Road

Network Rail are proposing to carry out Works for Rail Purposes on Bulcote Farm Access Road, Old Main Road, Bulcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 10:28.

Severn Trent Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Nottingham Road

Severn Trent Water are proposing to carry out Utility asset works on Nottingham Road, Radcliffe On Trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 14:52.

Severn Trent Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
St Lawrence Boulevard

Severn Trent Water are proposing to carry out Utility asset works on St Lawrence Boulevard, Radcliffe On Trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 11:46.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Victoria Road

BT are proposing to carry out Utility repair and maintenance works on Victoria Road, Nottinghamshire, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Oct 2024 at 10:07.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Victoria Road

BT are proposing to carry out Utility repair and maintenance works on Victoria Road, Nottinghamshire, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Oct 2024 at 13:22.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Carlton Hill

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Carlton Hill, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Nov 2024 at 11:59.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Carlton Hill

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Carlton Hill, Carlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Nov 2024 at 15:15.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Ransom Road

Cadent Gas are proposing to carry out Utility asset works on Ransom Road, Nottingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:49.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kirk Hill

Cadent Gas are proposing to carry out Utility asset works on Kirk Hill, East Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:57.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kirk Hill

Cadent Gas are proposing to carry out Utility asset works on Kirk Hill, East Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:03.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kirk Hill

Cadent Gas are proposing to carry out Utility asset works on Kirk Hill, East Bridgford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:17.

Western Power Distribution (East Midlands) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Arnold Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Arnold Lane, Gedling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 09:02.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Villiers Road

Cadent Gas are proposing to carry out Utility asset works on Villiers Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Albemarle Road

Cadent Gas are proposing to carry out Utility asset works on Albemarle Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Egerton Road

Cadent Gas are proposing to carry out Utility asset works on Egerton Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Marlborough Road

Cadent Gas are proposing to carry out Utility asset works on Marlborough Road, Woodthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:30.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
St Albans Road

Cadent Gas are proposing to carry out New service connection on St Albans Road, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 14:32.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
St Albans Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on St Albans Road, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:05.

Nottinghamshire County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Mapperley Plains

Nottinghamshire County Council are proposing to carry out Works for road purposes on Mapperley Plains, Arnold.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Nottinghamshire County Council on 22 Nov 2024 at 09:26.

Nottinghamshire County Council logo
Between
7 and 15 Jan 2025
Details
View Map
Share
Follow
Norman Road

Nottinghamshire County Council are proposing to carry out Works for road purposes on Norman Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 5 Sep 2024 at 14:02.

Nottinghamshire County Council logo
Between
7 and 15 Jan 2025
Details
View Map
Share
Norman Road

Nottinghamshire County Council were proposing to carry out Works for road purposes on Norman Road, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nottinghamshire County Council on 20 Nov 2024 at 08:34.

Severn Trent Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out New service connection on Main Street, Calverton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:52.

Severn Trent Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Rushcliffe Avenue

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Rushcliffe Avenue, Carlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 09:42.

Severn Trent Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Rushcliffe Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Rushcliffe Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 14:48.

Severn Trent Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Rushcliffe Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Rushcliffe Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Oct 2024 at 11:44.

Severn Trent Water logo
Between
8 and 21 Jan 2025
Details
View Map
Share
Meadow Lane

Severn Trent Water were proposing to carry out Utility asset works on Meadow Lane, Burton Joyce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 15:20.

Severn Trent Water logo
Between
8 and 21 Jan 2025
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out Utility asset works on Main Street, Burton Joyce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 21 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 15:19.

Western Power Distribution (East Midlands) logo
Between
11 and 16 Jan 2025
Details
View Map
Share
Follow
Tithby Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Tithby Road, Tithby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 16 January 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Oct 2024 at 17:37.

Severn Trent Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Cross Street

Severn Trent Water were proposing to carry out Remedial works on Cross Street, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 13:24.

BT logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Victoria Road

BT are proposing to carry out Utility repair and maintenance works on Victoria Road, Nottinghamshire, Netherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 13:08.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Emmanuel Avenue

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Emmanuel Avenue, Mapperley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 12:46.

Severn Trent Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Lascelles Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lascelles Avenue, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 13:31.

Severn Trent Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Lascelles Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lascelles Avenue, Gedling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 10:33.

Severn Trent Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Meadow Lane

Severn Trent Water are proposing to carry out Utility asset works on Meadow Lane, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 09:11.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Arnot Hill Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Arnot Hill Road, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 11:48.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
George Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on George Street, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 11:47.

Severn Trent Water logo
Between
21 Jan and 10 Feb 2025
Details
View Map
Share
Church Road

Severn Trent Water were proposing to carry out Utility asset works on Church Road, Burton Joyce.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 15:21.

Severn Trent Water logo
Between
21 Jan and 3 Feb 2025
Details
View Map
Share
Trent Lane

Severn Trent Water were proposing to carry out Utility asset works on Trent Lane, Burton Joyce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 15:20.

Western Power Distribution (East Midlands) logo
Between
23 and 28 Jan 2025
Details
View Map
Share
Follow
A52 From Dualling North Of Barrowby To J A46

Western Power Distribution (East Midlands) are proposing to carry out New service connection on A52 From Dualling North Of Barrowby To J A46, Rushcliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Oct 2024 at 08:48.

Severn Trent Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Shelford Road

Severn Trent Water are proposing to carry out New service connection on Shelford Road, Radcliffe On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 16:15.

Severn Trent Water logo
Between
31 Jan and 20 Feb 2025
Details
View Map
Share
Church Road

Severn Trent Water were proposing to carry out Utility asset works on Church Road, Burton Joyce.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Sep 2024 at 15:34.

Severn Trent Water logo
Between
31 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Church Road

Severn Trent Water are proposing to carry out Utility asset works on Church Road, Burton Joyce.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 09:13.

Severn Trent Water logo
Between
31 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Church Road

Severn Trent Water are proposing to carry out Utility asset works on Church Road, Burton Joyce.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 14:43.

Severn Trent Water logo
Between
31 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Trent Lane

Severn Trent Water are proposing to carry out Utility asset works on Trent Lane, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 09:12.

Severn Trent Water logo
Between
31 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Trent Lane

Severn Trent Water are proposing to carry out Utility asset works on Trent Lane, Burton Joyce.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 14:43.

Severn Trent Water logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Follow
Shelford Road

Severn Trent Water are proposing to carry out New service connection on Shelford Road, Radcliffe On Trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 15:51.

Severn Trent Water logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Shelford Road

Severn Trent Water were proposing to carry out New service connection on Shelford Road, Radcliffe On Trent.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 3 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 10:27.

Severn Trent Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Second Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Second Avenue, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 15:21.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Cross Street

Severn Trent Water were proposing to carry out Remedial works on Cross Street, Arnold.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 11:49.

Severn Trent Water logo
Between
4 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Nottingham Road

Severn Trent Water are proposing to carry out Utility asset works on Nottingham Road, Radcliffe On Trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 16:16.

Severn Trent Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mayfield Road, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 10:07.

Severn Trent Water logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Woodthorpe Road

Severn Trent Water are proposing to carry out Utility asset works on Woodthorpe Road, Nottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 14:00.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lime Tree Gardens

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lime Tree Gardens, Lowdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 09:11.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lime Tree Gardens

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lime Tree Gardens, Lowdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 13:02.

Severn Trent Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Victoria Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Netherfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:32.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Cross Street

Severn Trent Water are proposing to carry out Remedial works on Cross Street, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 14:08.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Cross Street

Severn Trent Water are proposing to carry out Remedial works on Cross Street, Arnold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 14:17.

Severn Trent Water logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Street, Burton Joyce.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 15:56.


Roadworks Map near to Wellington Road, NOTTINGHAM, NG14 5GQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 11:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wellington Road, NOTTINGHAM, NG14 5GQ (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
URGENT
  
CRIFTIN ROAD 
(0.2 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 22 Nov 2024 - 25 Nov 2024)
0.2
Details
Share
2
Severn Trent Water logo
MAJOR
  
OLD MAIN ROAD 
(0.2 miles)
Severn Trent Water
Optional permit (no fee) e.g. for traffic management etc - Carriageway, Verge - Some carriageway incursion
In Progress
Since: 21 Oct 2024 09:50
(Scheduled: 21 Oct 2024 - 26 Feb 2025)
0.2
Details
Share
Follow
3
Nottinghamshire County Council logo
URGENT
  
CHURCH ROAD 
(0.3 miles)
Nottinghamshire County Council
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 19 Nov 2024 09:00
(Scheduled: 19 Nov 2024 - 22 Nov 2024)
0.3
Details
Share
Follow
4
Severn Trent Water logo
MAJOR
  
MAIN STREET 
(0.3 miles)
Severn Trent Water
Utility asset works - Footway, Carriageway - Road closure
In Progress
Since: 21 Oct 2024 08:00
(Scheduled: 21 Oct 2024 - 31 Jan 2025)
0.3
Details
Share
Follow
5
Severn Trent Water logo
MAJOR
  
MAIN STREET 
(0.3 miles)
Severn Trent Water
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 21 Oct 2024 - 31 Jan 2025
0.3
Details
Share
Follow
6
Severn Trent Water logo
MAJOR
  
TRENT LANE 
(0.3 miles)
Severn Trent Water
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 21 Oct 2024 - 26 Feb 2025)
0.3
Details
Share
7
Severn Trent Water logo
MAJOR
  
CHURCH ROAD 
(0.3 miles)
Severn Trent Water
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 18 Nov 2024 - 13 Dec 2024)
0.3
Details
Share
8
Severn Trent Water logo
MAJOR
  
MAIN STREET 
(0.4 miles)
Severn Trent Water
Utility asset works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 21 Oct 2024 - 13 Dec 2024)
0.4
Details
Share
9
Severn Trent Water logo
MAJOR
  
MEADOW LANE 
(0.4 miles)
Severn Trent Water
Utility asset works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 18 Nov 2024 - 13 Dec 2024)
0.4
Details
Share
10
Severn Trent Water logo
MAJOR
  
MEADOW LANE 
(0.4 miles)
Severn Trent Water
Utility asset works - Carriageway - Road closure
In Progress
Since: 12 Nov 2024 08:00
(Scheduled: 12 Nov 2024 - 29 Nov 2024)
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.