ROADWORKS SUMMARY
Albert Road, NOTTINGHAM, NG11 6QE
Introduction
View current and future planned roadworks and road closures for Albert Road, NG11 6QE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Albert Road, NOTTINGHAM, NG11 6QE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Albert Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Sep 2024 and 2 Jun 2025
Nottingham City Council are proposing to carry out Highway improvement works on Thane Road, Nottingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 2 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Nottingham City Council on 19 Aug 2024 at 15:06.
31 Jan 2025
Severn Trent Water are carrying out Utility asset works on Loughborough Road, East Leake.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 11:50 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Jan 2025 at 11:52.
Friday
Severn Trent Water are carrying out Utility asset works on Loughborough Road, West Bridgford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 21:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 09:34.
Friday
Severn Trent Water are proposing to carry out Utility asset works on Loughborough Road, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 14:21.
Friday
Severn Trent Water were proposing to carry out Utility asset works on Loughborough Road, West Bridgford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 11:47.
Friday
Severn Trent Water are carrying out roadworks on Loughborough Road, Ruddington.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 21:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 09:35.
6 Jan and 28 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Tollerton Lane, Tollerton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:54.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tollerton Lane, Tollerton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:25.
Friday
Nottinghamshire County Council are carrying out Highway repair and maintenance works on Kirk Lane, Ruddington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 11:15 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 6 Jan 2025 at 11:18.
Friday
Nottinghamshire County Council are proposing to carry out Highway repair and maintenance works on Kirk Lane, Ruddington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 4 Dec 2024 at 11:29.
6 and 31 Jan 2025
Severn Trent Water are proposing to carry out Utility asset works on Loughborough Road, East Leake.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 14:23.
7 Jan and 20 Mar 2025
Independent Water Networks were proposing to carry out New service connection on Thane Road, Nottingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 20 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Independent Water Networks on 11 Dec 2024 at 11:53.
7 Jan and 20 Mar 2025
Independent Water Networks were proposing to carry out Utility asset works on Thane Road, Nottingham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 20 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Independent Water Networks on 11 Dec 2024 at 11:58.
7 Jan and 20 Mar 2025
Electricity Network Company were proposing to carry out Utility asset works on Thane Road, Nottingham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 20 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 7 Jan 2025 at 10:42.
7 Jan and 20 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Thane Road, Nottingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 13 Dec 2024 at 11:02.
7 Jan and 20 Mar 2025
Electricity Network Company were proposing to carry out New service connection on Thane Road, Nottingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 20 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 11 Dec 2024 at 11:52.
Friday
Severn Trent Water are carrying out Utility repair and maintenance works on Main Street, Willoughby On The Wolds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 January 2025 at 12:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 15 Jan 2025 at 14:47.
7 Jan and 20 Mar 2025
Independent Water Networks are proposing to carry out Utility asset works on Thane Road, Nottingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Independent Water Networks on 13 Dec 2024 at 11:03.
7 Jan and 20 Mar 2025
Independent Water Networks were proposing to carry out Utility asset works on Thane Road, Nottingham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 20 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Independent Water Networks on 7 Jan 2025 at 10:43.
7 Jan and 20 Mar 2025
Open Fibre Networks are proposing to carry out New service connection on Thane Road, Nottingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Open Fibre Networks on 13 Dec 2024 at 11:03.
7 Jan and 20 Mar 2025
Open Fibre Networks were proposing to carry out New service connection on Thane Road, Nottingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 20 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Open Fibre Networks on 7 Jan 2025 at 10:41.
Tomorrow
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wymeswold Road, Wysall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 12 Dec 2024 at 10:11.
Tomorrow
Nottinghamshire County Council are carrying out Works for road purposes on Wymeswold Road, Wysall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 January 2025 at 08:00 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 16 Jan 2025 at 08:01.
Tomorrow
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wymeswold Road, Wysall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 17 Sep 2024 at 17:08.
Tomorrow
Nottinghamshire County Council were proposing to carry out Works for road purposes on Wymeswold Road, Wysall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 20 Nov 2024 at 08:36.
23 and 31 Jan 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wymeswold Road, Thorpe In The Glebe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 12 Dec 2024 at 10:13.
23 and 31 Jan 2025
Nottinghamshire County Council were proposing to carry out Works for road purposes on Wymeswold Road, Thorpe In The Glebe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 20 Nov 2024 at 08:38.
23 and 30 Jan 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wymeswold Road, Thorpe In The Glebe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 12 Dec 2024 at 16:38.
23 and 31 Jan 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wymeswold Road, Thorpe In The Glebe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 24 Sep 2024 at 10:54.
27 and 31 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Dunsmore Close, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 09:00.
27 and 31 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Dunsmore Close, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 11:05.
27 and 31 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Shaw Street, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:42.
27 and 31 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Shaw Street, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 17:01.
27 and 31 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Shaw Street, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 16:30.
27 Jan and 18 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Hungary Lane, Sutton Bonington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 9 Dec 2024 at 14:39.
27 Jan and 13 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Cedar Avenue, East Leake.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 16:30.
27 Jan and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Woodgate Road, East Leake.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 16:30.
27 Jan and 18 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Hungary Lane, Sutton Bonington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 21 Jan 2025 at 16:29.
27 Jan and 24 Feb 2025
Nottinghamshire County Council are proposing to carry out Highway improvement works on Wolds Drive, Keyworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 29 Nov 2024 at 14:42.
2 and 4 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Attenborough Lane, Attenborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Dec 2024 at 12:52.
2 and 4 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Attenborough Lane, Attenborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 17 Nov 2023 at 12:56.
3 and 14 Feb 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Keyworth Lane, Bunny.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the verge only.
This roadwork event was last updated by Nottinghamshire County Council on 4 Nov 2024 at 11:51.
3 and 14 Feb 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Keyworth Lane, Bunny.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 29 Oct 2024 at 16:47.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mulberry Way, East Leake.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 16:40.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wilford Road, Ruddington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 07:43.
3 and 18 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Manor Park, Ruddington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 07:43.
3 and 5 Feb 2025
Severn Trent Water were proposing to carry out New service connection on Charles Street, Ruddington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 21 Jan 2025 at 15:25.
3 and 5 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Parkyns Street, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 21 Jan 2025 at 15:48.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Brookside Avenue, East Leake.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 16:40.
10 and 24 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Bunny Lane, Keyworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Nov 2024 at 15:42.
10 and 24 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Bunny Lane, Keyworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 11:45.
10 and 28 Feb 2025
Severn Trent Water were proposing to carry out Utility asset works on Loughborough Road, West Bridgford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 15:54.
17 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Burnside Grove, Tollerton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 14:13.
17 and 21 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out Disconnection or alteration of supply on Longlands Road, Beeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Jan 2025 at 15:25.
17 Feb and 19 May 2025
Cadent Gas are proposing to carry out Utility asset works on Tollerton Lane, Tollerton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 14:17.
25 and 28 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Musters Road, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 16:45.
25 and 28 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Musters Road, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 11:36.
25 and 28 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Asher Lane, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 16:45.
25 and 28 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Asher Lane, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 11:35.
3 and 23 Mar 2025
Nottinghamshire County Council are proposing to carry out Highway improvement works on Wolds Drive, Keyworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Nottinghamshire County Council on 24 Oct 2024 at 10:42.
5 and 7 Mar 2025
Severn Trent Water are proposing to carry out New service connection on Charles Street, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 14:21.
10 and 14 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Musters Road, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 27 Nov 2024 at 16:59.
10 and 14 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Wordsworth Road, West Bridgford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 23 Dec 2024 at 16:07.
10 Mar and 27 May 2025
Independent Water Networks are proposing to carry out Utility asset works on Thane Road, Nottingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Independent Water Networks on 16 Jan 2025 at 10:26.
10 Mar and 27 May 2025
Open Fibre Networks are proposing to carry out New service connection on Thane Road, Nottingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Open Fibre Networks on 16 Jan 2025 at 10:26.
10 Mar and 27 May 2025
Electricity Network Company are proposing to carry out Utility asset works on Thane Road, Nottingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 16 Jan 2025 at 10:26.
17 and 28 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Kirk Ley Road, East Leake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 7 Jan 2025 at 12:10.
17 and 19 Mar 2025
Severn Trent Water are proposing to carry out Disconnection or alteration of supply on Easthorpe Street, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 15:13.
17 and 19 Mar 2025
Severn Trent Water are proposing to carry out Disconnection or alteration of supply on Easthorpe Street, Ruddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 27 Dec 2024 at 10:22.
17 and 19 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Grasmere Gardens, Gotham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 10 Jan 2025 at 11:22.
17 and 19 Mar 2025
Nottinghamshire County Council are proposing to carry out Works for road purposes on Grasmere Gardens, Gotham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nottinghamshire County Council on 8 Jan 2025 at 15:50.
20 Mar and 20 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Wilford Road, Ruddington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 16:41.
5 and 21 Apr 2025
Nottinghamshire County Council are proposing to carry out Highway improvement works on Lantern Lane, East Leake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 24 Oct 2024 at 11:03.
5 and 21 Apr 2025
Nottinghamshire County Council were proposing to carry out Highway improvement works on Lantern Lane, East Leake.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 April 2025 and run through until 21 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Nottinghamshire County Council on 24 Oct 2024 at 10:03.
14 and 18 Apr 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Street, Willoughby On The Wolds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Jan 2025 at 11:44.
Roadworks Map near to Albert Road, NOTTINGHAM, NG11 6QE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Albert Road, NOTTINGHAM, NG11 6QE (2 Events)
(Scheduled Dates)
(miles)
(Scheduled: 10 Jan 2025 - 31 Jan 2025)
(Scheduled: 20 Jan 2025 - 24 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.